Dr. M.H. ALI EL-SAIE

CONSULTING ENGINEERS

A.H.A.F 1/16 / CURRICULUM VITAE
NAME: / KHALED HASSEN MOHAMED ABDEL MOTAAL
NATIONALITY / EGYPTIAN
BORN / 1962
LANGUAGE CAPABILITY / ARABIC - ENGLISH
QUALIFICATION / Grade / B.Sc. OF CIVIL ENGINEERING –AlexandriaUNIVERSITY, EGYPT./ Good
DATE OF GRADUATION: / 1985
TOTAL YEARS OF EXPERIENCE: / 27 YEARS
POSITION: / Project Manager
E mail :
Contact : / 00201008063477
CAREER SUMMARY:
MARCH 2009 TILL NOW
2007 TILLFebruary 2009 / DR. M.H.ALI EL-SAIE CONSULTING ENGINEERS, ABU DHABI, U.A.E.
(CEWWE) THE CONSULTING ENGNEERING “WATER & WASTEWATER ENVIRONMENTAL ENGINEERING
DR. HAMDEY IBRAHIM ALY OFFICE.
2006 TILL April 2007 / AL HUDA FOR ENGINEERING WORK (QATAR)
2004 TO 2006 / (MHW) MONTGOMRY WATSON HARZA
2000 TO 2004 / JOINT VENTURE GROUP (CES-SEBA-SANES)
1998 – 2000 / ECONTO
1996 TO 1998 / ALEXANDRIA CONSTRUCTION COMPANY – TALAAT MOSTAFA)
1994 TO 1996 / DELTA AGRO FOR DEVELOPMENT AND CONSTRUCTION
1992 TO 1994 / RAFAAT CONSTRUCTION COMPANY
1986 TO 1992 / GENERAL INSTITUTE FOR DEVELOPING PROJECTS
1985 TO 1986 / MEDHAT EL SHIEKH CONSULTING OFFICE

EXPERIENCE RECORD

FROM AUGUST 2009 UP TO PRESENT

DR.M.H.ALIEL-SAIE CONSULTING ENGINEERS,ABU DHABI,U.A.E

PROJECT NAME: CONSTRUCTION CONTRACT FOR 200 MM CS JABEL HAFEET PIPELINE

POSITION: RESIDENT ENGINEER.

CLIENT: TRANSCO.

PROJECT DESDCRIPTION:

a-CARBON STEEL PIPELINE DN219.1 MM AND 168.3 MM TOTAL LENGTH = 12KM FROM BASE PUMP STATION TO SUMIT RESERVOIR AND PALACE.WITH HIGH PRESSURE VALVE CHAMBER, PRESSURE REDUCING VALVE,NDRC,OPEN CUT CROSSING AND HYDRO PRESSURE TEST BY 207 BAR WITH FLUSHING, DISINFECTION AND COMISSIONING.

b-CATHODEC PROTECTION SYSTEM.

c-REFURBISHMENT OF DE-AETATOR.

DUTIES AND RESPONSIBILITY:

-LEADING TEAMWORK.

-REVISED SHOP DRAWING AND SUBMITTALS.

-FOLLOW UP SCHEDULETIME RESOURCES AND COST CONTROLLING QUALITY AT SITE ACCORDING ADWEA STANDAR AND APPROVED SHOP DRAWING.

-CHECKING UP RFI'S

-REVISED INTERIM STATEMENT (EVALUATION).

-MONITORING SAFETY PLAN.

-REVIEWING DAILY REPORTS, METHODS OF STATEMENT AND AS BUILD DRAWING.

-COORDINATION BETWEEN STICK HOLDERS.

-PREPARING AGENDA FOR WEEKLY MEETING (DISCUSES DELAY WORKS & PROBLEMS AND PROGRESS).

CORRESPONDENCE (IN&OUT)LETTERS, SITE MEMO AND SITE INSTRUCTIONS.PREPARING FOLLOW UP AND PREPARING CORRESPONDENCE
(IN &OUT) LETTERS, SITE MEMO AND SITE INSTRUCTIONS

FROM MARCH 2009 TO AUGUST2009

DR. M.H.ALI EL-SAIE CONSULTING ENGINEERS, ABU DHABI, U.A.E.

