1 To support the Government’s new Water Strategy, Future Water, this

consultation sets out policies to improve the way that surface water drainage is

managed.

2 The floods last summer showed the real damage that surface water flooding

can cause. The Environment Agency estimates that two-thirds of the 57,000

homes affected were flooded from surface water runoff overloading drainage

systems. Combined damage from the June and July floods is estimated to be

around £3 billion.

3 The interim report from the Pitt Review on lessons learned has urged early

action to improve the way that surface water is managed, particularly in high

risk areas. Improving surface water drainage is a key part of the Government’s

new Water Strategy. This consultation takes forward some of therecommendations outlined in the Pitt Review interim report.

4 The Water Strategy puts forward three policy proposals on surface water

management and this accompanying consultation sets out the details.

a. Establishing Surface Water Management Plans as a way of improving

co-ordination of activities between stakeholders involved in surface

water drainage. This part of the consultation addresses the long-recognised

fragmented responsibilities for managing surface water drainage. Surface

Water Management Plans could provide a much-needed co-ordinating

mechanism. We ask stakeholders for their views on whether preparation of

the plans should remain voluntary or become required in high risk areas, and

what roles each of the key stakeholders should play.

b. Clarifying responsibilities for adoption and management of sustainabledrainage systems (SUDS). This part of the consultation asks stakeholdersfor their views on options for encouraging SUDS as a viable alternative toconnecting surface water into sewers. It puts forward specific proposals inrelation to responsibilities, policies and processes to increase uptake ofSUDS.

c. Reviewing automatic right to connect (Section 106 of the Water Industry

Act 1991). This part of the consultation reviews the existing and longstanding

ability for new development to connect surface water drains orsewers to the public sewerage system, which could act as a potential barrierto the use of SUDS. The right to connect foul drains and sewers to the publicsewerage system will remain. Traditional piped drainage has delivered manybenefits and will continue to have a role to play as part of surface waterdrainage. But to prepare for climate change and continuing developmentpressures, we should ensure that a much fuller range of drainage approachesis considered when surface water drainage systems are designed,constructed and improved in the future.

5 The consultation is backed by two Impact Assessments that review the main

costs and benefits of each policy option.

Part 1: Consultation Overview

Introduction

1.1 The floods last summer exemplified the distress and damage that surface water flooding can cause. The Environment Agency estimates that two-thirds of the 57,000 homes affected were flooded from surface water runoff from fields and paved areas going into property or overloading drainage systems, and from

local watercourses, ditches and sewers. Combined damage from the June and

July floods is estimated at around £3 billion.

1.2 Sir Michael Pitt’s interim report of the summer floods has highlighted the risks

from surface water flooding and put forward recommendations to reduce the

chance of such an event occurring again.This consultation forms part of a

wider programme of work to consider the urgent recommendations and interim

conclusions of Sir Michael Pitt’s review.

1.3 The problems will only worsen unless we take steps to manage the risk

effectively. The Government’s Foresight report estimated that currently 80,000

properties have a very high likelihood of flooding from surface water runoff

(10% annual chance), causing on average £270 million of damage each year.

With climate change these costs will increase if we take no action and could

rise to several billion.

1.4 The Government’s new Water Strategy, Future Water, sets out a vision for

more effective drainage of surface water, in order to deal with the dual pressures of climate change and housing development. By the 2030s, we will manage surface water more sustainably, by allowing for the increased capture and reuse of water, slow absorption through the ground, and where appropriate more above-ground storage and routing of surface water separate from the foul

sewer. Moving large volumes of water from one place to another and treating

surface water has energy costs. Water will increasingly be managed on the

surface, rather than relying on wholesale upgrade of the existing sewer system

to higher design standards, which will be a costly and lengthy process.

1.5 Such an approach will reduce flood risk, improve water quality, and lessen the burden on the sewer system, which otherwise will struggle to cope with the

extreme rainfall events that climate change is likely to bring. Water companies

could potentially have to spend around £1 billion per year to stop flooding from

sewers getting worse given increasingly intense rainfall events.Keeping

excess rainwater out of sewers will be a particularly important element of

adaptation because the potential capacity of the landscape to absorb, store and

convey water is much greater than the below-ground system.

1.6 In line with Sir Michael Pitt’s recommendations and those of the Royal

Commission on Environmental Pollution,the new strategy puts forward policy

measures to improve the way that surface water runoff is managed. In

particular, it proposes: (1) using Surface Water Management Plans as a tool to

improve co-ordination between stakeholders involved in drainage and local

management of flood risk; (2) promoting sustainable drainage systems by

clarifying responsibilities for ownership and adoption; and (3) reviewing the

ability for premises to connect surface water drainage automatically into the

public sewer system (Section 106 of Water Industry Act 1991).

1.7 These policy proposals will involve significant changes in the way that surface water is managed. As such, Defra is consulting with stakeholders on details of the proposals. The consultation supports the key principles of integrated water management, including reducing risk, improving water quality and adapting to climate change. As flooding and water management are devolved issues, the consultation covers England only. The Welsh Assembly Government plans toconsult separately on its approach to future surface water management, whichmay include reviewing Section 106 of the Water Industry Act (1991).

1.8 Part 2 of the consultation focuses on the role that Surface WaterManagementPlans might play in enabling a co-ordinated and strategic approach to managingsurface water drainage. Part 3 then considers how arrangements for theadoption and ownership of sustainable drainage systems (SUDS) could be

improved to encourage their use. Finally, Part 4 examines how Section 106 of

the Water Industry Act (1991) could be revised to change the provision for

premises to connect surface water drainage into the public sewer system as

default. All three parts of the consultation are backed by Impact Assessments

that review the main costs and benefits of each policy option (Annexes B and

C).