Attachment #1 To Change Order #2
VENDOR CONTRACT #B90061
5-1-1999 Through 4-30-2002
SALMON BAY SAND AND GRAVEL COMPANY
5228 SHILSHOLE AVE NW
SEATTLE WA 98107
TEL: (206) 784-1234
FAX: (206) 781-0984
CONCRETE PAVING TOOLS
Description / Marshalltown Tool # / Price12”x3” Cement Trowel / MXS56 / $16.03
14”x3” Cement Trowel / MXS57 / $17.94
16”x3” Cement Trowel / MXS60 / $19.91
12”x4” Cement Trowel / MXS62 / $16.36
14”x4” Cement Trowel / MXS64 / $18.17
14”x4” Trowel W/Durasoft Handle / MXS64D / $19.25
16”x4” Cement Trowel / MXS66 / $20.23
16”x4” Trowel W/Durasoft Handle / MXS66D / $21.14
16”x4” Cement Trowel/Rounded One End / MXS66RE / $20.59
18”x4” Cement Trowel / MXS81 / $21.97
14”x4” Trowel W/Durasoft Handle / MXS81D / $22.83
18”x4” Cement Trowel/Rounded One End / MXS81RE / $22.18
20”x4” Cement Trowel / MXS20 / $23.38
20”x5” Cement Trowel / MXS205 / $23.55
20”x5” Cement Trowel W/Durasoft Handle / MXS205D / $24.27
20”x5” Cement Trowel/Rounded One End / MXS205RE / $24.33
20”x4” Trowel W/Durasoft Handle / MXS20D / $24.21
Stanley/Goldblatt #
24”x5” Blue Steel Pool Trowel / 06-191 / $19.65
Stanley/Goldblatt #
Adaptor Bracket-Trowel to Fresno / 16-289 / $ 8.31
Kraft Tool #
Fresno Adptr. for screw-on handles / CC662 / $ 4.37
Marshalltown Tool #
Handle Starter Adapt./Push Button to Screw / BF-8 / $ 6.47
Handle Starter Adapt./Screw to Clevis / BFH-9 / $ 7.97
Handle Starter Adapt./Push Button to Clevis / FT-6 / $ 4.59
Richards Brush #
Brushes, Cement Finishing 36” Wood Frame Nylon filled / 1220 / $32.51
Brushes, Cement Finishing 48” Wood Frame Nylon filled / 1221 / $39.89
Kraft Tool #
24” Alum. Bound Cement Finish Brush / CC175 / $32.40
36” Alum. Bound Cement Finish Brush / CC177 / $43.47
48” Alum. Bound Cement Finish Brush / CC178 / $54.55
Richards Brush #
Brushes, Cement Paving, 36” Wood Frame Wire filled 1/ / 1225 1/2” / $70.58
Brushes, Cement Paving, 48” Wood Frame Wire filled 1/ / 1226 1/2” / $80.49
Uni-Dapt #
Brackets, Adjustable Bullfloat / 4GH / $ 22.13
Brackets, Adjustable Fresno / 2 / $ 22.13
Brackets, Adjustable Snap Handle Adaptor / PB / $ 11.61
Superior Tools #
Rock-it Adjustable Bullfloat Bracket / 16RKTE / $ 45.80
Marshalltown Tool #
E-Z Grip Brick Trowel W/Foam Handle / 19-11BG / $ 19.70
Red Foam Grip Brick Trowel / 19-11FGS / $ 21.20
E-Z Grip Brick Trowel W/Foam Handle / 33-11BG / $ 19.70
Red Foam Grip Brick Trowel / 33-11FGS / $ 21.20
5” Pointing Trowel / 45-5 / $ 6.62
6” Pointing Trowel / 45-6 / $ 6.62
Marshalltown Tool #
5”x2” Margin Trowel / 52 / $ 6.62
5”x1 1/2” Margin Trowel / 54 / $ 6.62
6”x2” Margin Trowel / 56 / $ 7.10
16” Cast Magnesium Hand Float / 148 / $ 12.88
20” Cast Magnesium Hand Float / 146 / $ 16.01
Stanley/Goldblatt #
16” Extruded Magnesium Float / 06-150 / $ 11.51
16” Thinline Magnesium Float / 06-164 / $ 11.51
Haivala Tool #
16” Cast Magnesium Float / HF-16 / $ 15.41
Kraft Tool #
30”x5” Calif. Fresno / CC850 / $ 28.71
36”x5” Calif. Fresno / CC851 / $ 31.99
42”x5” Calif. Fresno / CC852 / $ 35.20
48”x5” Calif. Fresno / CC853 / $ 38.01
Kraft Tool #
42”x8” Extruded Magnesium Bullfloat / CC801 / $ 62.20
48”x8” Extruded Magnesium Bullfloat / CC802 / $ 66.30
54”x8” Extruded Magnesium Bullfloat / CC754 / $ 75.19
60”x8” Extruded Magnesium Bullfloat / CC760 / $ 79.98
Kraft Tool #
1 3/4”x6’ Magnesium Bullfloat Handle / CC226 / $16.75
1 3/4”x8’ Magnesium Bullfloat Handle / CC227 / $22.90
Stanley/Goldblatt #
5’ Wood Handle W/Clevis end / 16-286 / $12.07
Stanley/Goldblatt #
