CherryLynMallari
Architect
Murjan 1, JBR, Dubai UAE
Mobile: 050 301 32 49 Tel: 009714 442 8924 Email:
CAREER Objective / To obtain a permanent position in the field of design development, utilizing a strong background in design management, organization and communication skills with the aim of promoting the utmost standards of architectural profession and to achieve challenging opportunities for the productive service to the company.
PROFESSIONAL Qualification / Registered Architect, Manila, Philippines
Passed the National Board Examination for Architects
PRC No. 0019059
KEY Qualification / Design Managementand Coordination withmore than 12 years professional experience from architectural design consulting offices and high end real estate developers. Commercial awareness,thorough knowledge of design processes, international and local standards along with multi-disciplinary design coordination, production of reports, agreements and management of RFPs.
EDUCATION / Bachelor of Science in Architecture(1996-2001), Mapua Institute of Technology, Manila, Philippines
Consistent Dean’s Lister
Finished Project Management Professional Course from Cambridge, Dubai (PMP)
AFFILIATION / United Architects of the Philippines-Intramuros Chapter (UAP)
PROFESSIONAL EXPERIENCE
PEARL DUBAI
FZ LLC
May 2009-Present
Position:
SENIOR ARCHITECT/
PROJECT COORDINATOR
Dubai Media City, Dubai United Arab Emirates
/ Pearl Dubai is a consortium of investors led by Al Fahim Group, and developers of the Dubai Pearl Project. Dubai Pearl is a fully-integrated, mixed-use urban community where wellbeing is balanced through a sequence of WORK PLAY STAY LIVE experiences in an environment that facilitates interaction and will provide high standards in anattractive eco-sensitive environment.
At 10.8 million sq.ft., Dubai Pearl will comprise four iconic towers, premium offices, international retail and dining options, five star-hotels including the Baccarat and Bellagio Hotel & Residences, a 1,800-seat theatre, upscale ballroom facilities, as well as pedestrian walkways.
Working closely with the Senior Vice President of Design Management, duties include:
Coordination with various international and local consultants to ensure the project and stakeholder requirements are met
Ability to evaluate drawings and schedule and identify missing information.
Preparation and review of design deliverables in accordance to Tecom, Dubai Municipality, Civil Defence Regulations, LEED guidelines, NFPA and others.
Providing design review and recommendations for works done by other consultants.
Preparing area programmes for the various components of the Project.
Monitoring and Reporting of Consultants’ progress
Developing and maintaining Project Documentation
Planning and participating in progress meetings and workshops with Consultants, Operators and other stakeholders
Prepare, issue and manageArchitectural Tenders and ensuring the response complies with all the prerequisites,recommendation for short-listing Consultants, interviewing prospective consultants, issuing of Addendums,Technical and Commercial Reports, including review of LOIs and Agreements; tenders managed and executed include:
-Architectural, Interior Design and Landscaping Consultancy/Competition
-Interior Design
-Design and Build of Automated Waste Collection System
-Static and Dynamic Signage
-Design and Build of Swimming Pools
-Kitchen and Laundry including Cold Stores
Prepare and review contract agreements
Certification of Consultants’ fees
Assisting in preparation of briefs and design concepts
Inventory of the project area take-offs in coordination with the Marketing Department
LEED documentation
Report prepared researching the possibility of Dubai Pearl to be viable as a Clean Development Mechanism (achieving carbon credits as per the Kyoto Protocol)
Providing cover for the Design Manager
PMDC
Mar.‘08- Apr. 2009
Position:
SENIOR ARCHITECT
Business Bay,
Dubai UAE
/ Project Management and Development Consultantsis a privately owned company which offers project managementservices including Master Planning and the full life-cycle of Pre-Contract and Post-Contract planning, engineering, and inspection for major design and construction projects.
The applicant was part of the Project Management Team for Dubai Pearl, until its withdrawal from the Project in February 2009, and then was reposted for Al Ghadeer Development in Abu Dhabi for Sorouh Real Estate.
A summary of various duties include:
Reporting directly to the Design Director and working as a Project Coordinator/Architect, collaboration with various international consultants for the design management of the project.
Providing technical support for the design management team
Assisting in the master planning design.
