CURRICULUM VITAE

STEFAN BADIU

BUCHAREST, E-mail: ROMANIA Tel: (+40)722935011

MECHANICAL/PIPELINE PIPING SYSTEMS

DESIGN/ENGINEERING/CONSTRUCTION SUPERVISION, COMMISSIONING, START-UP

KEY QUALIFICATIONS

Exceptional range of international experience covering design, site on Equipment and Piping Erection for Refineries, Petrochemical Works, Flow Station, Oil Terminal, Power Plant, Pipelines, Flow lines, Well Head.

EDUCATION AND PROFESSIONAL STATUS

Polytechnic Institute Bucharest Transport Faculty - (graduated 1965 MS)

EXPERIENCE RECORD:

40 years as mechanical piping engineer in petroleum industry:

2008 – 2010 - Romanian Engineering and Design Institute for Oil Refineries(I P I P) -Ploiesti ,Romania:Senior Mechanical Piping Engineer Coordinator OSBL(offsite units block=6Tanks Farm ,4Pumps Station, 2Loading Racks,1Km Pipes Rack, Flare Unit and Piping System, Inlet Manifold, and all facilities of outside block units) for <Kurdistan Refinery Project –Iraq >

- Romanian Engineering and Design Institute for Oil Refineries (I P I P )-Ploiesti ,Romania: Principal Piping Engineer for< Piping connection project for Pipe Rack(3,5 Km) for BIODIESEL FACTORY>-Slobozia-Romania.

(2007-2008) -Lead Piping Engineer with Browning& Henderson Int. Ltd-UK and FODE (Field/ Offshore Design Engineering) Nigeria Ltd. ,for EES Project(Escravos Export System Project) of CNL (Chevrom National Ltd . Nigeria) : 30 in.-40 Km Subsea Pipeline and Facilities(Pigging System ; PLEM-Pipeline End Manifold; SBM-Single Buoy Moorings ). Erection Equipment & Piping connection (Launcher and Receiver,Tie-ins in Escravos Terminal) and Subsea PLEM ; SBM ) . FEED Project.

2007- Mechanical piping design engineer for PETROCONSULT PLOIESTI ROMANIA

with AIR PRODUCT AS NORWAY for detail design of NH3/H2 Recovery Unit (unit

for Petrokemija Croatia)

2006- VETCO Aibel Nigeria – Lead Design mechanical engineer for Abang ,Oyot and

Itut offshore new platforms. (Client EXXON MOBIL)

2004-2005 : DONG-AH Company Libya .Design of irrigation system.(pump stations, water

Pipelines, and facilities)

1998 to 2004: ILF CONSULTING ENGINEERS NIGERIA (Branch of German Co.)

2004 For NIGERIA LIQUEFACTION NATURAL GAS COMPANY

- Independent valuation expert for Nigeria LNG for transfer “OGGS (Offshore Gas Gathering System) Slug Catcher and Facilities“ from SPDC (Shell Petroleum Development Company) to NLNG (Bonny Island - Nigeria), tie back experience.

2003- 2004: For SHELL PETROLEUM DEVELOPMENT COMPANY OF NIGERIA LTD

  • Independent Assessment of additional works at Bonny Terminal Tank Farm, Booster Pumps Stations, Refurbish for on/ offshore storage facilities.

BOQ & Cost for piping, List of equipment & Assessment for all required areas in according with detail design or conceptual design (P & ID, PFS, PEFS) of HHI in basis estimated prices for equipment and compound prices for piping (from addition of prices for procurement fabrication isometrical, mounting, testing, painting) for each size or material per meter or piece. Analyze of price per areas, specialties, milestone, cost impact between ITT and Additional or for deleted equipment and piping.

For TOTAL FINA ELF:

- Mounting corrosion inhibitor pumps and piping connections for Ibewa L1 Well and pipe connection Flowline.

For PIPELINES AND PRODUCTS MARKETING COMPANY LTD.:

- Rehabitation of Escravos import Berth Platform (IPB) and Tank Farm facilities (Phase 1) with pipeline onshore & offshore.

2002:For NAOC-AGIP:-

- Samabri Biseni Field cluster 2-Piping connections at Well Head, Test and Production Manifold with Pig Trap.

-Samabri Biseni: Power Plant (3 Generators 1000KVA-mounting equipment and pipe connections.)

For EXXON-MOBIL COMPANY- QUA IBOE OIL TERMINAL:

- Mounting Air Compressors on INIM Platform- offshore

- Revamp Platform offshore, mounting equipment and pipes -typical project.

For TOTAL FINA ELF:

-Flow lines between Ibewa L1, L2 Well and Obagi F/S- (inclusive of pipe connection in manifold F/S and Well Head Ibewa, under crossing roads and pipelines, calculation of flow lines).

2001:For SHELL PETROLEUM COMPANY OF NIGERIA LTD:

-Engineering study of Bonny Terminal-Sludge Treatment Plant “. (Up-date of 2 existing Train: Tank Farm, Pump Station, Filter System, Heaters, Fuel Gas System, Separators, Metering Station; checking existing equipment for Train 3, Engineering Study for implement Train 3)

For TOTAL FINA ELF NIGERIA LTD.:

-Engineering design, studies and procurement services for the Okpoko

OML 57, Flow Station Revamp” (Equipment and piping erection for 2 OFFSHORE Platform with Pump Expedition System and connection at

pipelines by pig launcher, 2 Gas Generation, 1 Diesel Generation, Diesel Fire Fighting Pump, Air Compressors and auxiliaries: 5 Vessels, Gas Scrubber, Air Receiver and Lifting Devices, Pipe Racks between Platforms and land zone).

