Technology Review and Budget Transmittal
This transmittal with all required information shall be completed and submitted with the Technology and applicable Electrical Drawings and Specifications before a design review will be completed. Provide a separate transmittal per building.
District /Transmittal Date
Project Name / S.F. / Design Based on OSDM YearProject CM /
Ref. Job #:
Technology Design Firm / Technology DesignerTechnology Review Firm / Technology Reviewer
Submittal Complies With: OSFC D/D Submission Req. OSFC C/D Submission Req.
It is the Technology Designer’s responsibility to adhere to the OSFC policy that “The Bidding Documents must allow for unrestricted competition among interested suppliers and manufacturers to the extent that it is feasible.”
Technology Systems Review and Construction Budget ChecklistIndicate which technology systems are included for review with this submission and budgeted cost per S.F. or lump sum of each system. * Indicate reason if system(s) are not included in Project, on cost line.
Included / Not Included* / Technology System / DIV. 26 / DIV. 27 / 28$/SF / Total / $/SF / Total
Technology Electrical Work
(Boxes, Raceway, Grounding & Power)
Technology Cabling
LAN Network Electronics
Wireless Network Electronics
IP-Enabled PABX System (Option)
Broadband Video RF Dist. Systems
Video Display Equipment
Interactive A/V Equipment
Digital On Demand Inst. Del.
Classroom A/V Systems
Central Sound & Paging Systems
Gymnasium Audio Systems
Auditeria Audio Systems
Music Room(s) Audio Systems
Classroom Sound Reinf. Systems
Wireless Clock System
CCTV – Legacy DVR-Based System
CCTV – New IP-Based System (Option)
Access and Intrusion System
Technology Construction Totals
Optional Systems – Not Baseline
TV Studio
Interactive A/V Equipment (over baseline)
CAT – 6 Upgrade
High School Auditorium
Enhanced Security Package
AV Control Systems
Other: (Provide Explanation)
Variance List
Project Variance
A variance is required as outlined in the OSDM. Project designs WILL NOT be approved if completed and approved variance request documentation is not included with phase submission.
Identify if any technology variances have been previously submitted and approved by OSFC. Attach approval documentation.
N/A – No Variances Required
- Variance 1 – Description
- Variance 2 – Description
- Variance 3 – Description
Project Contact / Distribution List
Project Contacts
Position / Name / EmailOFCC Planner
OFCC Project Administrator
OFCC Technology Reviewer
RPC/CM
Project Architect
Technology Designer
ATTACHMENT: OSFC Policy and Procedure Memorandum (Standards for Specifications) dated Dec. 2007, total of 2 pages.
F299-05v0813Page 1