SECTION 01564

SOIL EXCAVATION PROCEDURES

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Coordinate text with provisions in Technical Specifications Division 2 and Sections P-152, P-160, and

P-701 (latest revision). Expand/Modify as necessary, with the approval of MDAD, to suit the particular needs of the project.

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

PART 1GENERAL

1.01REQUIREMENT INCLUDED

A.Soil excavation and the procedure for the handling and disposal of reusable or environmentally non-reusable excavated material.

1.02RELATED REQUIREMENTS

A.Section P-152 - Excavation and Embankment.

B.Section P-160 -Contaminated Soil / Groundwater.

C.Section P-701 - Trenching, Backfilling and Jacking.

D.Division 2 - Various sections involving excavation work.

PART 2PRODUCTS

Not used.

PART 3EXECUTION

3.01The MDAD Environmental Engineering Division has instituted the following procedures to be followed by the Contractor during the excavation, hauling, reuse or disposal of excavated materials.

A.The Contractor shall prepare and submit a Soil Excavation Notification Form (SENF) to the Field Representative 96 hours prior to excavation; the Field Representative will in turn transmit this SENF within 24 hours from its receiving it to the MDAD Environmental Engineering Division (MDAD EED).

B.The MDAD EED will schedule an Environmental Oversight Manager (EOM) to observe the excavation and to classify the soils.

SOIL EXCAVATION PROCEDURES

01564-1 of 6

06/04 C:\DIV1\06-04\01564.DOC

C.The Contractor shall, as directed, [stockpile the excavated soil at the site] [haul the excavated soil to the off-site Staging Area specified in the Plans and Specifications]. MDAD EED will also appoint a Staging Area Manager (SAM). SAM is also responsible for surveillance of Miami International Airport Properties and notifies MDAD EED of any unreported excavation activities.

D.The EOM will sample the stockpiled soils for final disposition.

E.The EOM will forward the sampling results to the MDAD EED; MDAD EED will review these reports and provide the SAM with disposition data.

F.The following disposition procedure shall be followed pursuant to the Department of Environmental Resource Management (DERM) Soil Classification Criteria and P-160-1.2:

1.Reusable (Clean Soil) Material:

The Contractor shall, as directed by the Field Representative, reuse the soil at the job site or transport and stockpile the material at MDAD designated stockpile areas located within 5 miles from the work site. Any excess material from this category shall become the Contractor's property for removal, reuse, or disposal off the airport site.

  1. Reusable (Industrial or Residential) Soil Material:

The Contractor shall, as directed by the Field Representative, reuse Residential and/or Industrial soil at the job site or transport and stockpile the material at a MDAD designated stockpile area located within five (5) miles from the job site.

  1. Environmentally Non-reusable Soil Material:

Environmentally Non-reusable soils shall be hauled and disposed of off the airport property in accordance with the provisions of MDAD Standard Technical Specification Section P-160.

G.SAM will prepare a monthly summary report for MDAD EED; a copy of this report affecting the Contractor's work may be available for the Contractor's information and inspection at MDAD EED.

3.02FORMS

A copy of the forms to be filed by the Contractor and by the EOM and SAM are appended to this Section:

A.Soil Excavation and Notification Form (to be filled and filed by the Contractor).

B.MDAD Soil Tracking Form (to be filed by the Contractor, EOM and SAM).

Appendices: Forms listed in 3.02 A and 3.02 B above.

END OF SECTION

SOIL EXCAVATION PROCEDURES

01564-1 of 6

06/04 C:\DIV1\06-04\01564.DOC

MIAMI-DADE AVIATION DEPARTMENT

SOIL EXCAVATION NOTIFICATION FORM

PROJECT NAME:

PROJECT LOCATION:

CONTRACTOR:

CONTACT PERSON: PHONE:

MDAD/DAC PROJECT MGR.: PHONE:

FIELD REPRESENTATIVE:

SCOPE OF WORK TO BE PERFORMED:

ESTIMATED DIMENSIONS OF EXCAVATION:

LENGTH:

WIDTH:

DEPTH:

PROJECT START DATE:

PERSON COMPLETING FORM:

SIGNATURE:

DATE:

This form shall be filled in by the Contractor and filed with the Field Representative not later than 96 hours prior to excavation.

Miami-Dade Aviation Department

SOIL TRACKING FORM

Section 1Delivery Date:Batch Number:

Project Name:Pile Number:

Project Number:Cell Number:

Project Location:

MDAD-EE P.M.:

Material Quantity:Tons of Soil:and/or Number of Drums:

Material Tested?YesNoCharacterization:

Transporter:

Requested By:Date:

E.O. Consultant:

Consultant Rep:Tel Number:

Section 2Transported To:

Authorized By:Tel Number:

Signature:Date:

Section 3Quantity Received:Tons of Soil:and/or Number of Drums:_

Quantity Removed:Tons of Soil:and/or Number of Drums: __

Quantity Left on Site:Tons of Soil:and/or Number of Drums:__

Storage Location/Origin:

Number of Samples Needed:Pile Number:

Number of Samples Taken:Cell Number:

Parameters:

Sample(s) Collected By:Date:

Company Name:Tel Number:

Laboratory Name:Tel Number:

Section 4Disposition:Treated By:

Transporter:Treatment Type:

Date:TSDF:

Stage Manager:

Status:

Return completed form to Arturo Sosa (Tel. No. 305 876-7519 – Fax No. 305 876-0239) for approval.

NO SOIL DELIVERY WILL BE ACCEPTED WITHOUT PRIOR APPROVAL

SOIL EXCAVATION PROCEDURES

01564-1 of 6

06/04 C:\DIV1\06-04\01564.DOC