2000: For SHELL NIGERIA GAS LIMITED:

-Engineering Design for Gas Distribution pipeline project at Aba Phase II and Agbara - Ota Conceptual Design (2 Pressure Reduction and Metering Stations, 1Custody Transfer Station, 14 Customer Stations, 3 Pig Traps.)

For SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA LTD.:

-Engineering Design for Electrification scheme for Egbemo-Angalabiri and Agbidiama Communities.

-OPUKUSHI Flow Station. New Gas Generation Plant” (Process of Mechanical Parts for: 3 Gas Generators and auxiliaries-2 Vessels, Gas Scrubber, Pressure Reduction, Lifting Device, and piping connection.)

1999: For SHELL PETROLEUM DEVELOPMENT COMPANY OF NIGERIA LTD.:

-Detailed Engineering Design and interconnections Pipe Network between Ughelli East and West Oil Field” (Process and Mechanical parts for: 2 Gas Pipeline with 4 Pig Trap Stations and interconnections to Flow Station and Compressors Station, also under crossing roads, river, pipelines; calculation of pipelines).

Offer for new work package.

For EXXONMOBILE COMPANY to QUA IBOE OIL TERMINAL:

-Replace the Open Drain System with Closed Drain System for to Compressors Stations.

-Technical assistance on site, during construction of the projects: Fire

Water System, Mounting Incinerator, Cathodic Protection for Offshore Pipeline

- Checking Projects for several Contractors of ExxonMobile Co

- Up- date of P&ID’s of Qua Iboe Terminal

1998For EXXONMOBILE COMPANY to QUA IBOE OIL TERMINAL

-Replace underground Instrument Air System with above ground system

-Design a New Tanks Farm and connection to Pump Station and Meters Station for Jet Fuel to Helicopter Base

- Power plant (5 diesel generator of 1000 KVA): equipment and piping

mounting, including tank farm, unloading station, pumping station,

day tanks

1966-1998 FOR ROMANIAN ENGINEERING AND DESIGN INSTITUTE FOR OIL RAFINERIES (IPIP) - PLOIESTI; ROMANIA.

Responsibilities: Mechanical Designer Engineer at Mounting Equipment at Piping Department.

Achievements: Detailed Design for Transformation, Modernization, Enlargement of Capacity Units, as well as Detail Design for Mounting Equipment and Piping of New Processing Refineries Units for example:

-Atmosphere Distribution Unit

-Aromatic extraction Unit

-Xyleni Fractionating Unit

-Electrical Crude Desalting Unit

-MTBE Unit

-Flare Unit

-Petroleum and Petrochemical Products Loading and Unloading Rack

-Pipe Racks (4-5 levels, length 5-6km for products and utilities pipes in top with flare pipes of 48“, 56”).

-LPG Loading in Gas Bottlers

-Deposits for Petroleum and Petrochemicals Products (with Tanks Farm, Pump Stations, Loading and Unloading Rack, Metering Stations. (Inclusive for LPG)

-Pipe Lines:

-Gas Transmmission-60 bar with Metering Station and Pig Stations (launcher & receiver).

-Gasoline 40 bar with Pump Station Metering Station and Pig Station (launcher & receiver).

1965-1966BRAZI RAFINERY- PLOIESTIRomania

Responsibilities: Mechanical Engineer at Mechanical Work Shop and Inspection Department.

Achievements: Work activity for Inspection Revision, Repairs, Maintenance of Process Units and auxiliary.

1959-1965IPIP PloiestiRomania

Responsibilities: Mechanical Project Designer in Equipment and Piping Erection Department.

Achievements: Detail design for Process Units, Tank Farms, Pump Stations, Pipe Racks and Details for Equipment (vessels, columns, heaters, heat exchangers etc)

1958-1959Shop Design Buhusi-Romania Mechanical Project Designer-spare parts, for Textile Industry

LANGUAGES:Romanian - mother language

English

TO CONCLUDE: 40 years experience as Mechanical Piping Engineer in Oil/Petroleum Industry in design, technical assistance, supervising, commissioning, start-up in

Romania (at 4 Petrochemical and Refineries Complex) and in

abroad (Syria, Turkey, Libya, Nigeria). Good knowledge of America

technical Code and Standards (ASME B31.2,3,4,8., API 1104, DEP

SHELL, ELF, AGIP, EXXON MOBIL, NLNG) Computation and

optimization by Computer diversity Systems of Piping.

PERSONAL: Romanian, Married, Extremely Fit; d.o.b.26.08.1935; non-smoker; good health.

Romanian driving licence

Interest include sports, cinema.

SHORT DESCRIPTION OF MY SKILLS AND YEARS OF EXPERIENCE:

- Piping Mechanical design engineer ……………………………………39 years;

- Mechanical engineering………………………………………………...30 years;

- Pipeline Mechanical design engineering……………………………….12 years;

- Refinery Units, Gas Plant, Petrochemical works design engineering….32 years;

- Oil Terminals, Flow Stations mechanical design engineering…………..10 years;

- Storage Tank Farms, Pump Stations and facilities mechanical design engineering…………………………………………………………….39 years;

- Facility Platforms Offshore mechanical design engineering ……….……8 years;

- Power Plants mechanical design engineering…………………………….6 years;

- Mechanical Engineer for Supervising, Testing, Commissioning, Start-Up for Equipment/Pipelines/Piping Erection in oil and gas, On/Offshore and Units of Refineries/Gas plant/Petrochemical Works………………………….. 15 years;

- Cost Estimator engineer…………………………………………………..7 years;

-Experience in abroad (Africa/Middle East)……………………………….10years.

1

BADIU