U.S. DEPARTMENT OF AGRICULTURE SD-ENG-19a Page 2 of 2

NATURAL RESOURCES CONSERVATION SERVICE REV. 07/2002

CONSTRUCTION INSPECTION REPORT

Owner/Operator / Date
Structure / Weather
Location / Farm ID
Inspector
Narrative:

REMINDER LIST - PRACTICES: ------

Earth Dams Drop Structures Grassed Waterways

Clearing Concrete Grading & Shaping

Earth Fill Timber Seeding

Excavation Pipe

Concrete Earth Fill Canals & Ditches

Principal Spillway Earth Excavation Grading & Shaping

Pipe Lining

Covered Drains Dugouts

Fence Earth Excavation Land Leveling

Spillway Grading & Shaping

Open Drain

Tile Drain Earth Excavation Terrace & Diversion

Covered Drains Grading & Shaping

REMINDER LIST - ELEMENTS: ------

Clearing Grading & Shaping Spillway Inlets

Adequacy Cross-Section Footing

Refuse Disposal Slopes Trash Rack

Finish Anti-Vortex Device

Earth Fill Gates

Foundation Stripping Pipe

Core Trench Trench Fence

Compaction Placing Alignment

Moisture Control Alignment Construction

Side Slopes Joints Gates

Cross-Section Bedding Bracing

Finish Backfill

Buried Pipe Line

Earth Excavation Covered Drains Alignment

Cross-Section Depth Joints

Depth Alignment Bedding

Bottom Width Filter Material Appurtenances

Berms Blinding Cover

Side Slopes Tile Quality Backfill

Spoil Disposal Manhole/ Inspection Box Pipe Quality

Outlets

REMINDER LIST - MATERIALS: ------

Timber Concrete Metal

Material Grading Aggregate Corrosion Protection

Treatment Batching & Mixing Section

Fastening Consistency Gage

Hardware Conveying & Placing

Reinforcing Steel Other Materials

Forms Type

Joints Weight

Coring

Finishing