QUALITYCENTER

1) Test management with QualityCenterinvolves...... Phases.

A) FourB) FiveC) SixD) Seven

2) The phases of Test management with QualityCenter in order are:

A) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Track Defects
B) Specify Requirements, Specify Releases, Plan Tests, Execute Tests, Track Defects
C) Specify Requirements, Plan Tests, Specify Releases, Execute Tests, Track Defects
D) Specify Releases, Specify Requirements, Plan Tests, Track Defects, Execute Tests

3) By creating a list of authorized users and assigning each user a password and user group, you control the kinds of additions and modifications each user makes to the project.

A) TrueB) False

4) The ...... determines the privileges that the user has within a project.

A) User IDB) User NameC) User groupD) User SID

5) You can import data from Word or Excel to a QualityCenter project.

A) TrueB) False

6) QualityCenter 9.2 prompts you to install Microsoft .NET ...... if it is not already installed on your machine.

A) Framework 2.0B) Framework 1.0
C) Framework 3.0D) Framework 4.0

7) When you connect to a project, the QualityCenter main window opens and displays the module in which you were last working.

A) TrueB) False

8) The ……. can change and override a user’s properties or password.

A) Global AdministratorB) Site Administrator
C) AdministratorD) QC Administrator

9) You can filter QualityCenter data to display only those records that meet the criteria that you define. How many filters can you define?

A) Single item as a filterB) Two items as a filter
C) Multiple items as filterD) Five items as filter

10) In the test plan tree, you can define the ...... filter for associated test sets as”Open”.This ensures that only tests that belong to an open test set are displayed.

A) DoubleB) TwiceC) CrossD) Multiple

Answers

11) By default, records appear in QualityCenter in the

A) Increasing OrderB) Decreasing Order
C) Order in which they were addedD) None of these

12) You can save filter and sort information as a favorite view and then load it as needed.

A) TrueB) False

13) You can copy and paste the filter, sort, and group by settings to another project.

A) TrueB) False

14) You can also share the settings (filter, sort, and group by settings) with another user by pasting them to an e-mail or a text file.
A) TrueB) False

15) When you use text search, the search ignores

A) articles (a, an, the)

B) Coordinate conjunctions (and, but, for, nor, or);
C) Boolean operators (and, or, not, if, or, then).
D) All of above

16) You can export the data in a grid as a

A) Textfiles,B) Microsoft Excel worksheet,

C) Microsoft Word document orD) HTML document.E) All of above

17) ...... alerting functions available in QualityCenter

A) ThreeB) FourC) TwoD) Five

18) The alerting functions in QualityCenter are:

A) Automatic notification alerts, Follow up alerts
B) Email alerts, Automatic notification alerts, Follow up alerts
C) Defect alerts, Email alerts, Automatic notification alerts, Follow up alerts
D) Final alerts, Email alerts, Automatic notification alerts, Follow up alerts

19) You can create traceability links between...... in the Requirements module.

A) RequirementsB) Test CasesC) TestsD) Defects

20) You can associate a test instance with a defect. This is performed by creating ...... in the Test Plan module, or by adding a defect during a manual test run.
A) Linked TestsB) Linked DefectsC) Linked ErrorsD) Linked Data

Answers

21) You can view a list of alerts for a ...... entity.

A) A test in the test plan tree or Test Grid
B) A test instance in the Execution Grid
C) None of above
D) Both A) & B)

22) A red flag indicates that the alert is......

A) NewB) OldC) Follow upD) Urgent

23) A gray flag indicates that the alert......

A) NewB) has already been readC) Follow upD) Urgent

24) A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.

A) TrueB) False

25) QualityCenter assigns the image a unique file name with a ..... Extension.

A) .jpegB) .gifC) .docD) .jpg

26) A ...... is a view of a QualityCenter window with the settings you apply to it.

A) Personal ViewB) My viewC) Favorite ViewD) My QC View

27) You save favorite views in ......