Edgers curved end 6”x3”x1/4” Rad. / 06-241 / $ 4.84
Edgers sidewalk 6”x3”x1/4” Rad. / 06-263 / $ 5.28
Kraft Tool #
4”x6”x1/8” rad. Blue Cement Edger / CF567 / $ 3.14
4”x6”x1/4” rad. Blue Cement Edger / CF572 / $ 3.69
4”x6”x3/8” rad. Blue Cement Edger / CF573 / $ 3.69
4”x6”x1/2” rad. Blue Cement Edger / CF574 / $ 3.69
6”x6”x1/4” rad. Blue Cement Edger / CF575 / $ 4.37
6”x6”x3/8” rad. Blue Cement Edger / CF576 / $ 4.37
6”x6”x1/2” rad. Blue Cement Edger / CF577 / $ 4.37
6”x6”x1/8” rad. Blue Cement Edger / CF579 / $ 4.37
9”x4” 1/4” rad. Blue Walking Edger/less hdl. / CC390-01 / $ 7.18
9”x4” 3/8” rad. Blue Walking Edger/less hdl. / CC391-01 / $ 7.18
9”x4” 1/2” rad. Blue Walking Edger/less hdl. / CC392-01 / $ 7.18
9”x6” 1/4” rad. Blue Walking Edger/less hdl. / CC393-01 / $ 7.66
9”x6” 3/8” rad. Blue Walking Edger/less hdl. / CC394-01 / $ 7.66
9”x6” 1/2” rad. Blue Walking Edger/less hdl. / CC395-01 / $ 7.66
9”x6” 3/4” rad. Blue Walking Edger/less hdl. / CC396-01 / $ 7.66
Kraft Tool #
9”x10”x1/2” rad. Blue Walking Edger/less hdl. / CC399-01 / $ 8.00
9”x10”x3/4” rad. Blue Walking Edger/less hdl. / CC400-01 / $ 8.00
Stanley/Goldblatt #
Western Groover-2”x3”x3/16” deep / 06-201 / $ 7.49
S.S. Jumbo Groover 6”x4 3/4”x1/2” deep / 06-209 / $13.60
Kraft Tool #
5 1/2”x3” Bronze Groover / CF260 / $ 9.57
6”x4 1/2” Bronze Groover / CF303 / $12.99
6”x4 1/2” Bronze Groover / CF304 / $15.38
6”x4 1/2” Bronze Groover / CF314 / $17.09
6”x4 1/2” Bronze Groover-Walking type / CC314-LH01 / $18.46
6 1/2”x3” Bronze Groover / CF380 / $12.99
Salmon Bay S & G #
Sidewalk Marking Tool-2 5/8”x3 3/16”x3/16” deep / LD-1 / $35.54
Walking Sidewalk Marking Tool-2 5/8”x3 3/16”x3/16” / LDW-1 / $39.65
S.S. Repl. Plate for Sidewalk Marking Tool / LDRP / $19.14
Stanley/Goldblatt #
Knee Pads Leather & Felt / 06-187 / $16.58
Alta #
Knee Pads Proline W/Velcro Strap / 50900
Knee Pads Nomar W/Velcro Strap / 50420 / $19.86
Knee Pads Superflex W/Velcro Strap / 50410 / $19.86
Knee Pads Proline W/Button Strap / 50903 / $17.10
Knee Pads Nomar W/Button Strap / 50423 / $19.86
Knee Pads Superflex W/Button Strap / 50413A / $19.86
Stanley/Goldblatt #
Screeds Magnesium 2”x4”x12’ / 16-451 / $101.93
Screeds Magnesium 2”x5”x16’ / 16-516 / $161.65
Kraft Tool #
Screeds Magnesium 1 1/2”x3 1/2”x10’ / CC610 / $ 83.39
Screeds Magnesium 1 1/2”x3 1/2”x12’ / CC612 / $ 95.70
Screeds Magnesium 1 1/2”x3 1/2”x14’ / CC614 / $109.37
Screeds Magnesium 1 1/2”x3 1/2”x16’ / CC616 / $120.30
Kraft Tool #
6”x3”x1” 60 grit Rub brick / CF282 / $ 9.23
6”x3”x1” 20 grit Rub brick / CF283 / $ 9.23
Stanley/Goldblatt #
Tubs, Plastic Mixing 26”x20”x6” / 09-482 / $ 5.67
Tubs, Plastic Mixing 36”x24”x8” / 09-483 / $ 17.09
Stanley/Goldblatt #
Bags, Canvas Tool-22” W/Leather Bottom / 09-122 / $ 42.35
Kraft Tool #
Canvas Tool Bag W/Steel Frame / WL020 / $ 22.56
Canvas Tool Bag-Economy Model / WL050 / $ 13.53
This contract may be further expanded to include other paving tools not listed above provided that the supplier prices them at the same discount as those specifically listed.
All orders are limited to $5,000.00 each. The City of Seattle will not authorize payment for any order exceeding that amount without prior approval by the Buyer, D. Mayes, at (206) 684-0222.
FOB: Destination
Freight: Prepaid and Allowed
Payment Terms: 2% 10th / Net 30
During the term of this contract either party may propose changes, provided 30 days advanced written notice is furnished.
Page 4 of 4
