CASS TOES FOR SIS SAFETY LIFECYCLE ASSESSMENT (IEC 61511-1: 2016)

The following notes should be read first:

  1. For general guidance on using CASS conformity assessment documents, refer to: ‘Guidance for assessors on using the CASS TOEs’ available from
  2. This conformity assessment template is for the generic SIS safety lifecycle aspects from IEC 61511-1 clauses 6, 7 and 19. It should be used with the template ‘CASSTOESforFSMAssessmentfromIEC61511-12016’ for the generic functional safety management aspects from clause 5.
  3. The TOEs in this template are applicable to all the safety lifecycle phases (clauses 8 to 18) that are in the scope of the FSA.
  4. In addition to the two generic templates mentioned above, an assessment of the SIF(s), SRS and SIS should be performed against each relevant clause of the standard (i.e., clauses 8 to 18) as appropriate to the safety lifecycle phases in the scope of the FSA.
  5. The following acronyms are used in this template:

CASS / Conformity assessment of safety-related systems
FSA / Functional safety assessment
FSM / Functional safety management
H&RA / Hazard and risk assessment
O&M / Operation and maintenance
SIF / Safety instrumented function
SIL / Safety integrity level
SIS / Safety instrumented system
SRS / Safety requirements specification
TOE / Target of evaluation
TOE Ref. / Target of Evaluation (TOE) / Purpose of TOE / IEC 61511 references / Auditee’s documents / Assessor’s comments
1 / SIS safety lifecycle definition / To ensure the approach to the phases and activities of the SIS safety lifecycle are structured and defined in a manner that corresponds to Figure 7 and Table 2 of 61511-1 for the scope of the project and that it defines the inputs, outputs and verification to a sufficient level of detail to allow completion of each phase/activity. / 6.2.1
6.2.2
2 / SIS safety plan / To confirm the SIS safety plan/planning defines the activities, criteria, techniques, measures, procedures and responsible organisations/people to ensure:
a)SIS safety requirements are achieved for all modes of the process
b)proper installation and commissioning of the SIS
c)safety integrity of the SIF after installation
d)safety integrity during operation
e)process hazards are addressed during SIS maintenance / 6.2.3
3 / Changes to previous lifecycle phases / To confirm that any required changes that affect a previous lifecycle phase are re-examined, altered as required and re-verified. This applies to changes identified anywhere from hazard and risk assessment to O&M, e.g., as a result of document review, design, test, implementation, etc. If the change is to a SIS already in the O&M phase, then the lifecycle phase ‘SIS modification’ applies and will require a detailed assessment against each requirement in clause 17. / 6.2.4
4 / SIS application program lifecycle / To ensure the SIS application program lifecycle is structured and defined in a manner that corresponds to Figure 8 and Table 3 of 61511-1 for the scope of the project and that it defines the inputs, outputs and verification to a sufficient level of detail to allow completion of each phase/activity. / 6.3.1
6.3.3
5 / Application programming methods / To ensure the appropriate methods, techniques and tools have been planned for development of the SIS application program to meet clause 12.6.2. / 6.3.2
6 / Verification planning (general) / To ensure verification is planned in a sufficient level of detail to describe:
a)the verification activities
b)the procedures, measures and techniques to be used
c)when verification will take place
d)the persons, departments and organizations responsible, including levels of independence
e)how to manage and implement actions, recommendations and non-conformances identified by verification
f)identification of items to be verified
g)identification of the information against which the verification is carried out
h)the adequacy of the outputs against the requirements for that phase
i)correctness of the data
j)tools and supporting analysis
k)the completeness of the SIS implementation and the traceability of the requirements
l)the readability and audit-ability of the documentation
m)the testability of the design
n)the tests that demonstrate non-safety functionality does not interfere with safety-functions / 7.2.1
7.2.3
7 / Verification planning (testing) / To ensure that when testing is specified, verification planning covers:
a)the strategy for integration of application program and hardware and field devices, including the integration of sub-systems that shall comply with other standards
b)test set-up and type of test to be performed including the hardware, application programming, and programming of devices
c)test cases and test data
d)the test environment, tools, hardware, software and required configuration
e)test criteria on which the results of the test will be evaluated
f)procedures for corrective action on failure during test or non-conformances
g)physical location(s) (e.g., factory or site)
h)dependence on external functionality
i)personnel
j)management of change / 7.2.2
8 / Implementing the verification plan / To confirm the verification activities have been performed in accordance with the verification plan for each phase/activity specified in the SIS safety lifecycle planning. / 7.2.4
9 / Modifications and re-verification / To ensure that any modifications resulting from testing are subjected to impact analysis and any necessary re-verification performed. / 7.2.5
10 / Verification documentation / To ensure the verification results are made available and the objectives and criteria have been met (See also TOEs 11-13). / 7.2.6
11 / Information and documentation (general) / To confirm that documentation produced as part of SIS safety lifecycle activities/phases is fit for purpose, available to those involved in the SIS safety lifecycle and contains all relevant descriptions of the SIS design, installation, operation, maintenance and testing. Each document should be accurate, understandable, accessible, maintainable (i.e. editable) and traceable to the SRS and H&RA. / 19.2.1
19.2.2
19.2.3
19.2.5
12 / Document identification and revision control / To ensure each document is appropriately designated for its type, is uniquely identifiable, contains a revision index, is searchable and stored so as to allow location of the latest revision and is revised, reviewed, approved and under appropriate revision control. / 19.2.4
19.2.6
19.2.7
19.2.8
13 / Documentation scope and contents / To ensure the documentation covers:
a)Results of the H&RA and the related assumptions
b)Equipment that forms the SIS with related safety requirements
c)Organisation responsible for maintaining functional safety
d)Procedures necessary to achieve and maintain functional safety of the SIS
e)Revisions from any modifications
f)Relevant safety manual(s)
g)Design, implementation, test and validation / 19.2.9

CASS_TOES_for_SIS_Safety_Lifecycle_from_IEC_61511-1_2016_v1Page 1 of 7 © The CASS Scheme Limited 2017