NORTH WESTERN RAILWAY

CHIEF ENGINEERS OF CONSTRUCTION DEPARTMENT

S.No. / Officer & Works assignments
1 / Sh.Ved Prakash ,CE/C/I
All works entrusted t Construction within territorial juridiction of JP Division except work of new line of DO-GGC.
Work of Bhiwani bye-pass.
Civil Engineering works of replacement of Signaling and Electronic equipments of Bhiwani & Satroad stations.
RUB works at LC Nos.53B,54A&80 in RE-HSR Section.
He will assisted by Dy.CE/C/II/III& & GC /JP for above works.
He will be assisted by Dy.CE/C/P&D in HQ office.
Any other works entrusted by CAO(C).
2. / Sh. S.K.Jindal , Chief Engineer /C/II
All works entrusted to Construction between BEC JN (Ex.) to HMT (Excl.)of AII Division.
Work of DNRP-RTM new line.
He will will be assisted by Dy.CE/C/UDZ,DNRP,BSNW& RTM for above works.
He will look after procument of P.Way material & fittings and MAS returns of Construction. He will be assested by Dy.CE/C/TP in HQ office.
Any other work/entrusted by CAO(C)
3. / Sh C.L.Meena, Chief Engineer /C/III
All works entrusted to Construction in territorial jurisdiction of JU division and all
Works in the section from KSG to PNU of AII Division including
DFCCIL works.
Works of new line of BNGM-RAS
Work of Modernization of Ajmer Workshop.
He will be assisted by Dy.CE/C/I&II/AII and Dy.CE/C/JU for above works.
He will be assisted by Dy.CE/C/Design in HQ office.
He will be in-charge of Establishment matters and will be assisted by SPO/C/.
Any other work/s entrusted by CAO/C/
He will be in-charge of Establishment matters and will be assisted by SPO/C
4. / Sh V.D.S Kaswan, Chief Engineer /C/IV
All works in territorial jurisdiction of BKN Division except works mentioned in para 1(b),(c) &(d) above. He will be assisted by Dy.CE/C/BKN& Dy.CE/C/HMH fo above works.
He will be assisted by Dy.CE/C in HQ office.
Any other work/s entrusted by CAO/C
5. / Shri Rajesh Arora, CE/C/HQ/JP
He will be in-charge of wroks of DO-GGC new line.
He will Assisted by Dy.CE/LHS for works of DO-GGC new line.
He will look after the RTI matters as PIO.
He will be assisted by Dy.CE/C/W in HQ office.
Any other work/s entrusted by CAO/C