PROJECT NAME: URGENT WATER NETWORK WORKS IN MUSSAFAH, KHALIFA B AND SEIH SEDRA.

POSITION: RESIDENT ENGINEER

CLIENT: (AADC) ABU DHABI DISTRIBUTION COMPANY

PROJECT DESCRIPTION:

A-D.I PIPE LINE DN 400 MM LENGTH = 3KM AT KHALIFA “B”

B-G.R.P TANK AND PUMP STATION IN SEIH SEDRA.

Duties and Responsibility:

-LEADING TEAMWORK.

-REVISED SHOP DRAWING AND SUBMITTALS.

-FOLLOW UP SCHEDULETIME RESOURCES AND COST CONTROLLING QUALITY AT SITE ACCORDING ADWEA Stander AND APPROVED SHOP DRAWING.

-CHECKING UP RFI'S

-REVISED INTERIM STATEMENT (EVALUATION).

-MONITORING SAFETY PLAN.

-REVIEWING DAILY REPORTS, METHODS OF STATEMENT AND AS BUILD DRAWING.

-COORDINATION BETWEEN STICK HOLDERS.

-PREPARING AGENDA FOR WEEKLY MEETING (DISCUSES DELAY WORKS & PROBLEMS AND PROGRESS).

CORRESPONDENCE (IN &OUT) LETTERS, SITE MEMO AND SITE INSTRUCTIONS.PREPARING FOLLOW UP AND PREPARING CORRESPONDENCE
(IN &OUT) LETTERS, SITE MEMO AND SITE INSTRUCTIONS.

From April 2007 to February 2009:

Project Name:AGMY SEWER NETWORK (WEST ALEXANDRIA)

Position:CONSTRUCTORMANAGER

Employer: (CEWWE) THE CONSULTING ENGINEERS “WATERWASTEWATER ENVIRONMENTAL ENGINEERING. DR. HAMEDY IBRAHIM ALY OFFICE.

Project Description:AGMY SEWER NETWORK(WEST ALEXANDRIA), TOTAL COST ABOUT 540 MILLION LE IT CONSIST OF 300 KM (SEWER NET WORK) BY VC(450:700)MM,UPVC (200:400)MM AND PRESTRESSD CONCRETE (900) MM AND 6.5 KM MAIN COLLECTOR BY USING (ECPC)PIPES BY USING MICROTUNLLING SYSTEM FROM (1200 :1800)MM AND ALSO 34 DEEP MANHOLES , PUMP STATION , FORCE MAIN AND WEIR CHAMBER

Duties & Responsibilities: (SENIOR ENGINEER)

-LEADING TEAMWORK.

-REVISED SHOP DRAWING AND SUBMITTALS.

-FOLLOW UP SCHEDULETIME RESOURCES AND COSTCONTROLLING QUALITY AT SITE ACCORDING EGYPTIAN CODE AND APPROVED SHOP DRAWING.

-CHECKING UP RFI'S

-REVISED INTERIM STATEMENT (EVALUATION).

-MONITORING SAFETY PLAN.

-MATERIALS INSPECTION.

-REVIEWING DAILY REPORTS, METHODS OF STATEMENT AND AS BUILD DRAWING.

-COORDINATION BETWEEN STICKHOLDERS.

-PREPARING AGENDA FOR WEEKLY MEETING (DISCUSES DELAY WORKS & PROBLEMS AND PROGRESS).

-CORRESPONDENCE (IN &OUT) LETTERS, SITE MEMO AND SITE INSTRUCTIONS. PREPARING FOLLOW UP AND PREPARING CORRESPONDENCE
(IN &OUT) LETTERS, SITE MEMO AND SITE INSTRUCTIONS.

FROM FEB 2006 TO APRIL 2007

Project Name:WEST BAY TOWER ZONES (ROADS &INFRASTRUCTURES IMPROVEMENTS)

Employer: AL HUDA FOR ENGINEERING WORK (QATAR)

Project Description:PROJECTS AT DOHA CITY, THE OWNER ASHGHAL UNDER SUPERVISION OF MAUNSELL/ AECOM, TOTAL COST 200 MILLION QR. THE WORK INCLUDES REPLACEMENT ALL EXISTING WATER NET WORK BY DI (TYTON TYPE)PIPES(100:900)MM LENGTH 12KM ,SEWER NET WORK (300:800) VC PIPES LENGTH 10KM ,STORM WATER NETWORK (300:1200)MM VC, GRP LENGTH 7 KM ANDVC PERFORATED PIPES (250)MM WITH LENGTH 3 KM AND ALSO 900 UNITE PE GULLIES ROAD .3 KM GARDEN IRRIGATION NET WORK (300)MM HDPE PIPES AND ALSO 1.2KM MICROTUNLLING SEWER BY ADVANCED CONCRETE PIPES (1000:1400) MM ,

Duties & Responsibilities:(CONSTRUCTER MANGER)

-LEAD AND FOLLOW UP MANPOWER STUFF.

