BKAB, FKAB, OKG AB, RAB, SKB, TVO

REPORT FOR ANTI-CORROSION PAINTING

/ Form No: /

D.100

Page: / 1 of 2
Issued: / 020121
Rev: / 131231
Report No: / Part of I-plan No: / Sign:
Radiation-
class
Room-
category / Painting-
Class / PLANT: / SECTION OF PLANT:
SYSTEM: / COMPONENT: / DRAW:
TYPE-DRAW NO: / TYPE NR: / Non Conformity Report
No:
FINAL REPORT / INTERIM REPORT / INSPECTION
ITEM NO:
Product Supplier: / Order No: / Treatment/coulor:
Paint-work Contractor: / Order No:
Report concerns treatment:
before assembly after assembly / Report concerns treatment of
indoor surface outdoor surface
THE REPORT COVERS INSPECTION OF / Surface before pretreatm. / Maintenance painting
Pre-treatment / First painting Priming / Middlecoat Topcoat Repainting
Touch-up paint
Other inspection
Special inspection
Rust grades of steel surface according to SS-EN ISO 8501-1:2007, edition.2 / A B C D
Damage on metal surface:
Necessary corrective actions:
PRE-TREATMENT / Airtemp / Rel. Air humidity
Workroom / °C / %RH
Nuggets, spatters, slag, other disparities on surface, on and around welds removed.
Sharp edges and grades removed approved grade of cut edge
METHOD OF CLEANING / Cleaning medium
Pickling Degreasing with organic solvent
Emulsion degreasing Degreasing with alkaline aqueous solution / Chloride content after blasting
acc. to SS-EN ISO 8502-9 1) / mg/m2
Preparation grades acc. to SS-EN ISO 8501-1:2007 Sa 2 ½ Sa 3 Surface temp during blasting / °C
Ejector vacuum cleaner Other method for dust removal:
Surface roughness acc. to SS-EN ISO 8503-2/G Fine Medium Coarse >Coarse
Abrasive type: / Supplier: / Dewpoint during blasting / °C
Abrasive designation: / Blasting: Start Date / Time / Finished Date / Time
Pre-treatment approved / Datum: / Name:
Notes:
1)  Documentation of test result is only required if the inspection plan and/or painting specification
has this requirement

BKAB, FKAB, OKG AB, RAB, SKB, TVO

REPORT FOR ANTI-CORROSIVE PAINTING

/ Form No: /

D.100

Page: / 2 of 2
Issued: / 020121
Rev: / 131231
Report No: / Part of I-plan No: / Sign:
Time/Environment/
Material / Priming, middle and topcoat
Layer 1 / Layer 2 / Layer 3 / Layer 4
Working-place / Workroom
Air temp/Rel. humidity / °C / %RH / °C / %RH / °C / %RH / °C / %RH
Surface temp/ Dewpoint / °C / °C / °C / °C / °C / °C / °C / °C
Paint materials / PAINT
Manufacturer
Article No
Manufactures batch No
HARDENER
Article No
Manufactures batch No
THINNER
Article No
Volume-% of paint-proportion
Mixing Ratio
Volume Weight
(Acc to note 1) / Base / Hardener / Base / Hardener / Base / Hardener / Base / Hardener
Hardener added / Date / Time / Date / Time / Date / Time / Date / Time
Paint used until / Date / Time / Date / Time / Date / Time / Date / Time
Method of appl. (Acc. to note 2)
Coat thickness acc. to SS-ISO 19840:2012, edition 2 Annex A and B, mm / Max / Min / Means / Max / Min / Means / Max / Min / Means / Max / Min / Means
Painting commenced / Date / Time / Date / Time / Date / Time / Date / Time
Painting completed / Date / Time / Date / Time / Date / Time / Date / Time
Hardening / workroom
Airtemp/Rel. humidity / °C / %RH / °C / %RH / °C / %RH / °C / %RH
Time from / Date / Time / Date / Time / Date / Time / Date / Time
Until / Date / Time / Date / Time / Date / Time / Date / Time
Correctness of above given documentation clarified / Approved
Date: / Name: / Date: / Name:
Arrival-inspection / Eventually transport damages / Inspection of approved documentation
Approved
Date: / Name: / Approved by
Date: / Name:
Action required in case of deviation, misc. Inspections and notes
Action approved / Date: / Name:
Note 1. For zincsilicate paints the following procedure shall be applied
a. The mixing ratio shall be informed in parts weight
b. The number of parts of weight by zinc powder shall be given under the heading “HARDENER”
c. The point of time at which the zinc powder is added to the binder medium is to be given under the heading “HARDENER ADDED”
Note 2. Method of application shall be given with: P=brush, R=roller, S=spray, SH=high-pressure air-free spray