Construction HQ Officers & staff

S.No. / Officer & Works assignments
1 / Secretary to CAO(C)
Co-ordination for survey works in HQ.
Training programme for officers and staff.
Keeping updated Bio data of officers.
Allotment of ORH (Const)
Construction Library
Surprise Inspection of various ongoing works
Any other work assigned by CAO/C/JP
2 / Dy Chief Engineer /C/P&D
Assisted by
A / A.K.Sharma AEN/C/Planning (In charge of General & Budget Section)
(a) / General & Planning Section
Shri S.K.Shrma,ChOS. & Tarun Varshney Ch OS(In charge of General & planning Section),Kishan Sen OS(T)/Ku.Pavitra clerk
(i) / PCDO /MCDO/ progress report (other then works contracts) of on going works of CAO© which are sent to GM/Railway Board/other official.
(ii) / IT and
ftp related matters,& reply of Parliament Questions & CA-III Reference
(iii) / Presentations of construction Deptt
(iv) / Compliance of Inspection Note/Safety drives
(v) / P&T telephone bills of CAO/C/ HQ office.
(vi) / Dealing Cash imprest proposals of HQ officials & Field officials
and upkeep of Cash Imprest of CAO/C
(vii) / Arrangement of Air tickets of officers
(viii) / Circulation of Policy circular including SOP other then works, store, track & establishment
(ix) / Misc. correspondence of General & other works assigned by Dy CE/C/P&D
(xi) / DPG-References and reply of other public demands MLA/MP leters.
(b) / Budget Section
Kashirams Meena, Sr. SO A/Cs
Budget statements for construction organization, Distribution of budget grants, budgetary reviews, arrangement of funds and all other related matters including re-appropriation etc.
B / R.S. Meena AEN/C/IT
(In Charge of IT Section )
Nand Kishore, OS-II, Jitendera Sharma, Sr .Clerk
Receipt & dispatch work
C / Rajeev Dwivedi, XEN/C/Design/I/JP
(a) / Design section (CE/C/I,IV)
Alok Vyas SE/Drg
Design of all the structures of CE/C/I &CE/C/IV
D / Shiv Charan Bairwa (Rajbhasa Officer )
Rajbhasa Section
(a) / Smt Gambhir Rathod OS/I/Rajbhasa
Rajbhasa work of Construction Organization.
3 / Dy Chief Engineer /C/W
Assisted by XEN/C/W (Sh. B.L.Meena),
W-I .Shri Roop Chand Meena Ch. OS/W/I (Sh. Perulal Meena), ChOS,
Smt.Alkoa Sachdewa OS,,Sh.Ashok Sen OS(T)under control of CE/C/III & IV.
W-II H.S. Nagpal OS,Sh. Babulal OS ,Sh. R.K.Meena,under control CE/C/I,II& HQ
(a) / Works Section
(i) / Works section policy matter including circulation policy circulars of construction
(ii) / Matters related to works tenders and contract including sale/opening of works tenders at JP HQ office.
(iii) / Progress report of works contracts
(iv) / Land acquisition matters
(v) / Arbitration matter pertains to construction
(vi) / Audit objections special letters , draft para, provisional para, audit para, DATN pertaining to construction
(vii) / Enlistment /registration of contractors.
(viii) / Quartely Tender position ,Monthly CVC position, Weekly tender position, Draft paras of RTI
4 / Vacant
(a) / ROB/RUB Cell
Assisted bySh.G.L.Pandar XEN/C/HQSh.P.K. Bansal AEN/C/LHS Sh.Rajendra Singh Ch OS ,Sardar Singh OS Ram Nath JE/C/W
(i) / Sanction of Detailed Estimate of ROBs
(ii) / Approval of design of ROBs being constructed by IRCON
(iii) / Compiling weekly review position ROB for GM
(iv) / DFCCIL works(ROB,LHS and other Civil & P.Way works)
(b) / Any other works/responsibility assigned by CAO/C
(b) / Estimate section
Amit Kumar JE/C/Drg.
Processing sanction of detailed estimate/material modification/revised estimates/completion reports/Project Report.
Jaipur & Ajmer World class station project and Jaipur Metro Project.
5 / Dy Chief Engineer /C/TP
Assisted byXEN/TS-I (A.C. Tiwari)
(a) / Track cell
Smt. Sashi Kala Rao, Sh. S.K.Dutta , Ram Narayan OS,Bina Rudhani Typist
Track Policy matter
Compilation & issue of instructions/circulars regarding track works
Planning, procurement, distribution & auction of P.Way materials.
Demurrage and warfage; Write off of P.Way material.
Deployment of Track Machine.
Stock Sheets /Audit /Drafts Paras pertaining to P Way material.
Note: - Dy.CE/C/TP shall also do surprise inspection of store of field units.
(b) / Legal Cell
Bhanwar Lal Meena, CLA & Pritamsingh Meena, OS
Court cases ,Payment of the advocates etc.
6 / Dy Chief Engineer /C/Design
Assisted bySh.Rajendra Kumawat, XEN/C/D/II
(a) / Design Section CE/C/II,III&HQ
R.K.Sharma, SE/C/D, Binod Khugsal, SSE/Drg, D.D.Yadav, SE/C/D, Balvir Singh, SE/C/D .
Finalization of design and drawings of all the civil Engg. Works including Yard plans and L-sections of CE/C/II&III/HQ/JP under Dy CE/C/D and CEC/I&IV under Dy CE/C/P&D
CRS sanctions and CRS inspection notes of CE/C/II/III &HQ jurisdication & technical investigation of on going projects.
Computer cell – Installation & Maintenance of work station capable of handling design, drawing & estimating. Maintenance of digitized records/ reference drawings/codes and manuals.
(b) / Store section
Pyerlal Meena, OS,Bhagwan singh,OS ,Km.Pinki Rani Clerk
General up keep of office equipments
Indent of stationery items of CAO/C office.
Indent& Maintenance of Printer, Computer, Furniture, Xerox Machine and other Non-stock items. House keeping items of Store.
Maintenance & DS-8 of T&P, Machine & Motor vehicle
7 / Senior Personnel Officer /C (In charge of Establishment Section)
(a) / Establishment Section
R.G.Yadav, OS-I, A.S. Gurjar,Bhart Bhusan Verma, OS-
,Rajendra Kumar, OS, Ramchand, OS`
In charge of office establishment of CAO/C/ Office.
CR of non Gazetted staff
DAR Gazetted and non Gazetted
Transfer and Promotion of Gazetted & Non Gazetted staff.
Posting of class-III & IV staff
Union items, House keeping items of Establishment
Seminar, training etc.
Pay sheet work
Policy matter of Establishment
Quarter dealing of Construction pool
Misc. establishment correspondence.
Attendance register will be closed at specified time by OS/I & put up to SPO/C.In absence of SPO/C it will be put up to Dy CE/C/P&D.
(b) / Shri Ajay Singh Gujar –Staff grievances matter

