ONYEBUCHI LUCKY NKEKI

SCAFFOLDING SUPERVISOR/INSPECTOR

Email: ,

Contact#: +2348061588507, +2347031211981, +2348075082870

Career Objectives and Personal Overview:

To obtain a challenging position with an organization that will utilize my skill and knowledge, for the benefit of the company and also provide room for personal advancement and training. Posses well developed inter personal skills with ability of working independentlyand also work as part of a team. I am a target oriented person with vast experience in Oil and Gas Construction Projects, I have 14 years experience in the safe Erection, Dismantling and Modifications of all Scaffolds in accordance with BS 5973 and Inspection of scaffold and fall protection systems, documentation of scaffolds in Form F91, Training of scaffolders and preparing of Training Programmes. I am also proficient in the preparing of Job Hazard Analysis (JHA’s), Risk assessment and Method Statement for different types of scaffold.

I am fluent in the English Language in both speaking and writing and I am experienced in working alongside a Multi National Workforce

Current Educational Qualifications & Training:

National Diploma (ND) Mechanical Engineering Undergraduate FIDEI POLY TECHNIC, Benue State Nigeria 2010

National General Certificate in Occupational Safety and Health, (NEBOSH)United Kingdom 2009

Basic Life Support and First Aid Training, State of Qatar 2009

Construction Safety and Disaster site Management (OSHA) University of California Dominguez Hills USA 2008

Scaffolding Inspector Training, State of Qatar

Fire Fighting training, State of Qatar 2008

Advance Scaffolding Training by CITB Register Scaffolding Instructor Nigeria 2008

HSE Level II Training (SPDC), Nigeria 2007

Scaffolding Train the Trainer on Erection, Modification, Dismantling, Inspection and Documentation. Nigeria 2006

Owa secondary school Owa Oyibu Ika North East Local Government Area Delta State Nigeria (WAEC) 1988

Obisi primary school Owa Oyibu Ika North East Local Government Area Delta State Nigeria (FSLC) 1983

On Site training

Job Safety Analysis Training

Permit to work training

Working at height training

Hazard Communication (HAZCOM)Training Qatar chemical plant

T.S.K.J (NLNG) Basic Scaffolding Training

T.S.K.J (NLNG) Basic Rigging Training

T.S.K.J (NLNG) Confined Space Entry Training

T.S.K.J. (NLNG) Scaffolding Inspection Training Course

T.S.K.J (NLNG) Leadership Awareness Course

T.S.K.J (NLNG) Craft Scaffolding Inspection Training

ACHIEVEMENT

Daewoo Gold Award (Employee of the month) March 2010

Daewoo Merit Award (Safety Champion of the month) March 2008

SPDC Certificate of Recognition of 3 million LTI free man hours October 2007

TSKJ Safety Crew of the week July 2005

Daewoo Merit Award (Excellent worker of the month) March 2004

NLNG Shout-Down Participation (Certificate of Recognition) Jan. 2003

NLNG TSKJ Certificate of Appreciation of 5 million LTI free man hours May 2001

Career Accomplishments

Detail of Work Experience (14 years experience in Oil & Gas, Petrochemical, Power Plant, Refinery and Civil Marine Construction Projects)

Work Experience:

TECHINT CIMIMONTUBI NIGERIA LIMITED

Escravos Gas to Liquid (EGTL) Project

Chevron Nigeria Limited

Ecravos Nigeria

September 2010

Position: Supervisor Scaffolding

GENERAL ACCOUNTABILITY

Reporting to the Scaffolding Manager, as the scaffolding supervisor it’s my responsibilities for the daily scaffolding works and to effect the day to day production of scaffolding on the site

NATURE AND SCOPE OF MY JOB

Monitoring/Supervising/Coordinating/Interfacing the production of scaffolding duties to improve production and ensure effective use of scaffold materials and manpower

SPECIFIC ACCOUNTABILITIES

To monitor/supervise the scaffold activities to improve productivity at site

To interface with the construction management and the construction sub contractors to clearly understand the area’s scaffolding are needed

To ensure the scaffold requisition system and handover is disciplined, strictly adhered to and maintained

To monitor/supervise the Scaffolding subcontractor to ensure all man-hours are correct and to monitor/supervise the activities according to the construction area’s priorities

To monitor/expedite availability of Scaffolders at site

To monitor and manage the scaffolding HSE responsibility at site and to attend morning tool box talks

To monitor/verify the weekly and monthly scaffolding and construction progress measurement

To maximize the effectiveness of the system type scaffolding purchased, and ensure the scaffold sub contractor and construction areas allocate the most appropriate type of scaffolding to the job

RELATIONSHIPS AS SCAFFOLDING SUPERVISOR

Own the relationship with the Construction Areas General Superintendents and the sub-contractors

Relationship with other Construction Area team members, including engineering, Quality inspection, planning, material control, HSE and etc

Relationship with Equipment vendor supervision team including the refractory sub contractors

Relationship with other contractor such as transportation, Load-out, Logistics

Own the relationship between the scaffold sub contractor supervisors in the areas

DIMENSIONS

Inspection in advanced Scaffolding

Experience in construction supervision and living in camp conditions

Experience with all HSE responsibilities in the scaffolding discipline

Experience with system all type of scaffolding

Ensuring that before the commencing of any task, that all hazard in line with the task are identify and that measures are put in place to control them before causing harm to the workforce through job safety analysis and tool box talk (JSA & TBT).