-SUBMITTED SHOP DRAWING AND SUBMITTALS.

-PREPARING AND SUBMIT SCHEDULE (TIME, RESOURCES AND COST).

-PREPARING REQUIRED MATERIAL LIST, LABORS, SUBCONTRACTORS AND EQUIPMENTS.

-PREPARING AND SUBMIT DAILY REPORT, ORGANIZATION CHART AND METHODS OF STATEMENT.

-EXECUTING GATE VALVE (SLUICE OR BUTTERFLY) CHAMBERS, AIR VALVE AND WASH OUT CHAMBER AND ALL.

-REQUIRED FITTING, THRUST BLOCKS.

-PREPARING AND EXECUTING HYDROSTATIC PRESSURE TESTS, AIR PRESSURE TESTS, HYDRAULICSWAPPING, DISINFECTION, AND ALSO COMMISSIONING ACCORDING QCS AND KAHRMA SPECS.

-EXECUTING MAIN COLLECTORFOR SEWER AND ROAD CROSSING BY USING MICROTUNLLINGSYSTEM (HERRENKENCHT).

-CONSTRUCTING SHEET PILES FOR JACKING SHAFT, RECEIVING SHAFT AND ALSO RC MANHOLES WITH GRP LINING.

-CONSTRUCTING DEWATERING SYSTEM (DEEP WELLS)

-PREPARING AND SUBMIT RFI'S.

-PREPARING INTERIMSTATEMENT (EVALUATION).ALSO INVOICES FOR SUBCONTRACTOR AND VENDORS.

-MONITORING REQUIRED SAFETY PLAN.

-PREPARINGAS BUILD DRAWING.

-DEALING WITH CLIENT AND CONSULTANT.

-ATTENDING WEEKLY.

FROM 2004 TO FEB 2006

Project Name: ALEXANDRIA HIGH PRIORITY PROJECT (REHABILITATION WATER NET WORK).

POSITION:QUALITY ASSURANCE ENGINEER

Employer:MWH MONTGOMRY WATSON HARZA

Project Description: THIS PROJECTIS A GRANT FROM UASID BY $ 60MILLION.THE WORK INCLUDES REPLACEMENT OF 68 KM DISTRIBUTION DI PIPELINES (RESTRAINED JOINTS) (100 ~300) MM, 36 KM TRANSMISSION DI PIPELINES (RESTRAINED JOINTS) (500~1000) MM, 15 KM HOUSES SERVICE CONNECTION PE (3\4:2) INCH AND 2000 DI SADDLES.

Duties & Responsibilities:

-LEADING AND MONITORING INDEPENDENCE CONTRACTOR QUALITY CONTROL TEAMWORK (CQC)

-REVISED SHOP DRAWING AND SUBMITTALS.

-FOLLOW UP SCHEDULETIME.

-CONTROLLING QUALITY AT SITE ACCORDING AWWA AND APPROVED SHOP DRAWING.

-CHECKING UP SURVEY SHEETS.

-REVISED INTERIM STATEMENT (EVALUATION).

-SUPERVISION SITTING OUT ,EXCAVATION TRENCHES, BEDDING , PE SLEEVE PIPES, PIPES INSTALLATION , FILTER FABRIC, SAND SURROUND, BACKFILLING (LAYERS) AND REINSTATEMENT .

-SUPERVISION INSTALLATION SLUICE VALVES, FITTING , SURFACE BOXES, FIRE HYDRANTS AND ALSO BUTTERFLY VALVE CHAMBERS, AIR VALVE CHAMBERS, WASH OUT VALVE CHAMBERS, HOUSE CONNECTIONS ,SADDLES.

