2012 -Till 2015 Driller With Kcadeutag Drilling GMBH ((North Iraq))

Drilling exploration wells and conducting Drill stem test protect the soul worker by safely Motivating the work meeting participating and encourge crew to participate in SET CARD AND TRIC CARD and time out for safety

Maintains an accurate drill log

Responsible for the safe operation and productivity of the drilling rig

Responsible for operating the drilling and hoisting equipment on the rig floor

Managing the rig floor and driller's console, brakes, monitors and throttles for the drilling equipment. Measurements, reading and other feedback from the drilling console

Responsible for ensuring that all new and existing rig personnel are aware of the required safety measures on the rig

Conduct Regular safety drills, such as blow out prevention Drills, Kick Drills, H2s Drills and choke Drills

Participates in pre-tour and tool-box meetings with the drilling crew.

Complies fully with all QHSE requirements and policies, and communicates safe working practices on the drill floor at all times.

Fills up and records daily QHSE inspection reports.

Leads by visible example, minimizing delegation of authority when handling key operations.

Keeps drill floor, tools and equipment clean and in good working order, and reports any problems or deviations.

Knows well control procedures, and blowout preventer equipment and procedures.

Recognizes basic warning signs of kick and acts to prevent any incidents.

Oversees and performs maintenance of the derrick and drilling fluid system equipment.

Maintains equipment files, drilling logs and records.

Directs, assists, and performs technical calculations to carry out drilling operations.

Interprets and responds to down hole conditions.

Reads and interprets gauges, meters and instruments.

Plans work for the drill crew and provides leadership and motivation.

Advises supervisor of all current or changing conditions, and instructions from the operator.

Trains and evaluates the drilling crew and acts as a mentor.

Sets the crews’ yearly objectives and follows up progress via quarterly reviews.

Wears required personal protective equipment (PPE) at all times.

Speed Rig Specifications

• Mast height 44 m

• Substructure height min. 8,50 m

• Drill floor size 9 x 9 m

• Mast capacity 350 mt

• Traveling block 350 mt

• Setback capacity 200 mt

• Rotary table 27.5 in

• Top Drive Bentec TD-500-HT

• Mud tanks 160 m³

• Water tank 80 m³

• Mud pumps 2 x Bentec T-1600-AC

• Drawworks Bentec E-2000-AC

• Drilline 1 3/8 in

• ACS incl.

• STRS incl.

• Driller cabin c/w infodrill incl.

• Iron roughneck NOV ST-80 / Hawkjaw

• VFD container incl.

• Engines 3 x CAT 3512 B or eq.

• Generators 3 x Kato 1365 kW o.e.

• Mud treatment equip. Brandt/SWACO

• Choke manifold 4 in. x 10.000 psi

• Closing unit incl.

VFD Container

• Bentec VFD - AC Power System for

1500 HP Land rigs

2010 –2012 Driller With Nabors Drilling International Limited (South Iraq)

Make sure that drilling operations follow established plan

Keep a good coordination of services and communication with the Client Representative personnel as well as the Company representatives

Training and supervising the Assistant Driller, Derrickhand, Floorhands, Pumphands, Shakerhands and any Roustabouts who work with rig crew

Ensuring the work in and around the drill floor and BOP occurs in a safe and effective manner

Maintain the safety of the drill crew and support personnel working in and about the drill floor

Supervise and control the proper rig up and rig down of any rig equipment or other company services equipment

Maintain continual preventative maintenance and repair of the equipment used in the drilling operations along with ensuring continual cleaning and housekeeping in and about the drill floor

Super Rig Type and equipments I working on:

Rig control & operating system :joystick VFD-AC Drawworks Motor & touch screen

BOMCO, ZJ50/3150D14

Mast Height: Clear height -157 Ft

Crown Block: BOMCO YC315, 700,000 Lb, Drill line size 1-3/8”

Rotary Table: BOMCO ZP375, 37 ½”

Draw works: BOMCO JC50D, 2000 HP, 1 3/8” Grooved drum, Max 76,000 Lb Fast-line Pull, 487,000 Lb Max Capacity

Top Drive : CANRIG 1050E , RATING: 500 TONS

Mud Pump: BOMCO, Model F-1300, 1300 HP, Belt-driven, Dual 752 Traction Motors

Power Package: Caterpillar 3512B, SR4 Generators x 3 BOMCO/Ross Hill SCR

Standby AC Generator – Caterpillar 3408

BOP Equipment: Shanghai Petroleum, FH35-35, 13 5/8 - 5M

Shanghai Petroleum, 2FZ35-70 Double – 13 5/8, 10M

Shanghai Petroleum, FZ35-70 Single – 13 5/8, 10M

Jinhu Petroleum Choke Manifold, 3” 10M

Beijing Petroleum FKQ720-6 Accumulator, 6 Stations

2007 – 2010 Driller with Dalma Drilling Energy LLC ( Oman )

Job Responsibilities: Responsible for the operation of the drill floor including drawworks, mud circulating systems rotary system and BOP equipmnt and supervision of the drilling crew

