CARRICULLUM VITEA
Plot No, 215, Salama Park,
Simon Mwansa Kapwepwe Rd
P.O BOX 38269 LUSAKA, ZAMBIA
PERSONAL DATA
Name: Moses Mushinka
Sex: Male
Date of Birth: February 2, 1984
Nationality: Zambian
NRC: 946522/11/1
Religion: Christian
Physical Address: Plot No, 215, Salama Park,
Simon Mwansa Kapwepwe Rd
P.O BOX 38269 LUSAKA, ZAMBIA
Contact details Email: , or
; Phone: +260 966 346 041
Paid up Member of the Engineering Institution of Zambia/Engineering Registration Board.
Other Responsibility: Occupation Health and Safety Officer
OBJECTIVE
Become an expert in - Networking and Telecommunications Engineering.
SUMMARY OF TECHNICAL SKILLS
Excellent communication skills and hands on field experience in,
LAN/WAN. Configure switchers and routers and end user equipment. VLANs, EIGRP, BGP,OSPF routing protocols, Wifi access points, VPN, IP addressing and Configurations using JUNO and Cisco’s (CCNA) problem-solving and analytic skills.
Desktop application software installations HTTP,FTP,SMTP, network monitoring and maintenance.
Hardware installation of Server, Ethernet and fiber cable lacing and power terminations.
RF- Single site verification, Cluster Optimization, GSM, GPRS Installations, configurations and Transmission starting fromPABX, UMT,GSM, WCDMA/UMTS and LTE-4G, Genex probe, Assistant and Genex cloud, PHU, Mapinfo and TEMS application.
Electrical Power Supply installation and high voltage Transmission, Solar systems and generators. Trouble shooting and Diagnosing of Electronic circuits.
Aircraft Navigation, Communication and surveillance systems which includes, RADAR, Instrument Landing Systems, GPS-Satellite systems, VORs, Non Directional Beacons, Distance Measuring Equipment. Aircraft Radio Transceivers, Press-to Talk Radios etc.
Good knowledge of Telecommunication and Aviation management and Operating
Principles in relation to Institutions such as ZICTA, ITU.IEEE, ZCAA, EIZ, FAA, CAA, IATA,and ICAO.
Qualification / Year / SCHOOLDip Aeronautical Electronics (avionics) Engineering / 2007-2010 / Zambia Air Services Training Institute (ZASTI
Occupation Healthy and Safety-working at Heights / 2016 / Quality Business Consultants
CISCO-CCNA Exploration 1, 2, 3 & 4 / 2015 / UNZA
MS-Projects, Microsoft Word, Microsoft Excel &Power Point. / 2015 / UNZA
GCE O’ Level / 2002-2004 / Hillcrest National Technical High School
JSSL / 2000-2001 / Kafue Boys Secondary School (UCZ)
Grade Seven school Certificate / 1993-1999 / Chinika Basic School
Certifications
RF-GSM, LTE & Wimax Service Engineer (HWC-SA-ZM-1710052)
Microwave hardware installation configuration Certificate number (HWC-SA-ZM-1710022)
Wireless Hardware installation &Configuration Certificate number (HWC-SA-ZM-1710022)
Environmental Health and Safety certified Engineer(HWC-SA-ZM-1710022)
Huawei ISDP certified Engineer(HWC-SA-ZM-1710022)
May 2013, successfully completed CPD training with the Engineering Institution of Zambia on:
- Total Quality Management in Infrastructure Delivery.
- Electricity Infrastructure Development for economic growth.
Admission to the Engineering Institution of Zambia EIZ (2012)
WORK EXPERIENCE
Date / Organization / Position / RoleCurrent
2016
To 2017
02/07/2011 to 05/10/2016 / Afro-Egypt
Vodafone Zambia
Crystal Solutions Group
Limited,
Exceed Communication Limited / RF-Team Lead Engineer
Deployment, implementation &Optimization
Engineer Reported to Head of Network Planning & Optimization
Owen Simwanda
+260960281587
Projects Support Engineer
Reported to Managing director.
Humphrey
Kasale 0977770036 / RF Single Site Verification (SSV), Drive Tests and Optimization for 2G, 3G and LTE-4G for Zamtel sites, and GRZ Project.
