Subcommittee 10

General Session

Chairman: Deryck Williams

Austin, TX

Deryck Williams called the meeting to order at 2:30 PM on Wednesday, January 20th, 2016.

Benjamin Coco and Deryck gave out certificates of recognition to Eric Cunningham for work on API RP10B-4, Dan Mueller for work on API RP10B-3, and Hank Rodgers for work on API 10TR6.

Approval of Minutes from Chicago, IL

Glen Benge made a motion to approve the minutes from the 2015 Summer Meeting as they are posted on the API sharepoint site. The motion was seconded by Rick Lukay and passed unanimously.

Reports of Task Groups and Work Groups

Task Group and Work Group chairpersons (or representative) read the reports from their respective teams. These reports are available as attachments to these minutes.

Group / Chairperson(s)
WG on API 10F Revision / Glen Benge
TG on Cooperative Testing and API Monogram Program / Bill Ulrich
WG on Compressive Strength / Gunnar De Bruijn
Bulletin E3 / Jamie Reid
WG on Comparison of Conditioning Practices for Cements / Luis Padilla
WG on API Spec 10D Revision / John Hebert
WG on Performance Testing Well Cementing Composites / Heiko Plack
WG on HTHP Rheology / Rick Lukay
WG on Foamed Cement / Erick Cunningham
WG on Evaluation of NAF Removal and Water Wetting by Spacers / Paul Sonnier
WG on Well Abandonment / Joe Shine
WG on Triaxial Mechanical Properties of Cement / Axel-Pierre Bois (represented by Anthony Badalamenti)
WG on Well Abandonment / Joe Shine
Rewrite of 10TR1 / Gunnar De Bruijn

Rick Lukay moved to accept the reports as read. The motion was seconded by Erick Cunningham, and passed unanimously.

Old Business

Deryck reviewed the current status of SC-10 documents. The details are listed in an appendix at the end of this document.

WG on Static Gel Strength Testing

·  Rick Lukay voiced concern on the progress of the WG. He suggested that Deryck confirm that the WG chairperson still wants to lead the WG.

·  Deryck commented that the contract with Princeton has not been finalized and has been part of the reason for recent delays.

·  Rick pointed out that the group agreed to continue to test using current methods in addition to the work covered by the Princeton contract.

·  WC Jones mentioned that he would like to get the information from the WG.

·  Deryck said he will encourage that everything gets loaded to the SharePoint.

API RP 65-2

·  Dan Mueller commented that 65-2 is 5 years old and needs to be sent out for reaffirmation.

New Business

Equipment Related Documents

·  Glen Benge commented that SC-10 may need a liaison between SC-18 to help clarify questions around equipment documents (i.e. float equipment and centralizers).

·  SC-18 may be able to address what testing process may be required to monogram equipment.

·  Alfredo Sanchez volunteered to be the liaison.

Calibration Details for SC-10 Documents

·  Rick Lukay commented that the group working on API Spec 10A and API RP 10B-2 recommends making Annex B in 10B-2 a standalone document. This document can then be referenced by other SC-10 documents. Having a separate document will help align calibration requirements across multiple documents.

·  Rick motioned to remove annex B (section on calibration) from 10B-2 and make its own document.

·  James Heathman mentioned a gap analysis will show that most discrepancies in the SC-10 documents are related to calibration.

·  Hieko Plack mentioned that all reference to calibration in 10A will need to be removed.

·  Dan Mueller commented that a lot of other documents would also need revision to accommodate the change in reference.

·  Glen Benge seconded the motion and Deryck approved

·  Dave Stiles mentioned it may be easier to keep the calibration info in 10B-2 and to maintain all the references.

·  Rick Lukay agreed to temporarily lead this WG.

Other Comments:

·  Jody Funk with Cemex said Hugh Wang is no longer with the company. A new person will be appointed for Cemex soon.

Upcoming meetings:

·  2016 - Exploration & Production Standards Conference: Washington DC

·  2017 - Exploration & Production Standards Winter Meeting: Austin TX

·  2017 - Exploration & Production Standards Conference: Calgary Canada

Adjournment

After no additional business was proposed, Jerry Calvert moved that the meeting be adjourned. After the motion was seconded by WC Jones, Deryck Williams adjourned the meeting.


