MUHAMAD NURBUDIYANTO

Senior Project and Business Development Engineer

Present Address : TOKO MAJU BERSAMA,

Jalan Raya Bumiayu 224 Bumiayu Brebes Jawa Tengah

INDONESIA, Post Code : 52273

MobilePhone:+6285747706003, +628111831741, +62-289-430364

Email : ,


Oil/Gas Project Engineering Experience :total21 years experiences in the Onshore-Offshore, FPSO, and Fix Jacket Platform E&I Project Engineering Management Team, initially involving from design Engineering, Construction Engineering Management, TBE ( Technical Bid Evaluation ) Procurement, Yard Fabrication, Yard Construction, Yard Installation, Offshore Installation, Testing Calibration until Pre-Commissioning and start-up Commissioning, As Built Drawings, Final Document, including Maintenance Engineering Management

Oil/Gas Business Development Experience : preparing the Business planning, Business target, Business Look ahead, Business Schedule , Review and analyze, strategy, than reported to General Project Control Manager including

-

-Liaise Inter-department ; Drilling, Production, Maintenance, Well Service, Project, Engineering, Marketing

-Liaise with BP MIGAS, concerning to AFE, CAPEX,COMEX, Progress Report Presentation,

-Liaise with Third Party concerning to the Certifications

Motivation

Goal Oriented to increase company profit and assets thru build a good team player in the Project Management Team to do running and delivering the project & Services meet to High HSE quality, High Project Quality, On time Schedule, Target Achievement, High Productivity , get an approval and Platform Certification from the third parties : BP MIGAS, MIGAS, MWS, SUCOFINDO, Government Marine Agency, etc.

Oil & Gas Offshore/Onshore Experiences: 10 Years

Petrochemical, Chemical Experiences: 8 Years

Power Plant, Experience: 3 Years

Training:

  1. Contract Management Training, conducted by Total EP Indonesie
  2. Key Performance Measurement, Index, and Analysis, by Total EP Indonesie
  3. Cross Tree Analysis, by third party of Total EP Indonesie
  4. FMEA ( Failure Module Effect Analysis), RCA (Root Cause Analysis ) Training by third party of Total Indonesie
  5. Logistic, export, import Management Training, conducted by TrisaktiUniversity
  6. HSE Management Training conducted by Total EP Indonesie, Al Suwaidi Industrial Services

Achievement :

We have been delivered 5 set platforms Total EP Indonesie from design, Procurement, yard fabrication, yard construction, offshore installation, testing commissioning until startup, and including maintenance engineering, with on time schedule , high quality, high production, high HSE quality, Zero Accident, zero LTI.

Curriculum Vitae of Muhammad Nur Budiyanto

FORMAL EDUCATION

Bachelor Degree of Science, Physics Engineering

Concentration in Instrumentation SystemControl

Engineering, GadjahMadaUniversity, Yogyakarta

INDONESIA 1988

Place / Date of birth: Brebes, 14 January 1964

Indonesia Passport No: AK 989483

Curriculum Vitae of Muhammad Nur Budiyanto

PROFESSIONAL SKILL:

Understand, familiar with Oil/Gas Business Development Management

Understand, familiar with Microsoft Project, Primavera, Excel, Word, VBA, SQL Server, Access, Database, Power point

Understand and experience to the Electrical, Instrumentation, Telecommunication including ESD, PCS, SSS, X-mass Tree, WHCP etc

Understand and experience to the Project, Construction, Maintenance Management. including Planning, Scheduling, S-Curve, Job Sequences, Progressing, Organization charts, Manpower allocation plan, Equipment and tools Allocation plan, etc.

PROFESSIONAL EXPERIENCES

2009 – present, TOTAL Exploration & Production Indonesie ( Contract Basic ) ( )

Total E&P Indonesie is Oil and Gas Company in indonesia

Current Position : Senior Project Engineering and Business Development

Project Name :

  1. TUNU TP 12 – 3 Set Gathering Testing Satellite Platforms GTS Nx, Fx, Bx,
  1. TUNU TP 13A –2 Set Gathering Testing Satellite Platforms GTS Gx, Mx,

Scope of Work :

Monitoring, Reviewing, Checking, Controlling, Supervising, and advising of on-shore, off-shore EPSC Contractors activities than reporting to Project Manager Including :

  1. Procurement Monitoring Status
  2. Expediting Monitoring Status
  3. Engineering Monitoring Status
  4. Documentation Monitoring Status
  5. Logistics, Material, Shipping Notice Status
  6. Construction Material Monitoring Status
  7. Planning, Schedule, progress status ( Fabrication, Installation, Testing Commissioning)
  8. Planning, Schedule, progress status ( NDT, Hydro testing, Flushing, Calibration etc
  9. Planning, Schedule, Progress Status for Third Party Certification / Inspection
  10. Planning, Schedule, Progress Status of FAT, SAT, Inspection and Certification
  11. Planning, Schedule, progressing Status for Punch List Clearance
  12. Marine Spread Monitoring status
  13. Man-Power, Tools and equipment mob and demobilization, and allocation Planning, Schedule
  14. On-shore, Off-shore Job Sequences
  15. Fabrication, Installation, Testing Daily activity Reports
  16. Daily, Weekly, Monthly Progress Report
  17. Pre-Commissioning, and Commissioning Status
  18. PTR ( Project Technical Review ) Monitoring Status
  19. Commissioning and two years operation spare parts
  20. Liaise with Drilling Schedule and Production Schedule
  21. Final Documentation Status

Liaise and close communication with Drilling Department, FO ( Field Operation Department), Maintenance Department, Engineering Department, Marine Department, HSE Department

Liaise and Manage with Third Party regarding to Certification Authority Agency, Inspection Authority Agency, MWS ( Marine Warranty Surveyor ) , MIGAS ( Government Oil & Gas Authority Agency ) , NDE /NDT Agency, Testing Authority Agency. etc

Liaise with Vendor Supplier regarding to FAT, SAT, Commissioning and start-up

Reviewing , checking all reports from EPSC contractors than make preparation comprehensive report to Company Project Manager

Reviewing, Identifying all probability problems and immediately raise the solutions.

Fully understand the contract agreement including scope of work between EPSC Contractors and Company,

Reviewing, Checking, all document engineering from EPSC Contractors ; Drawings, Vendor Documents, Procedures, Site Query, Technical Query etc.

Reviewing, checking all possibilities concerning to the Additional works raised, related to the contract, scope of works, schedule, document, engineering and measurement..

Close communication and liaise with third party : PT. Sucofindo, PT. Marindotech to get construction approval certificates,

Close communication and liaise with MIGAS, to get Safety Approval Certificate

Close communication and liaise with BP MIGAS , to get certificates : SKKI, SKKP, SKKAP, SKKTetc

Close communication and liaise with Marine Warranty Surveyor , PT, Nobel Denton to get Sail Out, and Platform installation Certificate

Close Communication and liaise with BKI, BPPT, LIPI, to get approval certificate such as, Lifting Equipment, Electrical Equipment, Instrument Equipment. etc.

Close communication and liaise with Rig Company man Drilling Division and drilling Contractor to get planning synergy between platform, and drilling, Rig Schedule, Shallow Schedule, Preservation Schedule etc

Close communication and liaise with Halliburton and close monitoring during system leak testing including certification

Close communication and liaise with other division ; Seismic Div, Survey Div, HSE Div,Maintenance Div, Production Div, Business Development Div, Project Div, Engineering Div, CST Well Div, MTH Div to get comprehensive planning, on ( Regular monthly coordination meeting )

Helping Business Development to get another opportunity include expanding block area etc with close communication with BP MIGAS.

Close communication with Survey and seismic contractor ; Elnusa to get information pertaining to the current location where they are doing.

Close communication and liaise with government marine agency at balikpapan to get the informations concerning to the certificate, safety marine etc.

Giving information to BD div concerning to Oil Gas demand supply, market, competitors, project expansion, etc

Participating to technical reviewing, checking, all bidders for next project including Basic Design contractor, EPSC contractor, third party inspection company etc for next project.

Evaluating all current contractors ( EPSC ) TP12 and TP 13A Project including vendor supplier,thru making summary close out report

Making Presentation, and Attending the meeting with BP MIGAS ( Monthly progress ) concerning to the projectprogress Development

Monitoring, review and checking Project scrap material including local content, import content and reported to BP MIGAS

Preparing HO ( Hand Over Certificate ) for 5 sets platforms.

Preparing, Project Close Out Report including Engineering, Procurement, Fabrication, Installation, Commissioning start-up.

2007 – 2009 , Al Suwaidi Industrial Services (SIS), KSA Saudi Arabia ( )

Al-Suwaidi Industrial Services is EPC and Maintenance Company, majoring in the Oil & Gas Onshore/Offshore, Petrochemical, Chemical, and Refinery.

Work Email :

Position: Electrical & InstrumentationConstruction Manager ( Project Management Team )

Project :

  1. NGL ( Natural Gas Liquid )-Aramco Yanbu Saudi Arabia
  2. Yanbu Refinery – Aramco Fire and Gas Detection System, Saudi Arabia
  3. Sabic Polycarbonate Complex ( Saudi Basic Industries ) Jubail Saudi Arabia
  4. Al-Haradh FPSO-Aramco Saudi Arabia

Scope of Work :

Experience in the Project Management Team Responsible for overall management of projects Construction and Maintenance from conception to completion, and making, creating including implementing of a new IT system based on Data Base, VBA, and SQL Server for Electrical and Instrumentation including Fire & gas Detection System, Data and Telephone Communication System , Paging System ,CIMS( Construction Information Management System), MIMS( Maintenance Information Management System) to each project.

In the CIMS, MIMS gives detail information’s ; Technical Data Specifications, Drawing No, Process Data Sheets, Detail Locations, Plant Area, Plant Elevation, Equipment Manufactures, Equipment Models, Standard Operation & Procedures, Testing and Calibration Schedules, Planning’s, Recommended Spare parts, Tool, Tester and Calibrator, Calibrator Validity, Maintenance Manual, Turn Around Shutdown Schedule, Panel & Junction Box-Cable Connection List, Engineering Standard, Material Standard, Quality Control Check List, Safety Standard Operation Procedures etc.

Manage, Control, Supervision, and monitor of overall E&I Construction and Maintenance activities, Including Productivity, Progressing, Planning, Target thru CIMS, MIMS.

Computer Skill :

Microsoft Project, Excel, Word, VBA, SQL Server, Access, Database, Power point.

1998 – 2007 PT. NABICON - HONEYWELL Instrument Project & Service Management

SCOPE OF WORKS :

Responsible for overall management of projects from conception to completion, with creating new system based on VBA, SQL and Database E&I CIMS (Construction Information Management System), MIMS (Maintenance Information Management System)

As part of Project Management Team ( Construction & Maintenance ), and ensure project team have a clear understanding of contract and scope of work.

Ensure all operation are undertaken in a safe manner in accordance with law and company policy

Manage, Control, Direction, Supervision and co-ordination to Engineering Department. for L V Electrical and Instrumentation Engineering including : Basic- Design System Engineering, Construction Engineering and Maintenance Engineering.

Manage, Control, Direction and Review of overall project activities; scheduling, progressing, planning, milestone, targets, Man powers, Project cash flow, Project invoices, implementation, Cost-budgets.

Manage, Control and Review all Service activities ( Annual Maintenance Contract, Maintenance and Calibration works during Plant shutdown Schedule, etc ) including cost- budget, planning, man powers, Implementation and quality of services.

Responsible to resource strategy to meet company effective and optimal team to run the projects and services / maintenances.

Assist in Preparation to Bid Proposal including Technical and Commercial, Quotation for maintenance, calibration / testing and annual contracts.

.Responsible to provide the Professional Instrument Service Engineers and or Instrument Technicians to the customers

PROJECT EXPERIENCES during joined with PT. NABICON : ( Instrumentation Works )

  • 2007 - PDAM, 120 km Pipe Line 10”-14” , SCADA System
  • 2007 - Kujang Fertilizer Plant - 4
  • 2007 - Cilacap Pertamina Oil and Gas Refinery Optimization / revamping project
  • 2006 - Palembang Pertamina Oil and Gas Refinery Optimization / revamping project
  • 2005 - Balikpapan Pertamina Oil and gas Refinery Optimization / revamping project
  • 2004 - PTA& polymer Petrochemical Plant
  • 2003 – Amoco Merak Polyethelene and Polyprophelene Plant
  • 2001 – Tanjung Jati PLN Electrical power plant Combine Cycle type
  • 2000 – TranspasificPetrochemical(Postponed)

Nabicon Yokogawa :

  • 1998 - Balongan Pertamina Oil & Gas Exxor-1, Truck loading system, Pipe line system, Terminal automation system.
  • 1998 – Muara karang Power Plant Combine Cycle

1988 – 1998 Joined with PT. FOXBORO PERKIND as Senior Instrument Engineer

SCOPE OF WORKS :

Preparation of Bid Document, overall project cost estimations.

Preparation of design engineering, System Engineering, Construction Engineering, Project Engineering

Preparation of calibration sheets, Testing sheets, and commissioning reports

Supervision and coordination with Instrument Technicians during calibration works, testing works, loop testing.

Supervision and coordination with Instrument supervisors regarding to Erection works, installation hook up.

Establishment and responsibility for project communications with client, sub contractors.

Development and review project planning, Progressing, Reporting, Targeting, Scheduling.

Preparation of quotation for maintenance, calibration / testing and service annual contracts

PROJECT EXPERIENCES during joined with PT. FOXBORO PERKIND :( Instrumentat Works)

  • 1998 - Cilacap Pertamina oil & gas refinery Plant -I, revamping project
  • 1997 - Balikpapan Pertamina oil & gas refinery Plant – I, revamping project
  • 1994 – Balongan Pertamina Exxor-1 oil gas refinery Metering & Filling Station, revamping project
  • 1993 – Palembang Pertamina oil & gas development Plant I-II, revamping project
  • 1992 - Palembang fertilizer Plant
  • 1991 - Bontang Fertilizer Plant, revamping project
  • 1990 – Bontang LNG Metering system , Revamping project
  • I990 - Indah Kiat pulp & Paper Plant
  • 1988 - Chandra Asri Petrochemical Plant
  • And Small Project & Services

Technical Skills :

  • Experience and familiar to the Project Management : Scheduling, Planning, Cost Budgeting and Progressing.

Experience and familiar to the Instrumentation Design Engineering, Project / Construction Engineering.

Experience and familiar to the Instrumentation System Design Engineering : Program Ladder Logic / PLC, Pipe Line SCADA System, RTU, .Oil and Gas Metering System, ESD- Emergency Shut Down System, Tank Gauging System / Terminal Management System, Oil & Gas filling Station system.

Experience and familiar to the Instrumentation Hardwares : Transmitters, PLC, Calibrators, ( Foxboro, Honeywell, Fisher Rosemount, Yokogawa, Allen Bradley, Siemens, GE Fanuc, Oval, Varec )

Curriculum Vitae of Muhammad Nur Budiyanto