A) Favorite folderB) Personal folder

C) Both A & BD) Public & Private folder

28) You can define the number of views displayed on the menu by setting the ...... parameter in the Site Configuration tab in Site Administration.
A) favoritesB) favorites_DepthC) favorites_viewD) favorites_Path

29) The requirements specification workflow consists of the following:

A) Define Testing Scope, Create Requirements, Detail Requirements, Assign to Releases, Analyze Requirements
B) Define Testing Scope, Detail Requirements, Create Requirements, Assign to Releases, Analyze Requirements
C) Define Testing Scope, Create Requirements, Detail Requirements, Analyze Requirements, Assign to Releases
D) Define Testing Scope, Create Requirements, Analyze Requirements, Detail Requirements, Assign to Releases

30) Requirement topics are recorded in the Requirements module by creating a

A) Requirements cycleB) Requirements tree
C) Requirements planD) Requirements module

Answers

21) D, 22) A, 23) B, 24) A, 25) D, 26) C, 27) D, 28) B, 29) A, 30) B

31) QA Manager changes a requirement from a ...... status to a Reviewed status once it is approved.

A) ReleasedB) TestedC) Not reviewedD) None of these

32) You can also import requirements to your QualityCenter project from Microsoft Word, Excel, or other third-party requirement management tools. To import requirements, you must first install the appropriate......

A) HP Third Party add-in.B) HP Quality Center add-in.
C) HP Quality CenterD) HP Quality Center License

33) The Requirements Grid view enables you to display requirements in a ...... view.

A) FlatB) HierarchicalC) Flat-hierarchicalD) Flat non-hierarchical

34) The ...... view enables you to analyze the breakdown of child requirements according to test coverage status..
A) Coverage AnalysisB) Coverage Requirements
C) CoverageD) Coverage Tests

35) You can access the Requirements menu bar from the Requirements module by pressing the shortcut key ......

A) F1B) F9C) Ctrl + RD) Alt + R

36) You can use the ...... to restrict and dynamically change the fields and values in the Requirements module.

A) Script EditB) Scriptor EditorC) Script EditorD) Script Editing

37) The Requirements module enables you to define and manage your......

A) requirementsB) All requirements

C) some requirementsD) Tedious requirements

38) You can rename or delete Requirements root folder.

A) trueB) False

39) You can search for a particular requirement in the requirements tree or in the requirements grid using the ...... command.

A) SearchB) FindC) Search AllD) Find All

40) You can replace field values in the requirements tree or in the requirements grid using the ...... command.
A) ReplaceB) Replace All C) Find & ReplaceD) Replace & Find

Answers

31) C, 32) B, 33) D, 34) A, 35) B, 36) C, 37) A, 38) B, 39) B, 40) A

41) By default, QualityCenter sends e-mail in HTML format. To send e-mail as plain text instead, edit the ...... parameter in the Site Configuration tab in Site Administration.

A) EMAIL_FORMATB) EMAIL_FORM

C) MAIL_FORMAT D) QC_MAIL_FORMAT

42) You can copy a requirement within the same project or between projects. Which of the below items are copied at the time of copying a requirement.

A) Test coverage.B) defect linkage.
C) risk-based quality management dataD) All of aboveE) None of above

43) You can also move a requirement to a new location in the requirements tree by dragging it..

A) TrueB) False

44) You can delete a requirement from the Requirements module. Deleting a requirement does not delete its child requirements, tests coverage, requirement traceability links, and defects linkage..

A)TrueB) False

45) There are two methods you can use to create tests from requirements:

A) Convert Requirements to Tests & Generate a Test from Requirements
B) Convert Requirements to Tests & Convert a Test from Requirements
C) Convert Requirements to Tests & Generate a Requirement from Tests
D) Convert a Test from Requirements & Generate Requirements to Tests

46) When analyzing the impact of a change proposed in a specific requirement, the traceability links indicate the other ...... that the change might affect.

A) testsB) requirementsC) tests & requirementsD) None

47) ...... links indicate requirements that affect a selected requirement...... links indicate requirements that are affected by a selected requirement.

A) Trace from, Trace toB) Trace to, Trace from
C) From trace, To traceD) None of above

48) When a requirement changes, QualityCenter alerts the affected requirements. The alerts can be seen by......

A) Author of the requirement

B) users authorized by the Author of the requirement
C) all usersD) Administrator

49) while Defining Traceability Relationships, You cannot add a requirement traceability link by dragging a requirement from the requirements tree to the appropriate grid..

A) TrueB) False

50) While viewing Traceability Impact, the Impact Analysis tab helps you understand the many associations and dependencies that exist between the ...... by displaying them in a hierarchical tree structure.

