Comment Form Project 2007-18 SAR for Reliability-Based Control

Comment Form Project 2007-18 SAR for Reliability-Based Control

Comment Form — Project 2007-18 — SAR for Reliability-based Control

Please use this form to submit comments on the proposedSAR for Reliability-based Control. Comments must be submitted byJune 13, 2007. Please submit the completed form by e-mail to with the words “RB Control” in the subject line. If you have questions please contact Gerry Adamski at or by telephone at 609-452-8060.

Individual Commenter Information
(Complete this page for comments from one organization or individual.)
Name:
Organization:
Telephone:
E-mail:
NERC Region / Registered Ballot Body Segment
ERCOT
FRCC
MRO
NPCC
RFC
SERC
SPP
WECC
NA – Not Applicable / 1 — Transmission Owners
2 — RTOs and ISOs
3 — Load-serving Entities
4 — Transmission-dependent Utilities
5 — Electric Generators
6 — Electricity Brokers, Aggregators, and Marketers
7 — Large Electricity End Users
8 — Small Electricity End Users
9 — Federal, State, Provincial Regulatory or other Government Entities
10 — Regional Reliability Organizations and Regional Entities
Group Comments (Complete this page if comments are from a group.)
Group Name:
Lead Contact:
Contact Organization:
Contact Segment:
Contact Telephone:
Contact E-mail:
Additional Member Name / Additional Member Organization / Region* / Segment*

*If more than one Region or Segment applies, indicate the best fit for the purpose of these comments. Regional acronyms and segment numbers are shown on prior page.

Background Information

The NERC Operating Committee endorsed the adoption of the proposedBalance Resources and Demand Standards BAL-007 through BAL-011; however,the proposed standards did not pass when balloted in April2007. The proposed standards were supported unanimously by all entitiesthat participated in the field test of the draft standards, includingReliability Coordinators and Balancing Authorities; however, commentsprimarily provided by WECC and NPCC members indicated thattransmission-related problems due to imbalanced operations should alsobe considered in the standards development.

The proposed SAR calls for retention of the already-drafted BAL-007through BAL-011 and continued work in that area, along with including inits scope the transmission-related concerns of the WECC and NPCC, theshort-duration frequency excursions associated with Interchange Scheduleramping, the transmission loading relief associated with load/resourcebalance after curtailment of Interchange Transactions, and thedirectives of FERC Order 693.

The purpose of the proposed SAR is to develop requirements to achieve the following objectives:

  1. Maintain Interconnection frequency within predefined frequencylimits under all conditions (i.e., normal and abnormal), to preventfrequency-related instability; unplanned tripping of load or generation;or uncontrolled separation or Cascading outages that adversely impactthe reliability of the Interconnection. (Work brought into this SAR from BAL-007 though BAL-011.)
  1. Support elimination of SOL/IROL violations caused by excessive (asdetermined by this standard) Area Control Error (“ACE”).
  1. Prevent Interconnection frequency excursions of shortdurationattributed to the ramping of on- and off-peak Interchange Transactions.
  1. Support timely transmission congestion relief by requiringcorrective load/generation management within a defined timeframe whenACE is impacted by the curtailment of Interchange Transactions undertransmission loading relief procedures.
  1. Address the directives of FERC Order 693.

Please review the SAR and thensubmit your comments on this form and e-mail to y June 13, 2007with the words “RB Control” in the subject line.

You do not have to answer all questions. Insert a “check” mark in the appropriate boxes by clicking the gray areas.

  1. Do you think that there is a reliability-related reason to support developing requirements to address the following?

To maintain Interconnection frequency within predefined frequency limits under all conditions (i.e., normal and abnormal), to prevent frequency-related instability; unplanned tripping of load or generation; or uncontrolled separation or Cascading outages that adversely impact the reliability of the Interconnection.

Yes

No

Comments:

  1. Do you think that there is a reliability-related reason to support developing requirements to address the following?

To support elimination of SOL/IROL violations caused by excessive (as determined by this standard) Area Control Error (“ACE”).

Yes

No

Comments:

  1. Do you think that there is a reliability-related reason to support developing requirements to address the following?

To prevent Interconnection frequency excursions of short-durationattributed to the ramping of on and off-peak Interchange Transactions.

Yes

No

Comments:

  1. Do you think that there is a reliability-related reason to support developing requirements to address the following?

To support timely transmission congestion relief by requiring corrective load/generation management within a defined timeframe when ACE is impacted by the curtailment of Interchange Transactions under transmission loading relief procedures.

Yes

No

Comments:

  1. Do you think that there is a reliability-related reason to address the directives in FERC Order 693 relative to the BAL standards?

Yes

No

Comments:

  1. Do you agree with the scope of the SAR? If no, please identify topics you feel should be added or deleted, and provide an explanation for your recommendations.

Yes

No

Comments:

  1. If you are aware of a Regional Variance that should be included in the scope of the SAR, please identify the variance below:

Variance:

  1. Are you aware of any Business Practice that should be developed to support the work described in this SAR? If yes, please identify what the Business Practice should address.

Yes

No

Comments:

  1. Do you agree with the applicability section of this SAR?

Yes

No

Comments:

  1. If there are any other comments you wish to provide the SAR drafting team that you have not already provided in response to the questions above, please provide them here.

Comments:

Page 1 of 5