-SUPERVISION HYDROSTATIC PRESSURE TESTS (ALLOWABLE LEAKAGE), FLUSHING AND DISINFECTION.COMMISSIONING

-SHUTDOWNS, CONNECTING TO HOUSES AND APPENDED EXISTING PIPES.

-CORRESPONDENCE (IN &OUT), DAILY REPORTS, MONTHLY PROGRESS AND AS BUILD DRAWING .FOLLOW UP

-PREPARING VARIATIONS .

-ATTENDING WEEKLY MEETING.

FROM 2000 TO 2004

Project Name: REHABILITATION WATER NET WORK IN KAFER EL SHIEK GOVERNORATE .CONTRACT K18A &18B.

Position:ASSISTANT RESIDENT ENGINEER

Employer :(SANES) SANITARY ENGINEER CONSULT DRSHAFIKHAMAM

Project Description :THE BUDGET OF PROJECT IS DM 43 MILLION, THE FUNDING OF CONTRACT IS SHARD BETWEEN GERMAN GOVERNMENT PROVIDING THE WORK INCLUDES RELAY DISTRIBUTION PIPELINES AND TRUNK MAIN PIPELINES ANDHOUSES SERVICE CONNECTION (DI ,UPVC ,AC,PE ) DIAMETER( 100~600) MM LENGTH 150 KM.12000 SADDLES (COST IRON ,DI AND UPVC).

DUTIES & RESPONSIBILITIES:

-REVISED SHOP DRAWING AND SUBMITTALS

-FOLLOW UP SCHEDULETIME.

-CONTROLLING QUALITY AT SITE ACCORDING DIN AND APPROVED SHOP DRAWING.

-CHECKING UP SURVEY SHEETS.

-REVISED INTERIM STATEMENT(EVALUATION).

-SUPERVISION SITTING OUT ,EXCAVATION TRENCHES, BEDDING , PE SLEEVE PIPES, PIPES INSTALLATION , FILTER FABRIC, SAND SURROUND, BACKFILLING (LAYERS) AND REINSTATEMENT .

-SUPERVISION INSTALLATION SLUICE VALVES, FITTING , SURFACE BOXES, FIRE HYDRANTS AND ALSO BUTTERFLY VALVE CHAMBERS, AIR VALVE CHAMBERS, WASH OUT VALVE CHAMBERS, HOUSE CONNECTIONS ,SADDLES.

-SUPERVISION HYDROSTATIC PRESSURE TESTS (ALLOWABLE LEAKAGE),FLUSHING AND DISINFECTION.COMMISSIONING

-SHUTDOWNS, CONNECTING TO HOUSES AND APPENDED EXISTING PIPES.

-SUPERVISION ROAD CROSSING (OPEN CUT AND DRILLING ) ,WATER COURSE CROSSING (OVER CANALES DRAINS ).

-SUPERVISION FOR LEAK DETECTION AND NIGHT FLOW& PRESSURE TEST .

-CORRESPONDENCE (IN &OUT), DAILY REPORTS , MONTHLY PROGRESS AND AS BUILD DRAWING .FOLLOW UP

-PREPARING VARIATIONS .

-ATTENDING WEEKLY MEETING.

From 1998 To 2000

Project Name: CONSTRUCTION SEWERAGE NETWORKS, MANHOLES AND PUMP STATION FOR 15 VILLAGES IN KAFER EL SHEIK GOVERNORATE.

POSITION:CONSTRUCTER MANAGER

Employer: ( ECONTO). ENGINEERING CONTRACTING.

Project Description:THE BUDGET OF PROJECT IS DM 150 MILLION, THE FUNDING OF CONTRACT IS SHARD BETWEEN GERMAN GOVERNMENT PROVIDING A GRANTFROM (KFW).THE WORK INCLUDES EXECUTED CIVIL WORKS OF SEWERAGE NET WORK AND PUMPS STATION AND WWTP.

Duties & Responsibilities)

-LEADING TEAMWORK

-SUBMITTED SHOP DRAWING AND SUBMITTALS.

-EXECUTING TRENCH EXCAVATION ,TIMBER SHORING ,SURFACE DEWATERING ,AGGREGATE BEDDING ,VC PIPES LAYING, SAND SURROUND ,BACKFILLING ,CONSTRUCTION PC MANHOLES ,ISOLATION AND C I COVER AND HYDRO STATIC PRESSURE TEST

-CONTROLLING QUALITY AT SITE ACCORDING EGYPTIAN CODE AND APPROVED SHOP DRAWING.

