ENVIRONMENTAL INCIDENT REPORT FORM

REPORTABLE INCIDENT

NAME OF OPERATOR:
BUSINESS ADDRESS:
RELEVANT ENVIRONMENT PLAN:
DATE AND TIME OF INCIDENT:
DATE AND TIME OF VERBAL NOTIFICATION:
DETAILS OFPERSON MAKING REPORT:
NAME: TELEPHONE: / EMAIL:
DETAILS OF WITNESS/WITNESSES:
NAME: / TELEPHONE: / EMAIL:
LOCATION:
NAME OF SITE:
SITE LOCATION (Including coordinates):
PETROLEUM PERMIT/TITLE/SPA NUMBER:
INCIDENT SITE (TICK AS REQUIRED):
OFFSHORE (CWTH WATERS) / □ / VESSEL / □
OFFSHORE (STATE WATERS) / □ / PIPELINE / □
ONSHORE (MAINLAND) / □ / DRILLING UNIT / □
ONSHORE (ISLAND) / □ / PRODUCTION FACILITY / □
ONSHORE (INLAND WATERS) / □ / OTHER / □
ACTIVITY BEING UNDERTAKEN AT TIME OF THE INCIDENT:
ENVIRONMENTAL CONSEQUENCE LEVEL(TICK ONE, AS DEFINED BY RELEVANT ENVIRONMENT PLAN):
CATASTROPHIC / □ / MODERATE / □ / COMMENT:
MAJOR / □ / MINOR / □
INCIDENT TYPE:
UNAUTHORISED CLEARING / □ / SPILL INCIDENT / □
FAUNA INCIDENT / □ / ATMOSPHERIC RELEASE / □
FIRE / □ / OTHER / □
DESCRIPTION OF INCIDENT:
ANY SAFETY CONCERNS ASSOCIATED WITH THE INCIDENT:
ENVIRONMENTAL CONCERNS (FILL IN AS APPLICABLE):
VOLUME OF MATERIAL SPILLED / RELEASED (Gas - m3, Liquid - L)
SIZE OF AREA AFFECTED (m2)
TYPE / COMPOSITION OF MATERIAL SPILLED / RELEASED
TOXICITY OF FLUID RELEASED
DURATION OF RELEASE / FIRE
HAS RELEASE / FIRE STOPPED? YES/NO
IF NO, WHAT IS THE RATE OF RELEASE / FIRE PROPAGATION
HAVE DISPERSANTS BEEN APPLIED TO THE SPILL? YES/NO
IF YES, NAME OF DISPERSANT?
WAS APPROVAL GIVEN TO USE DISPERSANT? YES/NO
IF YES, BY WHOM?
HAS THE EMERGENCY RESPONSE PLAN (INCLUDING AN OSCP IF APPLICABLE) BEEN PUT INTO ACTION? YES / NO
WHAT IS THE DIRECTION OF / MOVMENT OF THE SPILL / FIRE?
WHAT ARE THE MAIN ENVIRONMENTAL SENSITIVITIES IN THE AREA AND IS THERE A POTENTIAL FOR THESE TO BE IMPACTED AS A RESULT OF THE INCIDENT (I.E. WHAT IS THE DISTANCE OF THEENVIRONMENTAL SENSITIVITIES FROM THE SOURCE OF THE RELEASE / FIRE)?
ENVIRONMENTAL CONDITIONS AT TIME OF INCIDENT (WHERE RELEVANT):
WIND SPEED & DIRECTION
SEA STATE
CURRENT SPEED & DIRECTION
WATER DEPTH
TEMPERATURE
VISIBILITY
PRECIPITATION
TOPOGRAPHY
OTHER INFORMATION
IMMEDIATE RESPONSE ACTION TAKEN (BY PERSON/OPERATOR MAKING REPORT) AND INTERNAL INSTRUCTIONS:
COMMENTS:
HAS THE SITE BEEN MADE SAFE AND SECURED TO PRESERVE IT FOR INVESTIGATION? YES/NO
COMMENTS:
ANY INSTRUCTIONS PROVIDED BY DMP ENVIRONMENT DUTY OFFICER UPON INITIAL NOTIFICATION? YES/NO
COMMENTS:
HAS AN INVESTIGATION BEEN INITIATED/CONDUCTED? YES/ NO
IF YES, BY WHOM?
COMMENTS:
HAVE ANY OTHER AGENCIES BEEN NOTIFIED?
AGENCY / NAME OF CONTACT / TIME & DATE / DETAILS
COMMENTS:
IS FURTHER ACTION REQUIRED? (I.e. Remediation)
FURTHER ACTION REQUIRED BY:
HAS THIS PERSON BEEN NOTIFIED? YES/NO
NAME:
TITLE:
TELEPHONE:
EMAIL:
ACTION:
Corrective actions to prevent recurrence:

FORM COMPLETE

ENV-PEB-189Page 1 of 3Rev.3.0

Department of Mines and PetroleumPetroleum Environment BranchLast Modified 14/12/2012