ExMC/394/Inf
August 2007
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC) SCHEME FOR CERTIFICATION TO STANDARDS RELATING TO EQUIPMENT FOR USE IN EXPLOSIVE ATMOSPHERES (IECEx SCHEME)
Title: Report of IECEx ExCB/ExTL assessments and re-assessments
Circulated to: ExMC – IECEx Management Committee
INTRODUCTION
This document contains a list of assessments and re-assessments which the ExMC have approved, via correspondence, since the ExMC 2006 the Shanghai Meeting.
· Table 1 Applicant ExCB and ExTLs completed and approved via correspondence, since Shanghai 2006
· Table 2 Re-assessments of previously accepted ExCBs and ExTLs,
completed and approved via correspondence, since Shanghai 2006
· Table 3 Re-assessments carried out but not yet completed
· Table 4 Re-assessments planned for the remainder of 2007
This document is for noting.
Chris Agius
IECEx Secretariat
Address:SAI Global Building
Level 7
286 Sussex Street
Sydney NSW 2000
Australia / Contact Details:
Tel: +61 2 8206 6940
Fax: +61 2 8206 6272
e-mail:
http://www.iecex.com
Table 1
IECEx Series of Meetings
*Documents for Noting / Organisation and Report Title / Approved
ExMC/333A/DV
ExMC/347/RV / TÜV Rheinland Industrie Service GmbH as an Ex Certification Body (ExCB) / üExMC/334A/DV
ExMC/348/RV / TÜV Rheinland Industrie Service GmbH as an Ex Testing Laboratory (ExTL) / üExMC/340A/DV
ExMC/349/RV / TÜV SÜD Product Service GmbH as an Ex Certification Body (ExCB) / üExMC/341A/DV
ExMC/350/RV / TÜV SÜD Automotive GmbH as an Ex Testing Laboratory (ExTL) / üExMC/354/DV
ExMC/363/RV / TÜV SÜD Product Service GmbH, Filderstadt, as an IECEx Test Laboratory (ExTL) within the IECEx Scheme / üExMC/355/DV
ExMC/367/RV / IECEx Assessment Report for the acceptance of QPS Evaluation Services Inc. as an ExCB within the IECEx Scheme / üExMC/356/DV
ExMC/368/RV / IECEx Assessment Report for the acceptance of QPS Evaluation Services Inc. as an ExTL within the IECEx Scheme / üExMC/364/DV
ExMC/377/RV / IECEx Assessment Report for the acceptance of FM Approvals Ltd (GB) as an ExCB within the IECEx Scheme / üExMC/369/DV
ExMC/387/RV / IECEx Assessment Report for the acceptance of IBExU Institut für Sicherheitstechnik Gmb as an ExCB within the IECEx Scheme / üExMC/370/DV
ExMC/388/RV / IECEx Assessment Report for the acceptance of IBExU Institut für Sicherheitstechnik Gmb as an ExTL within the IECEx Scheme / ü* DV = Voting document
* RV = Report of voting
Table 2
Re-assessments completed and approved via correspondence since the Shanghai 2006 IECEx Series of MeetingsDocument for Noting / Organisation and Report Title / Approved
ExMC/365/DV
ExMC/385/RV / Re-Assessment Report for the continued acceptance of TÜV Nord as an Accepted ExCB in the IECEx Scheme and an extension of scope / üExMC/366/DV
ExMC/386/RV / Re-Assessment Report for the continued acceptance of TÜV Nord as an Accepted ExTL in the IECEx Scheme and an extension of scope / üExMC/372/DV
ExMC/…/RV / Re-Assessment Report for the continued acceptance of NEMKO AS as an Accepted ExCB in the IECEx Scheme and for voting on an extension of scope / üExMC/373/DV
ExMC/…/RV / Re-Assessment Report for the continued acceptance of NEMKO AS as an Accepted ExTL in the IECEx Scheme and for voting on an extension of scope / ü* DV = Voting document
* RV = Report of voting
Table 3
2007 Re-assessments carried out but not yet finalisedINTERTEK ITS / Site assessment completed
SIQ / Site assessment completed
UL/DEMKO / Site assessment completed
Table 4
Re assessments planned for the remainder of 2007 includeCSA (CA) / Re-assessment and Extension of scope
Planned September 2007
KGS (KR) / Re-assessment
LCIE (FR) / Re-assessment
UL (USA) / Re-assessments
Planned September 2007
Page 1of 3