FIELD DY CHIEF ENGINEERS OF CONST DEPTT

(a) Chief Engineer /Construction /I/ UNIT

S.No. / Officer & Works assignments
1 / Dy Chief Engineer/C/II/JP
Phulera – Broad gauge diesel locomotive shed
Jaipur – Yard Remodeling& GC work
RUB at Military Area and Ajmer Puliya (Deposit Work)
ROB/RUB at JP area (LCno.232 & 234)
Résidual Works of Jaipur-Phulera and Jaipur-Dausa Doublings.
Shifting of station building at Kishangarh in connection with DFCCIL Work.
2 / Dy Chief Engineer /C/III/JP
Harsauli-Rewari (39.35 km) doubling
Residual works of Alwar-Harsauli (34.86Km) doubling
Rewari-Jhaijar ROB in lieu of LC No. 57-B
Alwar-ROB in lieu of LC No.117-C (Deposit Work )
Residual Works of Agra fort-Bandikui GC
ROB in lieu of LC -61 (Anajmandi)
Survey of AWR- Charkhi- Dadri new line
Survey of RE byePass
Jaipur-Setting up of NWR-Zone: Head Quarter office building residual works.
Jaipur-Setting up of NWR-Zone: Officers & staff Quarter at Jagatpura.
Vehicle hiring for HQ officers & Field officers at Jaipur Head quarters.
Shifting of Kisangarhgarh station at new location in connection with DFCCIL.
Shifting of Utility on DFC alignment in Jaipur Division.
ROB /RUB at JP area (LC. No. 232 &234)
Alwar-Bandikui boubling work.
3 / Dy Chief Engineer /C/GC/JP
Sīkar (incl.) – Churu (incl.) & Sikar (incl.) –Loharu (incl.) Gauge Conversion (212.61 Km) part of Jaipur-Ringus-Churu & Sikar-Loharu GC (320.04 km) Project.

