Dolagobinda mohanty
At- Brahamanabasta, Po-Kakhadi,Dist-Cuttack-754027,Odisha.
Contact: +91-7077272326(M)
+91-8763060318(M)
Email:
Mechanical Engineer (Static & Rotary equipments, structure , piping & ducting) and Project Management Professional with 5 +years experience in power & chemical industries.
OVERVIEW
I am having experience on Project Execution within schedule, material management like timely indent with reconciliation at store, Contractors billing and managing client issue.
Fabrication, assembly and erection of static and rotary equipment & structural steel at PPL site, Paradeep,
Fabrication, Erection & Testing of A/G Piping of about 75000 Inch-metres on process line, fire water, utility lines and Steam tracing line etc.
Fit up inspection & NDT of site fabrication.(structural with built-up/box column, 120 mtr height flue duct chimney, ducting as per approved drawing)
Erection, installation & alignment work of all types of Rotary and Static equipments as per equipment’s G.A drawings & plot plans.
Installation, alignment and mechanical completion work of Centrifugal Compressors and Steam Turbine.
SPECIALMENTION
I have completed the certification of“NDT LEVEL-II” in UT, LPT, RT & MT.
Project Completed
(EOT Crane): Electrical Overhead Travelling (EOT) cranes are simplest type of cranes used in industries for maintenance purposes (mostly). The capacity can go up to 60tons. The Indian standard for the EOT crane is IS3177. Some of the EOT crane manufacturers in India are EDDY cranes, Armsel MHE pvt
RotatingEquipments
Havingexperienceinalignmentofcoupling,shaft,bearing gearbox.Iam familiarwith
Governor,Mixture,Conditioningmonitoring,compressor,blower,BalancingMachines, Mechanical Seals.
PROFESSIONAL EXPERIENCE
Plant / Client / Company Profile / ResponsibilitiesSULPHURIC ACID PLANT / PPL / COROMANDEL ENGINEERING CO.LTD
(From MAY 2013) / As an Execution Engineer Coordination with OPERATION & MAINTANCE department for issuing permits & follows all safety rules on running plant & follows ASME as well as IS code for execution.
1.Completion of 120 mtr height flue duct with all respects
2. Having knowledge of heavy lift up to 200 MT with lifting scheme.
3.Fabrication & Erection of structural steel having quantity 1800MT with 1.5% scrap only & Material handling system like hopper , conveyer etc.
4. Erection of EOT crane having 60MT capacity in TG bld.
5 .Erection & alignment of various centrifugal pumps & vertical submerged pumps in cooling tower.
6. Erection of vessels like start up scrubber, HIP, CIP, super heater & economiser etc.
7. Erection of 23 MW capacity turbine & generator & Siemens make air compressor.
8. Execution of piping work (steam line, air line, fire hydrant & cold water line etc) ,jacketed piping work for molten sulphur etc.
9. Fabrication & erection of HRS tower having 30 mtr height on ZECOR material.
10 Fabrication & erection of DUCTs, miter bend & transition piece etc .
11. Performing of NDT tests
PROJECT:FLOURINE RECOVERY UNIT / PPL / COROMANDEL ENGINEERING CO.LTD
(From APR ,2012) / As an Asst. Engineer mechanical coordinate with our site in charge to complete the project within scheduled time period.
1. Fabrication, assembly and erection of vessels, ducts & structural platforms & staircase, girders etc.
2. Erection & Alignment of all Pumps (Without & with Piping) & heat exchangers etc.
2. Preparation of various Erection schemes & methodology for client approval.
3. UG piping work.
4. Maintain quality documents in correct order & manner.
PROJECT:ROCK SILO EXTENSION / PPL / COROMANDEL ENGINEERING CO.LTD
(From AUG ,2011) / As an Asst. Engineer mechanical coordinate with our site in charge to complete the project within scheduled time period.
1.Fabrication, Erection & Alignment of material handling systems( HOPPER , TRIPPR CONVEYOR, CONVEYOR, SCREQWW CONVEYOR,CHUTES etc)
2. Was handling fit up inspection and raise the protocol of completed job
3. Execution of fire hydrant system piping.
4. Performing of NDT tests
PROJECT: BOTTOLING UNIT / UNITED SPIRITS LTD, GOPALPUR-ON SEA / COROMANDEL ENGINEERING CO.LTD
(From DEC ,2010) / .
As an Asst. Engineer mechanical coordinate with our site in charge to complete the project within scheduled time period.
1. Fabrication & erection of structural steels like truss, platforms lattices, girders & equipment supports as well as pipe supports, pipe rack etc.
2. Fabrication & erection of SS vessels for storage of liquors.
3. Erection of piping works.
4. Erection & alignment of pumps etc.
5. studying isometric drawing as well as preparation of fabrication drawing arrangement of marking & lay outs & preparation of fabrication plans & completion schedule in MS project etc.
6.Estimation of material requirement as well as giving reconciliation to store etc.
ACHIVEMENT
I have executed indepenently the 120 mtr height stack erection work without a single hazard. This is the best achievement for me.
I also carry out the following jobs besides my normal site work.
· Preparing daily progress reports and weekly progress reports.
· Planning and Co-Ordination with Contractors other concerned departments and agencies like Civil, Contracts, Purchase & Cost Control, electrical &instrumentation and operations departments
· Maintain safe working procedure, tool box talk, and weekly safety meeting with workers and Resources management & documentation of progressive report.
· Apply for daily hot / cold, vessel entry, working at heights permits.
COMPUTER SKILLS
Ø Comfortableinworkingoncomputersand havebasicknowledge of PowerPoint,MSExcel, MSWord,E-Mails,letterdrafting.
EDUCATION PROFILE
ØB-TechinMECHANICALEngg.2010fromBCETaffiliatedtoBijuPatnaikUniversityOf
Technology,Odisha.CGPA-7.39
Ø+2 SCIENCE 2006 from G. Sc college,Athgarh affilated to CHSE, Odisha.Percentage:58%
ØHSCE2004fromkakhadi high schoolOdishaaffiliatedtoBoardOfSecondaryEducation,
Odisha.Percentage:80%
ATTITUDE
ØIhaveastrongabilitytoorganize,comprehendandcarryoutinstructionseffectively.
ØAbilitytoworkinafastpacedenvironment.
ØCommunicationSkillsacquiredbygivingpresentationsandinteractingwithpeers.
ØNeckforbuildingrelationships,friendships,sincerity.Iamverypolite,optimistic,
Øanalytical,hardworking,extrovert,energetic,highlymotivated,focused,
Øconfident,passionforexcellence.
PERSONAL INFORMATION
D.O.B : 06/06/1989
MaritalStatus : Un-married
Nationality : Indian
LanguageProficiency : English,HindiandOriya.
Interests : Driving and listening to soft Indian music.
Date:- Signature:-