Bergen Park Church Revised Drawings
Changes to the drawings
December 5, 2013
1. Delete the dishwasher hood at the kitchen - mechanical
2. Revised detail of the false beams – carpentry
3. Due to the revised detail of the false beams will new sprinklers at that location be required – fire sprinkler
4. Revisions to the color of storefront and the glazing – glazing
5. Verify quantity of new trees - landscaper
6. Reduce the river rock area of the landscaping – landscaper
7. Reduce the ice and water shield to areas required by code only in lieu of the entire roof – roofer
8. Plumbing fixtures were changed for cost savings – plumber
9. Electrical fixtures were changed for cost savings – electrical
10. Simplify and reduce the exterior trim package – carpenter
11. Modular dry stack retaining wall system around the mechanical equipment – earthwork, concrete , masonry, stucco
12. Changed the grading on the Southwest corner of the building – earthwork, concrete
13. Changed the foundations on the Southwest corner of the building – concrete
14. Change 60 lf of RCP pipe in the detention areas to HDME or CMP – earthwork, site utilities
15. ADDED an IT room, including conduit entry to the building, moving the electrical panels A & B over to this room from the janitor closet – ALL trades
16. ADDED 5 access points for WIFI – electrical
17. ADDED a phone data box in the work room – electrical
18. ADDED A/V lighting requirements – electrical
19. ADD a door ( 3’ x 8’ ) in classroom 120 to accommodate possible storage in that room – door/frame/hardware
20. Relocate location of gas meter – plumber
21. Change the fascia/eaves details and make them integral with the trusses - trusses, carpentry
22. Eliminate the dormers from the roof – carpenter, glazing, roofer
23. Change the masonry on the trash enclosure – mason, stucco
24. Change all of the exterior doors that are not integral with the storefront system to hollow metal doors and frames – door/frames/hardware, paint and storefront sub
25. The exterior band around the building will change to a foam detail with stucco – carpenter, stucco
26. Delete the light coves in the restrooms – drywaller and electrical
27. Delete the interior window in office 127 – storefront, drywaller, paint