Transportation of Dewars of Liquid Nitrogen within FMC by lift.
Safe Work MS NUMBER / RISK ASSESSMENT NUMBER / RISK ASSESSMENT
SWMS_15_1 / RA-02 / Liquid Nitrogen
DATE CREATED / Employees Involved in Safe Work MS Creation / CONTACT PERSON
16/11/15
/Angela Binns, Kone Lift mechanics, FMC Environmental Services,
FMC Emergency Officer,
FMC Spotless
/Angela Binns (Faculty Safety and Facilities Unit
Personal Protective Equipment Required- Face Mask
- Cryogenic gloves
- Gown / Labcoat
- Approved dewar on appropriate trolley with suitable wheels
Before work Commences
Transportation of dewars by lift is only available between 10 and 10:30am Monday to Friday.
- The morning that transportation is required researcher “Pages” the Kone Lift Mechanic on a FMC internal phone by calling # 89 38357 *
- Researcher - Collect appropriate PPE
- Researcher - Fill dewar prior to pre-arranged transportation time – leave in 4D-235 until ready to transport
- Lift Mechanic - Collect the 2 Hand-held-radios from the FMC Security desk (next to Exit door to Emergency Department ambulance parking area) Security Xtn: 64569
Safe Procedures
This Safe Procedure must be followed for the Safe Transportation of Liquid Nitrogen Dewars within FMC via lift on a suitable trolley
Transportation is only available between 10 and 10:30am Monday to Friday and must be done in conjunction with the Kone Lift mechanic.
*If at any time a spill occurs within the lift, the Lift Mechanic is to “Park” the lift on level 2
- At the pre-arranged time (some-time between 10 & 10:30 am)
- Researcher
Tests hand-held-radios with Lift Mechanic
Confirms the lift floor level that the lift will be moved to.
- Lift Mechanic
Walks to lift control room
- Researcher
Brings dewar back to level 4 D-Block “fish” lift
Radios lift mechanic to inform him that the dewar is at level 4 ready for collection.
- Lift Mechanic
- Researcher
Secures dewar – (appropriately for its size and type)
Moves out of lift
Radios Lift Mechanic to inform him that the dewar is safely in lift
Waits until doors are closed
Walks up stairs to the lift designated floor level
- Lift Mechanic operates lift from the control panel to:
Moves lift to the lift designated floor level
- Researcher – When at the designated floor level
- Lift Mechanic
If notified by researcher that a spill has occurred within the lift, the lift mechanic is to “Park” the lift on level 2
- Researcher - Once the doors open and the researcher can see that the dewar inside is standing upright and safe:
Radios the lift mechanic to inform him that the dewar has been safely removed.
- Lift Mechanic
Returns lift operation to “normal”
Walks to designated floor level to meet researcher
- Researcher
Gives the hand-held-radio back from to the Lift Mechanic
Takes dewar to lab / storage area
- Lift Mechanic