A) TestsB) Requirements
C) BothD) None

Answers

41) C, 42) E, 43) A, 44) B, 45) A, 46) B, 47) A, 48) C, 49) B, 50) B

51) Each requirement type with risk-based quality management enabled supports either.

A) risk analysis or risk assessmentB) risk breakdown or risk assessment
C) risk breakdown or risk reviewD) risk analysis or risk evaluation

52) Performing a risk-based quality management analysis for an analysis requirement involves the following steps

A) Determine Risk groups, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy
B) Determine Risk Categories, Define Testing guidelines Settings, Finalize Testing Policy, Analyze Testing Strategy
C) Determine Risk Categories, Define Testing Policy Settings, Finalize Testing guidelines, Analyze Testing Strategy
D) Determine Risk Categories, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy

53) An ...... requirement is a requirement belonging to a type that represents higher levels in the requirements tree hierarchy, such as the Folder type.

A) analysisB) assessmentC) PolicyD) Test
54) An ...... requirement is a requirement belonging to a type that represents requirements that are children of analysis requirements and at a lower level in the requirements tree hierarchy.

A) analysisB) assessmentC) PolicyD) Test

55) For each assessment requirement under the analysis requirement, you determine the Risk Category. The Risk Category is composed of two factors.

A) Business Probability and Failure CriticalityB) Business Vitality and Failure Probability C) Business Criticality and Failure Probability
D) Business Criticality and Failure Possibility

56) The Business Criticality of a requirement has three possible values:.....

A) Critical, Important, Nice to HaveB) Critical, Importance, Nice to Have
C) Critical, Important, Nice to HadD) None of these

57) The Failure Probability of a requirement has three possible values:...

A) High, Standard, LowB) High, Average, Low
C) High, Medium, LowD) None of these

58) QualityCenter defines four Testing Levels:.

A) Full, Partial, Basic, and LowB) Full, Partial, Basic, and None
C) Full, Half, Basic, and NoneD) Full, Partial, Critical, and None

59) The Business Criticality of a requirement is a measure of how likely a test on the requirement is to fail, based on the technical complexity of the requirement...... ™s implementation, without consideration of the requirement...... ™s impact on the business.

A) TrueB) False

60) The Failure Probability of a requirement is a measure of how important the requirement is to your business

A) TrueB) False

Answers

51) A, 52) D, 53) A, 54) B, 55) C, 56) A, 57) C, 58) B, 59) B, 60) B

61) During Requirement Risks calculation, the ..... displays the requirements for which you did not determine a Risk Category or exclude explicitly from the analysis

A) missing assessment linkB) missing assessment field
C) missing assessment valueD) missing assessment relation

62) A good test plan enables you to assess the quality of your application ...... in the testing process.

A) at the beginningB) at the endC) at the pointD) at the middle

63) Which of the item is not a part of "Developing a test plan" in QC.

A) Design Test StepsB) Design Tests
C) Automate TestsD) Define Testing Policy Settings

64) You can access the Test Plan menu bar from the Test Plan module by pressing the shortcut key .....

A) F7B) F9C) F12D) F11

65) To find a specific test by Test ID in the Test Grid, choose ...... , and enter the test ID

A) Test > Go to TestB) Test > find Test
C) Test > search TestD) Test > link Test

66) In relation to a test plan module, You can add user-defined fields and change the label of any of the fields in the Test Grid

A) True,B) False

67) You can use the ..... to restrict and dynamically change the fields and values in the Test Grid.

A) text editorB) script editorC) scriptor editorD) scripts editor

68) The typical application is too large to test as a whole. The Test Plan module enables you to divide your application according to ......

A) functionalityB) requirementsC) test plansD) test modules

69) During the testing process, you may need to modify your test plan. You can update the test plan tree ......

A) at the beginningB) at the endC) at any timeD) in the middle

70) Developing and editing a test plan tree requires appropriate user ......

A) IDsB) requirementsC) permissionsD) passwords

Answers

61) A, 62) C, 63) D, 64) B, 65) A, 66) A, 67) B, 68) A, 69) C, 70) C

71) To set a Quick Test Professional test as a template test, right-click the test in the test plan tree, and choose ......

A) Template TestB) Template TreeC) Template PlanD) Template

72) You can change the label of any of the test detail fields.

A) TrueB) False

73) A question mark icon in the test plan tree indicates that the QuickTest Professional add-in is ...... on your machine.