-PAYMENTS SUBMITTING AND PREPARING

-DAILY REPORTS ,METHODS OF STATEMENT AND AS BUILD DRAWING.SUBMITTED

-SUBMITTED SHOP DRAWING AND SUBMITTALS

-PREPARING AND SUBMIT SCHEDULE TIME .

-PREPARING REQUIRED MATERIAL LIST, LABORS ,SUBCONTRACTORS AND EQUIPMENTS

-PREPARING AND SUBMIT DAILY REPORT ,ORGANIZATION CHART AND METHODS OF STATEMENT.

-ATTENDING WEEKLY MEETING.

FROM 1996 TO 1998:

Project Name:CONSTRUCTION OF CAIROUNIVERSITYSTAFFVILLAGE AT NORTHERN COAST.

Position:EXECUTIVE MANAGER

Employer: (ALEXANDRIA CONSTRUCTION COMPANY _TALAAT MOSTAFA).

Project Description:THE BUDGET OF PROJECT IS EGP 80 MILLION. THE WORK INCLUDES CONSTRUCTION OF 600 VILLA INCLUDING SEWERAGE NETWORKS (UPVC), PRECAST RC MANHOLES AND PUMP STATION, WATER NET (UPVC) WORK AND STORM NET WORK.

Duties & Responsibilities :

-LEAD AND FOLLOW UP MANPOWER STUFF.

-SUBMITTED SHOP DRAWING AND SUBMITTALS.

-PREPARING REQUIRED MATERIAL LIST, LABORS, SUBCONTRACTORS AND EQUIPMENT.

-PREPARING AND SUBMIT DAILY REPORT ,CONSTRUCTING FOUNDATIONS , COLUMNS ,ROOFS ,BRICKS WALLS ,PLASTER ,TILES AND FINISHING .

-EXECUTING GATE VALVE(SLUICE OR BUTTERFLY) CHAMBERS ,AIR VALVE AND WASH OUT CHAMBER AND ALL REQUIRED FITTING, THRUST BLOCKS.

-PREPARING AND EXECUTING HYDROSTATIC PRESSURE TESTS, DISINFECTION, AND ALSO COMMISSIONING.

-PREPARING AND SUBMIT RFI'S .

-PREPARING INTERIM STATEMENT(EVALUATION).ALSO INVOICES FOR SUBCONTRACTOR AND VENDORSMONITORING REQUIRED SAFETY PLAN

-PREPARINGAS BUILD DRAWING.

-DEALING WITH CLIENT AND CONSULTANT.

-ATTENDING WEEKLY MEETING.

FROM 1994 TO 1996:

Project Name:CONSTRUCTION OF A MODEL FARM PRODUCTION OF UNPOLLUTED EGGS AT EL FAYOUM GOVERNORATE (KOM OSHIM).

POSITION:EXECUTIVE MANAGER

Employer:DELTA AGRO FOR DEVELOPMENT & CONSTRUCTION.

Project Description: THE PROJECT IS EGP 42 MILLION A GRANT FROM (IFAD) .THE OWNER IS MEDICAL VACCINE INSTITUTE . THE WORK WAS UNDER THE SUPERVISION OF (LOHMANTIERZUCHT ) GMPH

The Work Includes:CONSTRUCTION OF 6 PORTRAY HOUSES , STEEL STRUCTURE FODDER FACTORY AND INFRA STRUCTURE (WATER NET WORK (UPVC) ,(PP) ,SEWAGE NET WORK (UPVC) , STORM NET WORK (UPVC) ,FIRE NETWORK(SEMENS) ,MICRO MIST NET (STANLES STEEL).

Duties & Responsibilities:

-LEAD AND FOLLOW UP MANPOWER STUFF.

-PREPARING REQUIRED MATERIAL LIST, LABORS, SUBCONTRACTORS AND EQUIPMENT.

-PREPARING AND SUBMIT DAILY REPORT, CONSTRUCTING FOUNDATIONS, COLUMNS, ROOFS, BRICKS WALLS, PLASTER ,TILES AND FINISHING .STEEL STRUCTURE FOR FODDER FACTORY .