(b)Chief Engineer /Construction /II/ UNIT

1. / Dy Chief Engineer /C/UDZ
Udaipur-Himmatnagar Gauge Conversion
Residual works of Mavli-Nathdwara GC.
Nathdwara new line & Mavli Jn-BadiSadari GC work.
2. / Dy Chief Engineer /C/DNRP
Dungarpur-Ratlam via Banswara New BG line from Km.00 to Km.88.00 Km.
3. / Dy Chief Engineer /C/Banswara,
Dungarpur-Ratlam via Banswara New BG line from Km.88.00 to 176.47 .
4. / Dy Chief Engineer /C/RTM

(c)Chief Engineer /Construction /III/ UNIT

1 / Dy Chief Engineer /C/I/AII
(i) / Ajmer-Pushkar Line (31.40 Km)
(ii) / Bangurgram-Ras New line (27.8 Km)
(iii) / Ajmer-Bangurgram Doubling (48.43 Km)
(iv) / Bangurgram –Guriya Doubling (47 Km)
(v) / Ajmer –Modernization of carriage works shop
(vi) / Ajmer –Modernization of loco works shop
(vii) / Madar-Shifting of coach maintenance facilities from Ajmer
(viii) / Shifting of utilities in connection withDFC work between Ajmer –Guriya
(ix) / LHS works between Ajmer –Guriya &
(x) / Other minor work of Ajmer Division
(xi) / Ajmer-Kota new line
(xii) / Puskar-Metra new line.
(xiii) / Setting up greenfield MCMU at Bhilwara.
2 / Dy Chief Engineer /C/II/AII
(i) / Keshvganj –Swaroopganj –doubling (26.48 Km),,
(ii) / Guriya –Marwar (43.50 Km.)doubling
(iii) / Marwar-Rani (54.5 Km) doubling
(iv) / Shifting of utilities in connection with DFC work bet.Guriya –Palanpur section
(v) / LHS works bet.Guriya-Palanpur sect,.
(vi) / ROB in lieu of LC No.81 at Phalna
3 / Dy Chief Engineer /C/JU
(i) / JU-Yard remodeling
(ii) / RUB in lieu of LC No.C-325
(iii) / ROB in lieu of LC no.21,61 & 293
(iv) / Bhagat ki kothi Diesel shed works,
(v) / Marrana –Bidiyad track track diversion
(vi) / Other minor works of JU Div
(vii) / Thaiyat-Hari-Sanu new line.
3 / Dy Chief Engineer /C/Survey/JP

(d)Chief Engineer /Construction /IV/ UNIT

1 / Dy Chief Engineer /C/I/BKN
(i) / Ratangarh-Sardarshahar GC (47.54 Km)
(ii) / Residual worksof Bikaner- Ratangarh-Sadulpur GC & Kolayat-Phalodi new BG line
(iii) / Bikaner X-ing stations (02 nos.)
(iv) / BKN yard remodeling
(v) / ROB at LC 138
(vi) / Deposit work Sudharna &Jharli
(vii) / Rewari-Hissar Std.III
(viii) / RE-HSR ROB at LC 19-C
3 / Dy Chief Engineer /C/HMH
(i) / Sriganganagar-Hanumangarh-Diplana GC
(ii) / Residual works of Rewari-Sadulpur-Hissar GC
(iii) / Residual works of Sirsa-ROB at LC no.143 ,RE-SDLP ROB at LC no.100 & RE-HSR ROB at LC at no.33
(iv) / Residual works Lalgarh-Suratgarh –Std III (13 Stations)

(e)Chief Engineer /Construction /HQ/ UNIT

1. / Dy Chief Engineer /C/LHS/DO at JP
(a)(i) / LHS works: He will coordinate the following works in HQ
(ii) / Site Survey
(iii) / Sanction of details
(iv) / Approval of GAD
(v) / Consent for closure of LC from Stat Gov.
(vi) / Tendering and planning of execution at HQ level
(vii) / Co-ordination with operating and S&T Departments regarding traffic blocks
(viii) / Compiling weekly review position for GM
(b) / He will lookafter the work of DO-GGC New line
(c) / Any other works/responsibility assigned by CAO/C
Sh.Pawan Kumar Bansal,AEN/C/HQ/JP &Sh.Ramnath JE/W/JP
2. / Dy.CE/C/W/ office./APIO / RTI Assists. by Sh.R.A.Sharma,TI/C/& Sh.Ajay Sharma OS