A) not activatedB) not installedC) not enabledD) not set

74) A ...... link is included in the e-mail, enabling the recipient to go directly to the test.

A) Link To TestB) Move To TestC) Go To TestD) Test

75) In the Test Plan module, you create ...... by selecting requirements to link to a test.

A) RTMB) requirements coverageC) test coverageD) SRS

76) Alternatively, in the Requirements module, you create ...... by selecting tests to link to a requirement.

A) RTMB) requirements coverageC) test coverageD) SRS

77) A test can cover more than one requirement, and a requirement can be covered by only one test.

A) TrueB) False

78) You can also create coverage between test instances and requirements. You can enable this feature using the ...... parameter in Site Administration

A) ALLOW_REQ_COVERAGE_BY_TEST_INSTANCE
B) ALLOW_TEST_COVERAGE_BY_REQ_INSTANCE
C) ALLOW_R_COVERAGE_BY_T_INSTANCE
D) None of above

79) Requirements coverage is created automatically when you convert a requirement to a test. Therefore, even if you have not yet added
requirements coverage, it may already exist.

A) TrueB) False

80) You can also define requirements coverage by dragging a requirement in the requirements tree to the coverage grid. The requirement is added to the coverage grid without its child requirements.

A) TrueB) False

Answers

81) Test coverage is created automatically when you generate a requirement from a test.

A) TrueB) False

82) In the Requirements module, you can use the ...... view to examine the status of your requirements.

A) Coverage AnalysisB) Coverage Breakdown
C) Requirements StatusD) Coverage Status

83) By default, coverage is available only for the following requirement types: ......

A) Functional, Testing, and Defined.
B) Functional, Testing, and Undefined.
C) Functional, System, and Undefined.
D) Functional, Review, and Undefined.

84) You can create design steps for ......

A) manual andB) automated testsC) SRSD) Both A and B

85) To increase the flexibility and power of a test, you can add ...... to the called test and to the tests that call it.

A) Input ValuesB) Output ValuesC) ParametersD) None of above

86) You do not need to set a test as a template test to be able to call it or to add parameters. Marking a test as a template test is used for filtering purposes only.

A) True,B) False

87) If you do not assign values to parameters when creating a test call, you are prompted to do so when you call this test from another test, when you add your test to a test set, or when you run your test.

A) TrueB) False

88) You can navigate between steps in the Design Step Editor using shortcut keys. Use ...... to access the first step.

A) ALT+LEFTB) ALT+RIGHTC) ALT+HOMED) ALT+ UP

89) While generating automated test scripts, what does WR-AUTOMATED automated test type means.

A) A test that is created by Winrunner
B) A test that is executed by Winrunner
C) A test that is deleted by Winrunner
D) None of above

90) To run a system test, you must install the System Execute Remote Agent Add-in and the HP Quality Center Connectivity Add-in on the machine where the test is to be run.

A) TrueB) False

Answers

91) Using Quality Center Test Lab module, executing tests also consists of ....

A) Run Tests AutomaticallyB) Run Tests Manually
C) Both A and BD) None of above

92) You can access the Test Lab menu bar from the Test Lab module by pressing the shortcut key......

A) F6B) F7C) F8D) F9

93) The Test Lab module includes the following toolbars:

A) Test Set and Select TestsB) Test Select and Set Tests
C) Set Test and Tests SelectD) None of above

94) In the Test Lab Module, in Execution Grid Columns, the column Exec Date means

A) The date on which the test was first executed.
B) The date on which the test was last executed
C) The date on which the test was executed
D) The date on which the test will be executed in future

95) You can add user-defined fields and change the label of any of the fields in the Execution Grid.

A) TrueB) False

96) You can organize test execution by creating ......

A) test modulesB) test flowsC) test bedsD) test sets

97) While creating test sets, after you design tests in the Test Plan module, you create a ......

A) test sets treeB) test sets flowC) test sets gridD) test sets rows

98) By default, the uppermost level in a test sets tree is the ......

A) Level 0 folderB) Top folderC) Highest level folderD) Root folder

99) You can also use the ...... in the Test Instance Properties dialog box (Changing the Default Failure Rules for Specific Tests) to set the on failure rules for a test in a test set.

A) Run Events viewB) Run Events GridC) Run Events menu D) Run Eventsmodule

100) You can also drag the test sets between lists.

A) TrueB) False

Answers