-EXECUTING GATE VALVE (SLUICE OR BUTTERFLY) CHAMBERS, AIR VALVE AND WASH OUT CHAMBER AND ALL.

-REQUIRED FITTING, THRUST BLOCKS.

-PREPARING AND EXECUTING HYDROSTATIC PRESSURE TESTS, DISINFECTION, AND ALSO COMMISSIONING.

-PREPARING INTERIM STATEMENT(EVALUATION).ALSO INVOICES FOR SUBCONTRACTOR AND VENDORS

-DEALING WITH CLIENT AND CONSULTANT

The work includes :

  1. CONSTRUCTION OF 6 PORTRAY HOUSES
  2. STEEL STRUCTURE FODDER FACTORY
  3. INFRA STRUCTURE (WATER NET WORK ,SEWAGE NET WORK , STORM NET WORK ,FIRE NETWORK ,MICRO MIST NET

FROM 1992TO 1994:

Project Name: CONSTRUCTION OF 1000 LAW COSTING UNITES AT NOUBARIA CITY.

POSITION:SITE ENGINEER

Employer:REFAAT CONSTRUCTION COMPANY.

Project Description :THE BUDGET OF PROJECTIS EGP 15 MILLION FROM EGYPTIAN GOVERNMENT

The Work Includes: CONSTRUCTION OF UNITES AND INFRA STRUCTURE :WATER NET WORK (UPVC) ,SEWAGE NET WORK (VC)

Duties & Responsibilities:

-PREPARING REQUIRED MATERIAL LIST, LABORS ,SUBCONTRACTORS AND EQUIPMENT

-PREPARING AND SUBMIT DAILY REPORT ,

-CONSTRUCTING FOUNDATIONS , COLUMNS ,ROOFS ,BRICKS WALLS ,PLASTER ,TILES AND FINISHING .

-PREPARING INTERIM STATEMENT(EVALUATION).ALSO INVOICES FOR SUBCONTRACTOR AND VENDORS ,DEALING WITH CLIENT AND CONSULTANT

FROM 1986TO 1992:

Project Name:CONSTRUCTION MODEL VILLAGES IN NUBARIACITY..

Position: SITE ENGINEER

Employer:GENERAL INSTITUTE FOR DEVELOPING PROJECTS

Project Description :CONSTRUCTION MODEL VILLAGES ,WATER NET WORK (AC) ,SEWAGE NET WORK (UPVC) IRRIGATION NET WORK (UPVC) , EXCAVATION OF CANALS AND DRAINS , ROAD CONSTRUCTION AND PAVEMENT .

Duties & Responsibilities

-REVISED SHOP DRAWING AND SUBMITTALS.

-CONTROLLING QUALITY AT SITE ACCORDING EGYPTIAN CODS AND APPROVED SHOP DRAWING.

-CHECKING UP MEASUREMENT SHEETS.

-REVISED INTERIM STATEMENT (PAYMENTS).

-SUPERVISIONFOREXCAVATIONCANALS AND DRAINS PLACING CONCRETEFORCANALS LINING, RC BRIDGES, REGULATORS, OUTFALLS, ROAD CONSTRUCTION.

FROM 1985TO 1986:

Project Name:DESIGNER ENGINEER IN DESIGN OF TOURSTIC VILLAGES AT NORTHEN COAST

Employer:MEDHAT EL SHIEKH CONSULTING OFFICE

Project Description:DESIGNED AND PREPARED SHOP DRAWINGS WITH REINFORCED DETAILS (FOUNDATION, COLUMNS, SLABS, BEAMS AND STAIRS OF TOURSTIC VILLAGES AT NORTHERN COAST.

Duties & Responsibilities:

DESIGNED AND PREPARED SHOP DRAWINGS.

KEY SKILLS :

1-Language Capabilities:

Speaking Reading Writing

Arabic Native speaker

English V. Good V. Good V. Good

2-Membership & Certification :

Membership in Project Management Institute (PMI) .

Certification : PMP Certified.

3-Computer capabilities

  • PRIMAVERA P3.1, PRIMAVERA P6 (TIME SCHEDULE, RESOURCE AND COST)
  • EXCEL , WORD.

4-Courses Study

  • FEASIBILITY STUDY
  • FIDIC
  • AUTOCAD & SAP 2000