CARRICULLUM VITEA

Plot No, 215, Salama Park,

Simon Mwansa Kapwepwe Rd

P.O BOX 38269 LUSAKA, ZAMBIA

PERSONAL DATA

Name: Moses Mushinka

Sex: Male

Date of Birth: February 2, 1984

Nationality: Zambian

NRC: 946522/11/1

Religion: Christian

Physical Address: Plot No, 215, Salama Park,

Simon Mwansa Kapwepwe Rd

P.O BOX 38269 LUSAKA, ZAMBIA

Contact details Email: , or

; Phone: +260 966 346 041

Paid up Member of the Engineering Institution of Zambia/Engineering Registration Board.

Other Responsibility: Occupation Health and Safety Officer

OBJECTIVE

Become an expert in - Networking and Telecommunications Engineering.

SUMMARY OF TECHNICAL SKILLS

Excellent communication skills and hands on field experience in,

LAN/WAN. Configure switchers and routers and end user equipment. VLANs, EIGRP, BGP,OSPF routing protocols, Wifi access points, VPN, IP addressing and Configurations using JUNO and Cisco’s (CCNA) problem-solving and analytic skills.

Desktop application software installations HTTP,FTP,SMTP, network monitoring and maintenance.

Hardware installation of Server, Ethernet and fiber cable lacing and power terminations.

RF- Single site verification, Cluster Optimization, GSM, GPRS Installations, configurations and Transmission starting fromPABX, UMT,GSM, WCDMA/UMTS and LTE-4G, Genex probe, Assistant and Genex cloud, PHU, Mapinfo and TEMS application.

Electrical Power Supply installation and high voltage Transmission, Solar systems and generators. Trouble shooting and Diagnosing of Electronic circuits.

Aircraft Navigation, Communication and surveillance systems which includes, RADAR, Instrument Landing Systems, GPS-Satellite systems, VORs, Non Directional Beacons, Distance Measuring Equipment. Aircraft Radio Transceivers, Press-to Talk Radios etc.

Good knowledge of Telecommunication and Aviation management and Operating

Principles in relation to Institutions such as ZICTA, ITU.IEEE, ZCAA, EIZ, FAA, CAA, IATA,and ICAO.

Qualification / Year / SCHOOL
Dip Aeronautical Electronics (avionics) Engineering / 2007-2010 / Zambia Air Services Training Institute (ZASTI
Occupation Healthy and Safety-working at Heights / 2016 / Quality Business Consultants
CISCO-CCNA Exploration 1, 2, 3 & 4 / 2015 / UNZA
MS-Projects, Microsoft Word, Microsoft Excel &Power Point. / 2015 / UNZA
GCE O’ Level / 2002-2004 / Hillcrest National Technical High School
JSSL / 2000-2001 / Kafue Boys Secondary School (UCZ)
Grade Seven school Certificate / 1993-1999 / Chinika Basic School

Certifications

RF-GSM, LTE & Wimax Service Engineer (HWC-SA-ZM-1710052)

Microwave hardware installation configuration Certificate number (HWC-SA-ZM-1710022)

Wireless Hardware installation &Configuration Certificate number (HWC-SA-ZM-1710022)

Environmental Health and Safety certified Engineer(HWC-SA-ZM-1710022)

Huawei ISDP certified Engineer(HWC-SA-ZM-1710022)

May 2013, successfully completed CPD training with the Engineering Institution of Zambia on:

  1. Total Quality Management in Infrastructure Delivery.
  2. Electricity Infrastructure Development for economic growth.

Admission to the Engineering Institution of Zambia EIZ (2012)