Ensure scaffold erection is in accordance with the international scaffold standard (CITB)

Ensure the rule of working at height govern all scaffolders while on site

DAEWOO ENGINEERING AND CONSTRUCTION

Nakilat Ship Repair Yard (Dry Dock) Project

Ras Laffan Industrial City

State of Qatar

June 2009 till June 2010

Position: Senior Scaffolding Supervisor/Inspector

Job Profile

Coordinating all Scaffolding activities with sub-contractors and direct employed workers

Coordinate scaffold issue with Client and my company by attending weekly progress meeting.

Report all issues regarding Scaffold to the HSE Manager and construction team

Monitoring all work crew to ensure all safety procedure is observed

Conducting weekly site inspection with the area foremen to ensure the observed mistakes are corrected

Preparing of Permit to Work(PTW) for all scaffold activities

Prepare Job Hazard Analysis(JHA) for all Scaffolding activities

Prepare Risk Assessments for critical jobs

Conduct weekly safety meetings with special topics

Training newly employed scaffolders the safe procedure of erection, dismantling, and modifying scaffold in accordance with CITB Standard and Project requirement

Providing fall protection and access at height

Identify the inherent hazard and mitigate measures towards the eliminating of the hazards and the safe way when the hazard can’t be totally eliminate

Inspection of all personal fall protective equipment for defects and other materials for working at height

Inspection of scaffold and Documentation of inspection result in F91 form

Preparing of scaffold record for audit

TECNIMONT-DAEWOO COMPANY (TCM- DW CONSORTIUM)

Qchem II Petrochemical Complex,

Mesaieed Industrial City

State of Qatar

April 2008-May 2009

POSITION: Scaffolding Supervisor/Inspector

Conduct Daily Site Supervision in working alongside one (1) British Expatriate CITB Registered Advanced Scaffolder.

Prepare Job Hazard Analysis(JHA) for all Scaffolding activities.

Prepare Risk Assessments for critical jobs or jobs in critical locations in order to reduce the risks and hazards.

Prepare Method Statements for critical jobs or jobs in critical locations in order to maintain a Safe System of Work.

Conduct weekly Safety, Health and Environmental meetings with special topics

Train all new Scaffolders the methodology in the correct erection, dismantling, and modifications of scaffolds to meet International Standard and Project required

Erection of different types of scaffolds, Independent,Towers, B/Cage, Suspended, Cant., Shelters using Conventional Tube & Fitting and different forms of System Scaffold

To determine the feasibility and safety of providing fall protection and access

To inspect scaffolds and scaffold components for visible defects before each shift and after any occurrence which could affect the structural integrity and to authorize prompt corrective actions.

Making sure Scaffolders hold Tool Box Talks (TBT’s) prior to job commencement to identify hazards inherent to the job task and mitigate measures towards eliminating hazards before the job commencement.

Inspection of full body safety harness for defects before usage

Inspection and tagging of scaffolds

Preparing of scaffolds inspection records (F91).

Prepare daily work permits for confine space entry, commissioning entry and live plant operations.

DAEWOO NIG. LIMITED,

DN-52 Project,

Afam 6 CCGT Power Project (SPDC) R/S

Nigeria.

August 2006 - April 2008

POSITION: Scaffolding Supervisor / Changing hand Inspector

Conducting Daily Site Supervision, Alongside three (3) British Expatriate (CITB Registered Advanced Scaffolding)

Prepare Job Hazard Analysis(JHA) for all Scaffolding activities.

Prepare Risk Assessments for critical jobs or jobs in critical locations in order to reduce risks and hazards.

Conduct weekly Safety, Health and Environmental meetings with special topics.

Train all new Scaffolders the correct methodology erection, dismantling, and modifications of scaffolds.

Erection of different types of scaffolds, Independent, Towers, B/Cage, Suspended, Cantilever, Shelters using Conventional Tube & Fitting and different forms of System Scaffold

To determine the feasibility and safety of providing fall protection and access

To inspect scaffolds and scaffold components for visible defects before each shift and after any occurrence which could affect the structural integrity and to authorize prompt corrective actions.

Making sure Scaffolders hold Tool Box Talks (TBT’s) prior to job commencement to identify hazards inherent to the job task and mitigate measures towards eliminating hazards before the job commencement.

Inspection of full body safety harness for defects before usage

Inspection and tagging of scaffolds

Preparing of scaffolds inspection records (F91).

Prepare daily work permits for confine space entry, commissioning entry and live plant operations.

DAEWOO ENGINEERING AND CONSTRUCTION NIG LIMITED

DN-25, 34, 45 & 48 NLNG PROJECT

TRAIN 1-6

BONNY

NIGERIA

SEPTEMBER 1999 TILL AUGUST 2006

SCAFFOLDING AREA FOREMAN/INSPECTOR

DELALTRE BEZONS NIG LIMITED (DBN)

NLNG BASE PROJECT

BONNY ISLAND

NIGERIA

October 1996- June 1999

POSITION: Erector (Scaffolder)

Passport Details:

Passport No: A00064742

Place of Issue: Owerri Nigeria

Personal Details:

Address: # 5 Nusuma Street Idumusuma quarters, Owa Oyibu.

Ika North East Local Govt. Area, Delta State, Nigeria

Date of birth : 7th May 1972

SEX : Male

Nationality : Nigerian

Language Known : English

Marital status : Married

Religion : Christianity

REFEREES:

Mr. Paul Jackson

EGTL HSE Advisor/ Scaffolding Superintendent

AUS/Utilities

Escravos Gas to Liquid Project Chevron Nigeria

Mr. Mark S Fitzgerald

Daewoo Nigeria Afam [DN52]

1