B) Rig Equipment

1. Drawworks : Oilwell E2000 (2000 HP) w/ Baylor Eddy Current Auxiliary Brake

2. Derrick : Derrick Cantilever, 28’ x 19’ x 152 ft.

3. Hook Load : 1,125,000 lbs with 12 lines.

4. Top Drive : Varco TDS 11S – 500 Ton

5. Rotary Table : Oilwell B37.5 (37 ½”) – 500 Ton

6. Blocks : Dreco Flat 760C crown - 583 Ton, Oilwell B500, traveling – 500 Ton

7. Swivel : Oilwell P.C500 – 500 Tons

8. Sub-Structure : Derrick, Self Elevating, set back 500,000 lbs.

C) Rig Power

1. Engine Power : 4 x Caterpillar D399, 1200 HP ea. with 1050 KVA generators

2. Drawworks : 2 x GE 752 motor – 1000 HP ea.

3. Mud pumps : 4 x GE 752 motor – 850 HP ea.

4. Rotary : Ind. Dr, GE 752 motor – 1000 HP, Torque 800 Amps / 43,200 ft-lbs.

5. Top Drive : 2 x 350 AC Motor – 400 HP ea, Torque 700 Amps / 32,500 ft-lbs.

D) Mud System & Pump

1. Mud Pumps : 2 x Oilwell A-1700PT (1700 HP)

2. Mud pits & storage : 2000 bbl. active with 1000 bbl. reserve

3. Shale Shakers : 2 x Derrick-Flo Line Cleaners

4. Desander : Harrisburg 3 x 10” cone – 1600 GPM.

5. Desilter : National Oilwell, DSL-1600-5c – 1600 GPM.

6. Degasser : Swaco 255 – 1200 GPM

E) BOP Equipment

1. Accumulator : 3000 psi, Koomey ABB TX-280, 14 station 20 x 15 gal bottles

2. Choke manifold : Swaco 3 1/8”, 5000 psi WP, H2S trim

3. BOPs : Hydril MSP 21 ¼” Annular 3000 psi, Hydril GK 13 5/8” Annular

5000 psi, Cameron U 13 5/8” double ram 5000 psi, Cameron U

13 5/8” single ram 5000 psi

F) Depth Capacity : 10,000 ft with 5” Drillpipe

2004 – 2007 Assistant Driller with Egyptain Drilling Company (Syria)

Performing proper rig up and down and proper nipple up and down procedures

Assisting Driller in supervision and coordination of the activities of the drill crew

Providing relief for the driller, derrick hand and floor hands as necessary

Ensuring the proper care and maintenance of the equipment used on the drill floor as well as the drill floor structure

2002 – 2004 Derrickman with Egyptian Drilling Company (Syria)

Working in the derrick to safely and efficiently assist the Driller in centering, raising and lowering all casing, drill pipe and tubulars through the drill floor rotary table

Ensuring the smooth operation and support function of

the mud module including preventative maintenance and general repairs of mud equipment as requested by the Driller and Mud Engineer

Keep chemicals and mud mixture meets the needs of drilling operations

Directing and supervising the Floor hand or Roustabout assigned to the sack room

Performing general maintenance and upkeep of the equipment in the chemical, mud and pump rooms

Assisting the Driller and Floor hands on the drill

floor when requested

2000 – 2002 Rousabout & Floorman with Egyptian Drilling Company (Syria).

Safely and efficiently performing all manual labor tasks on the drilling floor and B.O.P. area under the direction and supervision of the Driller

Operating the tongs, slips and spinner hawk to connect and dis-connect drill pipe, tubulars, casing and drill bits or tools

Performing all maintenance of the equipment and physical space of the drill floor; rig up and down procedures, nipple up and down and care of the B.O.P. system; monitoring and operation of the shakers

Assisting the Derrick hand within the mud pit, mud pump and chemical sack rooms

Performing housekeeping activities on the drill floor including

washing, chipping and painting; providing relief for the Derrick hand

Assisting the Crane Operator with the rigging of equipment, supplies, tubulars, pipe and casing that needs to be moved or relocated throughout the rig

TECHNICAL &OPERATIONS:

Drill conductor hole, surface hole, and main hole.

Trip the drill string.

Run and cement the casing string.

Install diverter systems and function test.

Perform additional drilling related operations such as drilling deviated hole, working stuck pipe coring fishing for lost drill string and assisting in testing of the well.

Direct and assist in other operations required to conduct drilling operations.

Use good well control procedures as outlined in the well control manual.

Oversee the periodic inspection & lubrication of washpipe and the draw works rotary and swivel.

Oversee the maintenance of the derrick and associated equipment.

Oversee the operation & service of the standpipe manifold.

Oversee the operation & service of the drilling fluid system equipment.

Maintain equipment files, drilling logs and records.

Perform all technical calculations, required to carry out drilling operations.

Interpret and respond to down whole condition.

Demonstrate knowledge of well control procedures.

Locate information and data required to conduct operations.

Read and interpret virus’s types of gauges meter instruments.

Demonstrate knowledge of blowout preventer equipment procedures including assisting in the testing of equipment.

Work Over Experience

Milling different type of packers

Running and changing ESP Pump and electrical cable

Runnign all fishing tools types overshot ,realsing spear ,reverse circulating junk basket,Taper tap .all casing scrapper sizes and brushes with magnets .Washover pipes

Traing Courses

IWCF Level 4 valid till 2019

Rigging and slinging.

Drilling string Practice

Basic drilling technology & practice

Rig Mathematics

ICDL(international Computer Driving license)

Stuck Pipe

PTW(permit to work)

H2S Awareness & breathing apparatus

Safety management

O.B.M awareness

NORM awareness

Personal survive techniques and search and rescue

Rig floor safety & emergency response

Leadership workshop

Education

Bachelor Degree In Educational Planning And Management

University Of Aleppo

Page 1 of 6