ARMAKLEEN CLEANING EVALUATION FORM
For Tech Center Use:
TSR#______
Date Submitted:
Customer Name:
cUSTOMER NUMBER:
SK Representative:
SK Representative Email:
SK Branch (Name):
SK Branch Phone #:
SK Branch Address:
Customer Objective:(check all that apply. Do not write in “clean the parts” as an objective)
Improve their cleaning performance / Reduce their cleaning costsAutomate their cleaning process / Eliminate hazardous chemical/waste
Reduce rework and reject rate / Recover scrap parts
Clean mixed metals together / Reduce VOCs
Other (describe)
Maximum allowable time to clean part:(Time indicated below will NOT be exceeded in cleaning tests)
Up to 15 minutes / 15 – 30 minutes / 30 minutes – 1 hour / 1 – 2 hours2 – 4 hours / 4 – 8 hours / 8 – 24 hours / More than 24 hours (specify):
Service type:
EAC / COMS / Armakleen Direct / Other:Substrate:(check all that apply)
Steel/Iron / Stainless Steel / Aluminum / Copper/BrassGlass / Plastic / Other (describe)
Soil(s) to be removed:(check all that apply)
NOTE: If multiple soils are used, please identify the part(s) with the type of soil in Comments Section.
Shop dirt / Grime / Drawing lube / Baked on carbonOil / Cutting fluids / Grease / Rust/oxides
Glue/adhesive / Silicone / Wax / Asphalt
Other soil (describe)
Epoxy E-Coat Paint / Epoxy Powder Coat Paint / Polyester Powder Coat Paint
Acrylic Powder Coat Paint / Hybrid Powder Coat Paint / Liquid Alkyd Paint
Liquid Polyester Paint / Liquid Acrylic Paint / Liquid Urethane Paint
Liquid Epoxy Paint / Other paint
Flexographic ink / Lithographic ink / Soy-based ink
Gravure ink / UV ink / Screen ink
Water-based ink / Other ink
Number of parts cleaned/day:
1-5 / 5-50 / 50-200 / 200 +Size and shape of parts:(check all that apply)
Small (nuts, bolts) / Midsize (pistons) / Large (engine block) / X-Large (truck cab)Degree of cleanliness needed:
Clean (general maintenance) / Very Clean (machined parts) / Ultra Clean (precision parts)Current process:(check all that apply)
Manual / Manual Soak (like Model 91) / Automated SoakAutomated Spray / In-Line Spray / Ultrasonic
Hand-held Pressure Wash / Steam Clean / Vibratory Drum/Barrel
Burn-Off oven / Outside stripping service / Scrap parts
Abrasive Blast (describe type)
Fill-in completely for the current process:(use the example below as a guide)
Step 1 / Step 2 / Step 3 / Step 4Describe Process:
Product used:
Concentration:
Temperature:
Contact time:
Spray Pressure:
Example:
Step 1 / Step 2 / Step 3 / Step 4Describe Process / Clean / Rinse / RP Rinse
Product used / ABC Co. X50 / Fresh water / ABC Co. RP-3
Concentration / 5%/vol / overflowing / 3%/vol
Temperature / 160F / ambient / 140F
Contact time / 3 minute / 1 minute / 1 minute
Spray Pressure / 50 psi / 15 psi / 15 psi
Comments & Miscellaneous Process Information: (Please describe any additional process information in this section)
Current Restrictions:
VOCs / pH / Phosphates / SilicatesResidues / Other (explain)
Does the customer need to meet any specifications?
ASTM # / Military # / Aerospace #Automotive # / Other (describe)
If six (6) parts are not provided, can Armakleen cut part(s) furnished into sections in order to have the required number of parts for testing?
Yes / No**Email this completed form to: end a minimum of 6 parts to Rocky Hill with this form. If the parts are large please have the customer cut the parts into smaller representative pieces if possible.
Rev: 03/05/2014