/ Air Operator Certification Manual / SLCAP 4100
Certification Check Lists / Appendix D / Page: 1

CL -15

Certification of Applicants for

Air Services Operations in Sri Lanka

CHECKLIST – 15 – INSPECTION OF OPERATIONS PORTS

Name of the Applicant: …………………………………………………………………

Name of the Operating Port:……………………………………………………………

[When an item is marked to be unsatisfactory, indicate reasons under the Remarks column in detail]

Item

/

Status

/

Remarks

Sat

/

Unsat

A. /

Company Documentations

1. / Specific regulated take-off & landing charts
2. / Special obstacle avoidance procedures
3. / Route qualification briefing
4. / Accuracy of Operations Manual information
5. / Reference Library (where crew are based)
B. / Aerodromes
1. /

Type (Licensed/Military)

2. / Lighting activation
3. /

Electric Lighting

4. / Electrical Lighting
a. /

Runway

b. / Taxiway
c. / Apron
d. / Wind indicator

Checklist – 15

Page 1 of 4

Rev 00 / Civil Aviation Authority of Sri Lanka / Date 01.12.2005
/ Air Operator Certification Manual / SLCAP 4100
Certification Check Lists / Appendix D / Page: 1
e. / Obstacle lighting

Checklist – 15

Page 1 of 4

Rev 00 / Civil Aviation Authority of Sri Lanka / Date 01.12.2005
/ Air Operator Certification Manual / SLCAP 4100
Certification Check Lists / Appendix D / Page: 1
5. / Electronic or visual slope guidance
6. / Navigation aid and instrument procedures
7. / Approved QNH source

Checklist – 15

Page 2 of 4

Rev 00 / Civil Aviation Authority of Sri Lanka / Date 01.12.2005
/ Air Operator Certification Manual / SLCAP 4100
Certification Check Lists / Appendix D / Page: 1
8. / Approved Met observers
9. / Adequate data on obstacle gradients, movement areas, hazards etc
10. / Runway inspections and bird scaring
11. / Movement areas suitable
12. / Suitability for type of aircraft operated
13. / Movement Area
a. / Runway
b. / Taxiway
c. / Apron
d. / Pavement Strength
14. / Runway width
15. / Runways strip
C. / Airspace
1. / Controlled Airspace
2. / Terminal Control Area
3. / Obstacle Limiting Areas/Surfaces
D. / Dispatch
1. / NOTAM and Weather
2. / Flight notification

Checklist – 15

Page 3 of 5

Rev 00 / Civil Aviation Authority of Sri Lanka / Date 01.12.2005
/ Air Operator Certification Manual / SLCAP 4100
Certification Check Lists / Appendix D / Page: 1
3. / Communications
4. / Operational Documents
5. / Suitable “work area”
6. / Crew rest
E. / Local Load Control Systems
1. / Pax handling

Checklist – 15

Page 3 of 4

Rev 00 / Civil Aviation Authority of Sri Lanka / Date 01.12.2005
/ Air Operator Certification Manual / SLCAP 4100
Certification Check Lists / Appendix D / Page: 1
2. / Freight handling
3. / Load sheet preparation
4. / Trained/approved load controller
5. / Passenger lists
6. / Scales for weighting baggage and cargo at each port or each base
7. / Cargo manifests
F. / Marshalling/Parking
1. / Designated marshallers
2. / Standards signals
G. / Dangerous Goods
1. / Handling, acceptance, cargo examination
2. / Staff trained & properly authorized
H. / Airside
1. / Passenger safety
I. / Refuelling
1. / Refuelling Precautions
2. / Aircraft location
3. / Refuelling equipment mobile
4. / Fire extinguishers
J. / Inspection of Passenger Handling and Public Safety / Use the Checklist - 2

Checklist – 15

Page 4 of 4

Rev 00 / Civil Aviation Authority of Sri Lanka / Date 01.12.2005
/ Air Operator Certification Manual / SLCAP 4100
Certification Check Lists / Appendix D / Page: 1
Remarks:
………………………………………………………. …………………
Name of the Inspector Signature Date

Checklist – 15

Page 4 of 4

Rev 00 / Civil Aviation Authority of Sri Lanka / Date 01.12.2005