E4.01.1F1 Risk Assessment Record
Workplace
/ AssessmentNumber
Task / Activity
/ Tele-handlerDate Conducted
/Review by Date
/Date Reviewed
Assessment Team
/ Lead /Assessors
Existing Measures Taken to ControlRisks from the Hazard
/ PresentRisk / Controls Required to Allow Task to Start / Continue / Residual
Risk
1
Hazard / 2
Hazard
Effect / 3 At Risk / 4
Existing Control Measures / 5 Severity / 6 Probability / 7 Risk Rating / 8
Further Control Measures / 9 Severity / 10 Probability / 11 Risk Rating / 12 Acceptable? / 13
Further Actions to Reduce Risk Further / 14 Completed
Falling Load / Death / A / 5 / 4 / 20 / · Ensure the load is stable and secure prior to lifting.
· Ensure the load is within the lifting capabilities of the machinery.
· Use trained competent operator. / 5 / 1 / 5
Operator / Death / E / 5 / 4 / 20 / · Ensure operative is trained in the use of the tele -handler and holds an up to date licence.
· Ensure the operative is fit to operate the machinery.
· Supervise operator. / 5 / 2 / 10 / ✓
Collision / Death / A / 5 / 4 / 20 / · Ensure all round visibility from operator station. I.e. mirrors or cctv.
· Use trained competent operator.
· Observe any site traffic management systems when moving around the site.
· Conduct pre start checks. / 5 / 1 / 5
Vehicle overturn / Death / A / 5 / 3 / 15 / · Ensure Telehandler is suitable for site ground conditions.
· Ensure traffic routes are flat and even, identify any hazardous areas.
· Maintain vigilance whilst driving.
· Identify any excavations; restrict access to within 1m of the excavation. / 5 / 1 / 5
Over head obstructions / Death / E / 5 / 5 / 25 / · Assess above the work area and highlight any obstructions.
· Banks man must be used if height restrictions are applicable. / 5 / 2 / 10
Falling Objects / Death / E / 5 / 4 / 20 / · Ensure the load is securely loaded
· Whilst using with the pressure sucker, DO NOT manoeuvre the arm whilst glass is loaded. Position hoist and sucker prior to glass being loaded. / 5 / 1 / 5
Authorised by
The Responsible Manager /
Name:
/ Signed: / Dated:At Risk / Severity / Probability / Risk Rating / Issue: 2
Issue Date: October 2002
E - Employees / 1 / No Injury / 1 / Very Unlikely / 1 – 5 / LO W / A - Acceptable
C - Contractors / 2 / Minor Injury / 2 / Unlikely / 6 - 14 / MEDIUM / M - More Analysis Required
V - Visitors / 3 / +3 Day Absence / 3 / Likely / 15 - 25 / HIGH / U – Unacceptable Risk
P - Public / 4 / Major Injury / 4 / Very Likely
A - All / 5 / Death / 5 / Virtually Certain