DN/MR sorting, Equipment collection from warehouse and deployment to teams in the field.
Installation of Huawei 2G, 3G & LTE-4G Wireless and microwave Transmission and all power Related works
Updating progress reports on ISDP and group of material collection, deployment and installation in the in the field.
Attending to emergence.
eNode-B roll-out and Site acceptance,
Responsible for technical solutions and delivery approach of new initiatives.
Conduct RF walk testing for Site evaluation &Post integration testing to ensure Optimal Site performance.
Evaluation &design of special coverage solutions such as Solar power solutions, Power consumption for small repeaters or Active/Passive DAS systems.
Interface with planning & Operations team for impact analysis & defining RAN &connectivity required work packages and approach for specific activities,
Attend site surveys to scope proposed required locations, Cable routes and equipment placements etc.
Managing 3rd party Vendors & partners to meet network roll-out objectives and sharing status of all outstanding issues.
Project planning, Field Implementation and evaluations.
Project implementation- Supervising Installations of all networking and telecommunication equipment.
Managing, monitoring and maintaining company’s IT infrastructure
Supervising Technicians/Riggers &preparing real time field reports in order to meet and Track Project’s KPIs
Ensuring quality workman ship, Engineering standards and safety are maintained during Project implementation. Preparation of Site acceptances.
Projects Worked On
2017
2016
2015
2014
2012 / RF Single Site Verification (SSV), Drive Tests and Optimization for 2G, 3G and LTE-4G for Zamtel/GRZ sites. Tools used, Genex probe, Assistant, Genex cloud and Mapinfor
Single Site Verification (SSV), Physical site Audit and Optimization Ericsson 2G,3G <E 4G, Airtel sites
eNod-B Roll-out, Configurations, commissioning, Drive Tests and Optimization. Site inspection and acceptance Vodafone Zambia.
Nokia Single IP RAN Modernization Installations Copper Belt Region.
NEC microwave Point-to-Multipoint enterprise link installation, Configuration and Commissioning
Ericsson Radio recovery, DCN Planning and rerouting, OSPF Configurations on Airtel Networks
Airtel RAN Modernization Ericsson 6000 series Modules, TR-RX Cell Site Network Grow/Degrow network expansion for Airtel Networks, (Nokia Siemens BTS, Flexi and 6601 Ericsson BTS Modules)
Ericsson BSC installation, power termination and commissioning,
Site Interventions, Preventive &Corrective maintenance under Exceed Communications Limited on 275 Airtel Cell Sites.
Installation of Ericsson Charging Nodes Voucher Server, Cisco Switches (MPBN).
OSS Installation (Oracle servers) on Airtel’s Core network.
Microwave Installations, Alignment, Configurations, sweep tests, script software uploading & commissioning of 40 BTS sites for Zamtel. (ZTE-NEC)
Generator Installations &commissioning on 34 MTN Sites.
Navigation light Installation for Airtel Towers.
Deep-cycle Battery backup Installations in 54 BTS-MTN Sites.
April 2011 To, 2012 / Zambezi Airlines. / Avionics trainee Engineer (Intern) / Routine &Non routine Avionics maintenance &repair on Boeing 737-500 series.
Nav lights, Comm systems, two way Radios, Power supply. Instruments. General Electrical
C checks on Avionics equipment
INTERESTS AND HOBBIES
ICT Innovations and Soccer.
ATTRIBUTES
Team player, goal oriented, Assertive, Innovative and adaptive
Able to work with minimum supervision within specified terms of reference
LANGUAGE ABILITIES
English, Bemba, Lenje and Tonga
REFEREES
- Mr Arthur Mukandawire
Power Systems Engineer
Airtel Networks Zambia
Mobile Phone: +260 978980074
- Mr Mwangana
Vice Principal, P.O BOX 310198, Mobile Phone: +260 97860761
Zambia Air Services Training Institute (ZASTI)
- Rev. Bishop L Chibuye
United Church Of Zambia, E-mail
P.O. Box 50035 Ridgeway, Lusaka. Phone; +26 0977795239