Appendix – SC10 Document Status

Designation / Title / Edition / Date / Notes
API Spec 10A / Cements and Materials for Well Cementing / 24th / Dec 2010 / ·  Document reaffirmed in December 2015
·  Auditor findings and comments are being logged, reviewed and discussed. “Special Work Session” on Thursday, January 21st, 2016
API RP 10B-2 / Testing Well Cements / 2nd / Apr 2013 / ·  Publication of RP 10B-2, 2nd Edition April 2013. Comments are being logged, reviewed and discussed with set path forward after “Special Work Session” on Thursday, January 21st, 2016
·  Future revisions to include: Stirred Fluid Loss Testing, Fluid Loss Screens and elimination of inconsistencies between API Spec 10A and RP 10B-2
·  New WG was formed to revise/rewrite Sections 10, 11 & 12, specifically with regards to atmospheric vs HTHP slurry conditioning requirements.
API RP 10B-3 / Testing of Deepwater Well Cement Formulations / 2nd / Jan 2016 / ·  Recently published
API RP 10B-4 / Preparation and Testing of Foamed Cement Slurries at Atmospheric Pressure / 2nd / Oct 2015 / ·  Recently published revision
·  Technical Report (TR) on Foam Cement Behavior under Well Conditions is the second phase of this WG charge. Work progressing.
API RP 10B-5 / Determination of Shrinkage and Expansion of Well Cement Formulations at Atmospheric Pressure / 1st / Apr 2005 -Reaffirmed Apr 2015 / ·  Document reaffirmed in April 2015.
API RP 10B-6 / Determining the Static Gel Strength of Cement Formulations / 1st / Aug 2010 -Reaffirmed Apr 2015 / ·  Document revision is underway by Work Group.
API Spec 10D / Bow Spring Casing Centralizers / 6th / Mar 2002 -Reaffirmed Apr 2015 / ·  Document reaffirmed April 2015.
·  Review and update API Spec 10D to include performance testing requirements for centralizers that are to be used in applications where they are run through restrictions that are smaller than the hole size in which they are to be set.
API RP 10D-2 / Recommended Practice for Centralizer Placement and Stop Collar Testing / 1st / Aug 2004 -Reaffirmed Apr 2015 / ·  Document reaffirmed in April 2015.
API RP 10F / Performance Testing of Cementing Float Equipment / 3rd / Apr 2002 – Reaffirmed Apr 2015 / ·  Document reaffirmed in April 2015.
·  WG will publish API Specification 10F, 4th Edition which will replace and make obsolete API RP 10F, 3rd Edition. This document will include required specifications and the associated performance testing protocols for the manufacturing of Cement Float Equipment.
·  Document was balloted and is currently in comment resolution.
API 10TR1 / Cement Sheath Evaluation / 2nd / 2008 / ·  Document under revision to update with latest technology and interpretation
API 10TR2 / Shrinkage and Expansion in Oilwell Cements / 1st / 1997
API 10TR3 / Temperatures for API Cement Operating Thickening Time Tests / 1st / 1999
API 10TR4 / Selection of Centralizers for Primary Cementing Operations / 1st / 2008
API 10TR5 / Methods for Testing of Solid and Rigid Centralizers / 1st / 2008
API 10TR6 / Evaluation and Testing of Mechanical Cement Wiper Plugs / 1st / July 2015 / ·  Recently published
API 10TR7 / Mechanical Behavior of Cement / New / ·  Document has been balloted. Ballot results and comments have been resolved and forwarded for recirculation.
·  WG working on triaxial testing method
API RP 65 / Cementing Shallow Water Flow Zones in Deepwater Wells / 1st / Sep 2002 -Reaffirmed 2012 / ·  Reaffirmed 2012, currently being revised by Work Group. Expected publishing date Q1, 2016 as API RP 65-1.
API RP 65-2 / Isolating Potential Flow Zones During Well Construction / 2nd / Dec 2010 / ·  Expect reaffirmation soon
API Bulletin E3 / Environmental Guidance Document: “Well Abandonment and Inactive Well Practices for U.S. Exploration and Production Operations” / 1st / Jan 1993 -Reaffirmed 2000 / ·  Currently being revised.
·  Will also serve as a framework document for the newly formed Work Group on Well Abandonment.