Reviewing of plans and proposals to ensure that all of the Client requirements are met, and to comply with the government standards and regulations.
Explores the market for required Consultants for the project, evaluating capabilities and scope of work if able to comply with the required services.
Conducting initial interviews with Consultants for pre-qualification.
Prepares LOI’s, RFP’s, RFI’S, RTQ’s, Progress and Technical Reports and Agreements.
Conducting design competitions for interior, architectural works.
Coordinator for design competitions and request for tenders.
Establishment of online documentation system for the project, specifically Aconex, as a Project
Administrator.
ARCHDOME CONSULTING ENGINEERS
Jan.2005- Mar. 2008
Position:
ARCHITECT
Deira, Dubai UAE
/ Local Architectural Consulting Officewhich offers design services from initial concept to project execution.
Responsibilities include:
Design of an array of projects, from multi-storied residential and office buildings, civic buildings, private and investment villas.
Meet clients to discuss project scope.
Coordination with various liaison engineers (Dubai Municipality, Tecom, Civil Defence, DEWA, Dubai Investment Park), contractors and suppliers.
Prepare and monitoring of project schedule using Primavera software.
Checking and revising previously designed projects from other consultants.
Prepare feasibility reports, project studies, progress reports, design concepts and other documentation related to supervise a project.
Explore the market for appropriating materials within the scope of the budget.
Render presentation boards using adobe Photoshop.
Coordinate with other disciplines, i.e. structural, MEP and site engineers.
Attend to Dubai Municipality for project discussion
Approve materials according to the project specifications.
Projects designed:
B+G+M+1 Dubai Electric and Water Authority Offices, Workshops, Control building, Parking at Al Aweer, Total Area: 600,817 sq.ft.
G+M+2 Dubai Club for Special Sports Stadium at Al Qusais, Total Area: 67,163 sq.ft.
Additions to Dubai Ladies Club at Jumeirah 2 , Total Area: 137,582 sq.ft.
B+G+M+1 Dubai Electric and Water Authority Offices, Workshops, Control building, Parking at Al Quoz, Total Area: 87,882 sq.ft.
B+G+5 Residential Building at Dubai Investment Park (for Saleh Bin Lahej Real Estate), Total Area: 162,443 sq.ft.
B+G+2+Gym Multi-level Parking for Jebel Ali Free Zone Authority
G+3M+20+Gym Residential Building at Bahrain , Total Area: 126,536 sq.ft.
2B+G+12+Gym Residential Building at Al Qusais 1
G+1 Sameer Abassi (52 Nos. Villa)
G+1 Shk Faisal Al Qasimi (32 Nos. Villa)
G+ 1 Buti Obaid Al Mulla (24 Nos. Villa)
G+1 Noora & Hind Al Ashram (18 Nos. Villa)
G+1+ Roof Mohd Rasool Khoori (8 Nos. Villa)
G+1 Yousuf Ali Ahmad Ali Mohd (6 Nos. Villa)
G+1 Abdullatif Abullah Al Mulla (5 Nos. Villa)
G+ 1 Fatima Abdulla Al Shamsi Villa (3 Nos. Villa)
Lot of private villas
BRITTANY CORPORATION (VISTA LAND)
Mar. 2001-Dec.2004
Position:
ARCHITECT
Alabang Muntilupa,
Philippines
/ Philippine’s leading provider of unique upscale real estate developments, Brittany Corporation specializes in the creation of themed, luxury residential properties.
Responsibilities:
Direct conceptual, strategic and planned creation of various residential projects
Challenged with design issues concerning topographical, economical, social and commercial needs
Finished a master planned design of a 500 hectare residential community; Portofino South in Alabang, Muntinlupa Philippines
Designed model houses and multifamily dwellings
Directed and monitored the work of Consultants, Contractors, and Sub-contractors.
Aid in the preparation of architectural and engineering guidelines as per subdivision needs
Reviewed and analyzed tenders, quotations and proposals from architectural consultants, contractors and suppliers based on which reports were prepared and recommendations made to the management
Specification writer
Contract document writer
Site inspection, managed 6 simultaneous housing projects, successfully meeting all budgets and timeframes
PERSONAL
DATA / Date of Birth: November 29, 1979Marital Status : Married with one child
Place of Birth : Manila , PhilippinesNationality : Filipino
Availability : One month notice (holder of free zone visa)
SKILLS / M.S. Project
AutoCad
Microsoft Word, Excel and PowerPoint
Adobe Photoshop
Good in sketching and rendering, highly inquisitive and hardworking, could work long hours under pressure, highly social, has an eye for detail, dynamic and creative. Excellent team leader.
Multi-tasker, could work under minimum supervision.
Possess a valid UAE driving license

I attest that the above information is accurate. References to be provided upon request.

cherrylynmallari

mob: 050 3013249