WORK EXPERIENCE

Date / Organization / Position / Role
Current
2016
To 2017
02/07/2011 to 05/10/2016 / Afro-Egypt
Vodafone Zambia
Crystal Solutions Group
Limited,
Exceed Communication Limited / RF-Team Lead Engineer
Deployment, implementation &Optimization
Engineer Reported to Head of Network Planning & Optimization
Owen Simwanda
+260960281587
Email
Projects Support Engineer
Reported to Managing director.
Humphrey
Kasale 0977770036 / RF Single Site Verification (SSV), Drive Tests and Optimization for 2G, 3G and LTE-4G for Zamtel sites, and GRZ Project.
DN/MR sorting, Equipment collection from warehouse and deployment to teams in the field.
Installation of Huawei 2G, 3G & LTE-4G Wireless and microwave Transmission and all power Related works
Updating progress reports on ISDP and group of material collection, deployment and installation in the in the field.
Attending to emergence.
eNode-B roll-out and Site acceptance,
Responsible for technical solutions and delivery approach of new initiatives.
Conduct RF walk testing for Site evaluation &Post integration testing to ensure Optimal Site performance.
Evaluation &design of special coverage solutions such as Solar power solutions, Power consumption for small repeaters or Active/Passive DAS systems.
Interface with planning & Operations team for impact analysis & defining RAN &connectivity required work packages and approach for specific activities,
Attend site surveys to scope proposed required locations, Cable routes and equipment placements etc.
Managing 3rd party Vendors & partners to meet network roll-out objectives and sharing status of all outstanding issues.
Project planning, Field Implementation and evaluations.
Project implementation- Supervising Installations of all networking and telecommunication equipment.
Managing, monitoring and maintaining company’s IT infrastructure
Supervising Technicians/Riggers &preparing real time field reports in order to meet and Track Project’s KPIs
Ensuring quality workman ship, Engineering standards and safety are maintained during Project implementation. Preparation of Site acceptances.
Projects Worked On
2017
2016
2015
2014
2012 / RF Single Site Verification (SSV), Drive Tests and Optimization for 2G, 3G and LTE-4G for Zamtel/GRZ sites. Tools used, Genex probe, Assistant, Genex cloud and Mapinfor
Single Site Verification (SSV), Physical site Audit and Optimization Ericsson 2G,3G &LTE 4G, Airtel sites
 eNod-B Roll-out, Configurations, commissioning, Drive Tests and Optimization. Site inspection and acceptance Vodafone Zambia.
Nokia Single IP RAN Modernization Installations Copper Belt Region.
NEC microwave Point-to-Multipoint enterprise link installation, Configuration and Commissioning
Ericsson Radio recovery, DCN Planning and rerouting, OSPF Configurations on Airtel Networks
Airtel RAN Modernization Ericsson 6000 series Modules, TR-RX Cell Site Network Grow/Degrow network expansion for Airtel Networks, (Nokia Siemens BTS, Flexi and 6601 Ericsson BTS Modules)
Ericsson BSC installation, power termination and commissioning,
Site Interventions, Preventive &Corrective maintenance under Exceed Communications Limited on 275 Airtel Cell Sites.
Installation of Ericsson Charging Nodes Voucher Server, Cisco Switches (MPBN).
OSS Installation (Oracle servers) on Airtel’s Core network.
 Microwave Installations, Alignment, Configurations, sweep tests, script software uploading & commissioning of 40 BTS sites for Zamtel. (ZTE-NEC)
Generator Installations &commissioning on 34 MTN Sites.
Navigation light Installation for Airtel Towers.
Deep-cycle Battery backup Installations in 54 BTS-MTN Sites.
April 2011 To, 2012 / Zambezi Airlines. / Avionics trainee Engineer (Intern) / Routine &Non routine Avionics maintenance &repair on Boeing 737-500 series.
Nav lights, Comm systems, two way Radios, Power supply. Instruments. General Electrical
C checks on Avionics equipment

INTERESTS AND HOBBIES

ICT Innovations and Soccer.

ATTRIBUTES

Team player, goal oriented, Assertive, Innovative and adaptive

Able to work with minimum supervision within specified terms of reference

LANGUAGE ABILITIES

English, Bemba, Lenje and Tonga

REFEREES

  1. Mr Arthur Mukandawire

Power Systems Engineer

Airtel Networks Zambia

Mobile Phone: +260 978980074

  1. Mr Mwangana

Vice Principal, P.O BOX 310198, Mobile Phone: +260 97860761

Zambia Air Services Training Institute (ZASTI)

  1. Rev. Bishop L Chibuye

United Church Of Zambia, E-mail

P.O. Box 50035 Ridgeway, Lusaka. Phone; +26 0977795239