96425: 82407 - Make the Future - SEM - Shell Bitumen

Accessibility Script for P82407_v2.8_2_full_Approval_16x9.mp4

Title:{Shell Bitumen –Shell Eco Marathon Track Laying}

Duration: {1:07} minute

Description:

{Get behind-the-scene access to the Shell Eco-marathon Europe preparations by watching a time lapse of the track paving activities. }

{Shell Bitumen – Shell Eco Marathon Track Laying} Transcript

[Text displays]

SHELL ECO-MARATHON EUROPE

TRACK LAYING

[Animated sequence]

Time-lapse: camera whirls round an access road on a temporarily erected pavilion with a stadium in the background

Caption comes up in white box

[Text displays]

One of the world's most prestigious student innovation competitions

[Animated sequence]

People in high vis, tarmac rolling vehicle, sequence whirls around all sides and perspectives of site

Sequence switches to interior of skeleton construction

[Text displays]

For the first time in 30 years, the Shell Eco-marathon hits London

[Animated sequence]

Three wooden bases for other temporary pavilions, time-lapse continues as they are built

Close up of sign post pointing to London Aquatic Centre, Stratford High Street, Queen Elizabeth Aquatic Park

Time lapse of clouds in sky moving over a causeway in London’s Olympic Park, various people and vehicles move through sequence

Switch back to time-lapse of skeleton of pavilion being erected

Caption comes up in white box

[Text displays]

The challenge for students is to design, build and drive the world's most energy efficient vehicle

[Animated sequence]

Time-lapse of roadway and vehicles inside London’s Olympic Park, vehicles move around, moving earth, constructing foundations

Time-lapse as camera moves off along access road

[Text displays]

The high performance track, where bright energy ideas were tested, was made with Shell's state-of-the-art bitumen.

[Animated sequence]

Time-lapse of wide view of construction vehicles around pavilion

Time-lapse as camera moves off down the road

Time-lapse of wide view of construction vehicles around pavilion

Time-lapse trucks moving away from Olympic Park

Time-lapse of temporary foot bridge with vehicles and people moving underneath

Time-lapse different angle of same scene as shadow of bridge moves off, vehicles pass under and away

Caption comes up in white box

[Text displays]

Up to 200 teams compete at each of the three annual events, aiming to travel the furthest on1kWh of energy or one litre of fuel

[Animated sequence]

Time-lapse of wooden foundations for pavilions seen earlier now with fully constructed floors, further building continues, London Olympic Orbit Towerin background

Time-lapse of clouds in sky moving over a causeway in London’s Olympic Park, various people and vehicles move through sequence

Time-lapse of wooden pavilions above in construction with London Olympic Orbit Tower in background, light, sun, clouds pass across

Final time-lapse of Olympic causeway with changing light sunlight in the background

[Animated sequence]

Screen to white

Shell Pecten

©SHELL INTERNATIONAL LIMITED 2016

1