/ New Home Agreement Form
Requirements / Initial Design / Final Design / Approved
All Electric Home
≥16 SEER Pump
Roof deck: Open-cell spray foam or Structurally Insulated Panel 30
Window Performance SHGC of ≤.27 U-Factor of ≤.39
Sole plate gasket installed on exterior walls
Walls insulated to a value≥R-14
All Exhaust fans vented to outside of structure
ENERGY STAR appliances
Electric water heater: minimum (EF) rating of ≥ .94
Initial HERS rating: / Final HERS rating: / Date:
**In addition to the above requirements, a pre-sheetrock and final inspection must be completed by a GVEC Member Services Advisor to qualify. **
□ I agree with the aforementioned terms.
Builder Name: / Builder Signature:
Builder Co. Name: / Builder Phone: ( ) -
Member Name: / Member Signature:
New Home Address:
Street
( ) -
Member Phone / City, State Zip
Date: