Global Project Opportunities: June’ 2015

June: 2015

Compiled by

Satpreet Kaur

PROJECT EXPORTS PROMOTION COUNCIL OF INDIA

(Set up by Ministry of Commerce & Industry, Government of India)

1112 Arunachal Building, 19 Barakhamba Road, New Delhi-110001

Tel.:+91-11-41563287, 41514673

E-mail : Web-site : www.projectexports.com

INDEX
1.0 FOCUS 3
2.0 PROJECT OPPORTUNITIES (Construction/Turnkey/Consultancy) : list of projects 5
2.1 Construction / Turnkey
Water 4
Social Infrastructure 19
Energy 29
Consultancy 36
3.0 PROJECT REPORTS 38
4.0 WORLD DEVELOPMENT NEWS: 42
I News Clippings

II Market/Country news

A. World Region / markets
(a)  Asia
(b)  Africa
(c)  Middle East
(d)  Others
B. India news
5.0 ARTICLES OF INTEREST 52 / 6.0  FORTHCOMING EVENTS : 55
(i)  Fairs/Exhibitions
(ii)  Business Delegations
(iii)  Symposia/ Conferences/Training Programmes
7.0 POLICY & PROCEDURES 61
8.0 COUNTRY PROFILE: SUDAN 68
9.0 PROJECT CONSTRUCTION ITEMS 69
10.0  PEPC: WORKING COMMITTEE 81
11.0  Update 83
12.0 EXPORT PROMOTION SCHEME 86
13.0 Financial Assistance 87
(MDA & MAI Schemes)
ANNEXURES:
i. MDA Scheme
ii. MAI Scheme
iii. Screening Committee- Guidelines
14.0 Sources of Information 90

The news items and information published herein have been collected from various sources, which are considered to be reliable. While every care has been taken for authenticity of the material published, PROJECT EPC accepts no responsibility for authenticity or accuracy of such items

PROJECTS OPPORTUNITIES
(Construciton/Turnkey/Consultancy)
S.No. / Project / Country / Dead Line / Page no
WATER
Africa
ONEE Water Supply Project, Morocco / Morocco / 15 July 2015 / 4
Asia
Water Resources Development Investment Program - Project 2 / Afghanistan / 25 June 2015 / 6
Water Supply and Sanitation Investment Program - Tranche 3 / Azerbaijan / 25 June 2015 / 7
KhWRP-009 Construction of a new water treatment plant in Isaev city / Tajikistan / 24 July 2015 / 9
KhWRP-007. Construction of pressure and gravity mains in Isaev city / Tajikistan / 20 July 2015 / 12
KhWRP-002Construction of the pressure main from water intake to reservoir in Yovon city / Tajikistan / 10 July 2015 / 14
KhWRP-001 Renovation of the existing water intake in Yovon c / Tajikistan / 05 July 2015 / 17
SOCIAL INFRASTRUCTURE
Asia
Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP) / Nepal / 05 July 2015 / 19
Osh-Batken-Isfana Road Reconstruction Project / Kyrgyzstan / 20 July 2015 / 21
Others

National Roads Programme, FYR Macedonia

/ FYR Macedonia / 23 June 2015
Moldova Road Sector Program IV / Moldova / 30 June 2015 / 24
Railways: Emergency Infrastructure Rehabilitation Project / Montengro / 07 July 2015 / 26
ENERGY
Asia
Outer Island Renewable Energy Project, Tonga / Tonga / 24 July 2015 / 29
Others

Hydro Power Plants Rehabilitation Project

/ Ukraine / 21 July2015 / 30
CONSULTANCY
Africa
Transport Facilitation and Road Upgrading Studies of the Kampala – Juba – Addis Ababa - Djibouti Corridor / Kampala – Juba – Addis Ababa - Djibouti / 30 June 2015 / 36
1.0 FOCUS

The GCC countries have the benefit of huge reserves built up as a buffer over the years, which will continue to spend on an estimated $172 billion worth of infrastructure and capital projects planned and under way in 2015

UAE’s Al Maktoum International Airport expansion, billed as the biggest airport in the world, is the first among the GCC projects by cost. The industrial project in Abu Dhabi for Tacaamol Al Gharbia Chemicals Industrial City is the second largest project.

Several billions being planned on capital projects, with the top sector for 2015 being mixed-use and residential projects

In Saudi Arabia, the largest project in pre-execution phase is the Al Mozaini-Riyadh East Sub Centre. The second largest project in pre-execution phase is Khozam Development in Jeddah.

In Qatar, the two largest projects in pre-execution phase and expected to be awarded in 2015 are from QRail, namely the QIRP: passenger and freight rail, and from QIRP, whose passenger and freight rail: phase 2.

This is followed by two projects, one for the new Qatar Economic Zone, which is one of the three new planned economic zones mainly focusing on logistics and air freight companies (expected to be the biggest of the three), and Occidental Petroleum Corporation — Idd e Shargi North Dome Expansion phase 5.

Of the total $2.8 trillion projects which are in execution and pre-execution phases, 40 per cent of the value relates to residential, leisure and hospitality buildings and mixed-use developments, totalling an anticipated budget value of $1.1 trillion, Deloitte said.

FROM “GPO” DESK

2.0 PROJECTS OPPORTUNITIES
(Construciton/Turnkey/Consultancy)
2.1 ENGINEERING /TURNKEY

water

ONEE Water Supply Project, Morocco

Project Name: / ONEE Water Supply Project
Country: / Kingdom of Morocco
Description: / Strengthening the supply of water in Benguerir and Skhour Rhamna neighbouring dam Al Massira – Lot 3: Civil Works
Funding agency: / EBRD
Last date of bid submission / 15 July 2015
Price of bidding document:
Amount of bid security: / ninety five thousand (95,000.00 DH) or its equivalent
Address for submission of bids: / Office National de l’Electricité et de l’Eau Potable – Branche Eau
(ONEE-Branche Eau)
Direction des Approvisionnements et Marchés
Division Achats Projets Eau Potable
Adresse : Bâtiment G, Station de traitement Avenue Mohammed Belhassan El Ouazzani,
Rabat - MAROC
Tél : + 212 (0) 5 37 66 72 56
Fax : +212 (0) 5 37 66 72 22

INVITATION FOR TENDERSN°22/DAM/ET/2015

This consultation concerns the works of Strengthening the supply of water in Ben Guerir and Skhour Rhamna neighbouring the dam Al Massira – Lot 3: Civil Works

This tender is for lot 3 Civil Engineering and concerns the following works:

The construction and equipment of a tank of 2 * 250 m3;

·  Construction of the local pumping (SR1-2) adjoined to the tank;

·  The construction of the closing, the development of the surroundings and the guardhouse;

·  The realization of local transformer station;

·  The supply, transport and installation of a water supply pipe of the rural population from a tap on the discharge at the exit of the SR1-2;

·  The supply, transport and installation of the connecting pipe between the existing pipe (DN600 ductile iron) and feeding the tank 2 * 250 m3;

·  The supply, transport and installation of the connecting pipe between the output of the SR1-2 and the existing pipe (DN600 ductile iron);

The Office National de l’Electricité et de l’Eau Potable, hereinafter referred to as “the Employer”, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development (the Bank) towards the cost of Strengthening the supply of water in Benguerir and Skhour Rhamna neighbouring the dam Al Massira.

Tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms from any country.

To be qualified for the award of a contract, tenderers must satisfy the following minimum criteria:

• The tenderer must have an average annual turnover of at least Ten Million five Hundred Thousand Dirhams excluding tax (10.5 million DH), which is the total of mandated payments received for on-going and / or completed contracts during the last three (03) years (2011-2012-2013).

• The minimum amount of cash and / or cash facilities (cash engagement only) net of other contractual commitments which the tenderer must have is: Two Million one Hundred Thousand Dirhams (2.1 million DH).

• Experience as principal contractor in the context of at least two (2) cases of similar work type and nature in the past five (05) years that include:

The construction and equipment of a tank or wet well with reinforced concrete for water storage capacity higher than or equal to 200 m3.

The Tender Documents (only French version) can be obtained free of charge from the tenders office of the ONEE-Branche Eau at the address below.

The same documents can be downloaded from the public procurement portal at: https://www.marchespublics.gov.ma. Plans on CD are available at the tenders office of the ONEE-Branche Eau and are part of the bidding document to obtain in order to bid.

All tenders must be accompanied by a tender security of ninety five thousand (95,000.00 DH) or its equivalent in a convertible currency.

Tenders must be delivered to the office at the address below on or before July 15, 2015 at 09 h 00 min (local time), at which time they will be opened in the presence of bidders representatives who choose to attend.

Tenders will be opened in the presence of tenderers’ representatives who choose to attend at the opening on Wednesday, July 15, 2015 at 09 h 30 min (local time) at the address below.

A project site visit is scheduled Thursday, June 18, 2015; the appointment for this visit is set at 10 hours (local time) at the center of ONEE-Branche Eau at Benguerir. It ishighly recommendedthat bidders attend this site visit.

Prospective tenderers may obtain further information from, and inspect and acquire the tender documents at, the following office:

Office National de l’Electricité et de l’Eau Potable – Branche Eau

(ONEE-Branche Eau)

Direction des Approvisionnements et Marchés

Division Achats Projets Eau Potable

Adresse : Bâtiment G, Station de traitement Avenue Mohammed Belhassan El Ouazzani,

Rabat - MAROC

Tél : + 212 (0) 5 37 66 72 56

Fax : +212 (0) 5 37 66 72 22

Water Resources Development Investment Program - Project 2

Project Name: / Water Resources Development Investment Program - Project 2
Country: / Afghanistan
Description: / Rehabilitation of Lower Kokcha Irrigation System Main Canal and Intakes
Funding agency: / Asian Development Bank (ADB)
Last date of bid submission / 25 June 2015
Amount of bid security: / as specified in the bidding document
Address for submission of bids: / Attention: Mr. Ahmad Khalid "Abdullah" Ministry of Energy and Water Street
Address: Dar-ul-Aman Road Floor/Room number: 2nd Floor
General Planning Department
City: Kabul Country: Afghanistan
Telephone: +93 (0) 789169909/ +93(0)777-238320
Electronic mail: , copy to

Invitation for Bids

1. The Government of the Islamic Republic of Afghanistan has received a Grant from the Asian Development Bank (ADB) towards the cost of Water Resources Development Investment Program Project Part of this Grant will be used for payments under the contract named above. Bidding is open to Bidders from eligible source countries of the ADB.

2. The Ministry of Energy and Water (MEW) herein referred to as “Employer” invites sealed bids (technical & price bids in separate envelopes, clearly mentioned on the first envelope as Technical Bid and the other (second) envelope as Price Bid) from eligible bidders for the execution of the Rehabilitation of Lower Kokcha Irrigation System’s Main Canal and intakes. The scope of work will include but not be limited to the following: The project area is located in Imam Shahib and Archi districts of Kunduz province and Khwoja Ghar district of Takhar province. The project objective is to upgrade the irrigation system to make it more reliable and efficient, both in terms of water use and distribution, and improve food security. The Lower Kokcha Irrigation Program includes upgrading of the existing Shahrawan irrigation system, covering 48,000 ha net command area of Zone I and rehabilitation and upgrading of the Archi Canal covering 28,000 ha cultivated area of Zone II. In addition to these, the project will also improve the drainage systems in the command area, which will drain water from about 3000 ha of water logged area.

3. International competitive bidding will be conducted in accordance with ADB's SingleStage-Two-Envelope Bidding Procedure and is open to all Bidders from eligible source countries as described in the Bidding Documents.

4. To obtain further information and inspect the bidding documents, bidders should contact:

Attention: Mr. Ahmad Khalid "Abdullah" Ministry of Energy and Water Street

Address: Dar-ul-Aman Road Floor/Room number: 2nd Floor

General Planning Department

City: Kabul Country: Afghanistan

Telephone: +93 (0) 789169909/ +93(0)777-238320

Electronic mail: , copy to

5. A complete set of Bidding documents, in English, may be obtained by interested eligible bidders by downloading the same from the ARDS website www.ards.gov.af or may obtain in flash or CD from the Ministry of Energy and Water (MEW) office above. In case of any difficulty in downloading from the website, interested bidders may contact the e-mail address .

6. Delivery of bid:

·  Completed documents (Technical & Price Bids) sealed in two separate envelopes clearly marked as technical bid and price bid in each envelope with the Project name.

·  In hard copy at the location and address as described above.

·  On or before the deadline: (25 June 2015) at 10:00 AM

·  Together with a Bid Security in the amount as described in the Bidding Document, validup to 28 days after the expiry of the bid validity period or on (28 November 2015)

The technical bid will be opened on (25 June 2015) at 10:00am in the presence of the bidders’ designated representatives and anyone who chooses to attend.

7. When comparing bids, ADB’s Domestic Preference Scheme will not be applied.

8. Site visit for bidders is strongly recommended. This will help them to assess the site condition and will raise questions that can be asked by them during the pre-bid meeting. A site visit will be organized on: Date: 1 June 2015

Time: 10:00 hours (local time)

9. A pre-bid meeting shall take place at the following date, time and place: Procurement Directorate Ministry of Energy and Water Dar-ul-Aman Road Kabul, Afghanistan Date: 10 June 2015 Time: 10:00 hours (local time)

Water Supply and Sanitation Investment Program - Tranche 3

Project Name: / Water Supply and Sanitation Investment Program - Tranche 3
Country: / Republic of Azerbaijan
Description: / Construction of Water Distribution and Sewerage Networks of Periurban towns of Nakhchivan City
Funding agency: / Asian Development Bank (ADB)
Last date of bid submission / 25 June 2015, 10:00 (Baku Time)
Price of bidding document: / Manat 250 or US$ 250
Amount of bid security: / as specified in the bidding document
Address for submission of bids: / Mr. Ibrahim Mammadov
Director of Project Management Unit (PMU) State Amelioration and Water Management Committee, Nakhchivan AR Khatai district, Nakhchivan The Republic of Azerbaijan, Nakhchivan Autonomous Republic Telephone: (+99436) 5452618 Facsimile number: (+99436) 5453067 Electronic mail address:

Invitation for Bids