1 General 1

1.1 Project Introduction 1

1.2 EMP Targets 1

1.3 EMP Compilation 3

1.4 EMP Design 3

1.5 Compilation Details 4

2. Policies, Laws and Administrative Management Framework 5

2.1 Environmental Policies, Laws and Regulations 5

2.1.1 Overview 5

2.1.2 Environmental Protection Laws and Regulations 5

2.1.3 Regulations, Specifications and Local Laws Relevant to Environmental Protection 6

2.1.4 EIA Technical Guidelines and Specifications 7

2.1.5 Environmental Quality Standards 8

2.1.6 Pollutant Emission Standards 8

2.1.7 WB’s Safeguard Policies 8

2.1.8 Relevant Project Documents 9

2.2 Environmental Management Agency and Duties 9

3. Project Description 12

3.1 Project Name and Composition 12

3.2 Project Implementation Schedule 13

3.2.1 Construction Period 13

3.2.2 Progress Schedule 13

3.3 Project Overview 13

3.3.1 Construction Content and Scale 13

3.3.2 Process Design 15

3.3.3 Service Range 16

4 Summary of Environmental Impacts and Environmental Protection Measures of the Project 18

4.1 Impacts due to the Resettlement, Land Acquisition and Relocation 18

4.2 Environmental Impacts and Mitigation Measures in the Project Construction Process 22

4.2.1 Construction Period 22

4.2.2 Operation Period 28

5. Environmental Management Organization of the Project 33

5.1 Brief Introduction 33

5.2 Environmental Protection Organization during the Construction Period 35

5.2.1 Duties and Responsibilities of the Environmental Protection Organization 35

5.2.2 Positions and Duties of the Personnel Arranged 37

5.3 Environmental Management Agency during the Operation Period 40

6. EMP Implementation 41

6.1 Project Management 41

6.1.1 Overall Management 41

6.1.2 Management Supervision 42

6.2 Detailed EMP Implementation Tasks 45

6.3 Contract Requirements on Environmental Management 49

6.4 Information Communication and Inconsistency Solutions 49

6.5 Training-Necessary Capacity and Means Building 51

6.5.1 Training requirements 51

6.5.2 Training Content 51

6.5.3 Budgetary Estimate for Personnel Training Fees 53

6.6 Compensation for Land Acquisition 54

6.7 Ethnic Minorities 55

6.8 Temporary Site Restoration 55

7. Environmental Monitoring Plan 56

7.1 Monitoring Purposes 56

7.2 Environmental Monitoring Agency 56

7.3 Detailed Environmental Monitoring Requirements 59

8. Environmental Management Expenses Estimation and Fund Sources 60

8.1 Budget Distribution 60

9. EMP Information Management 62

9.1 Information Exchange 62

9.2 Recording Mechanism 62

9.3 Reporting Mechanism 62

Annex 1 Environmental Standards Involved with the Project 65

Annex 2 Detailed Environmental management Specifications for the Project Contractor 68

Annex 3 Detailed Environmental management Specifications for the Project Operation Department 76

Annex 4 Environmental Monitoring Plan and Detailed Budget of the Project 78

Annex 5 Associated Works of the Project (Environmental Monitoring Plan of Quanhu Urban Refuse Landfill, Xiangxiang City) 80

Annex 6 Summary of the Project EMP 82

ABBREVIATIONS

缩略语

CEA Consolidated Environmental Assessment

环境综合评价

CSE Construction Supervision Engineer

建筑监理工程师

CSEE Construction Supervision Environmental Engineer

建筑监理环境工程师

CSEMP Construction Site Environmental Management Plan

建筑工地环境管理计划

DI Design Institute

设计单位

EA Environmental Assessment

环境评价

EIA Environmental Impact Assessment

环境影响评价

EMC Environmental Manager Coordinator

环境经理协调员

EMP Environmental Management and Monitoring Plan

环境管理及监测计划

EMS Environmental Monitoring Station

环境监测站

EPB Environmental Protection Bureau

环境保护局

IA Implementation Agency

项目实施单位

PO Project Owner

项目业主

PMO Project Management Office

项目管理办公室

PRC The People’s Republic of China

中华人民共和国

SE Supervision Engineer

监理工程师

WB World Bank

世界银行

WWTP Wastewater Treatment Plant

污水处理厂

HNPMO Hunan Project Management Office

湖南省利用世行贷款项目办公室

CSEPCTC Changsha Environmental Protection Career Technical College

长沙环境保护职业技术学院

CURRENCIES & OTHER UNITS

货币及其他单位

MU Area Unit (1MU=0.0667ha)

面积单位,1 亩=0.0667ha

RMB Chinese Yuan (Renminbi)

人民币元

USD United States Dollar

美元

Conversion rate 1 USD=6.3RMB

汇率,1 美元=6.3人民币元

CHEMICAL ABBREVIATIONS

化学缩略词

ABR Anaetobic Bafflted Reactor

厌氧折流板反应器

A²/O Anaerobic-anoxic-oxic biologic phosphorus & nitrogen

厌氧-缺氧-好氧生物除磷脱氮工艺

BOD5 Biochemical Oxygen Demand (5 days)

5日生化需氧量

CASS Cyclic Activated Sludge System

循环活性污泥

COD Chemical Oxygen Demand

化学需氧量

NH3-N Ammonia Nitrogen

氨氮

SBR Sequencing Batch Reactor Processing

序批式活性污泥法处理工艺

SS Suspended Solids

悬浮固体物

TN Total Nitrogen

总氮

TP Total Phosphorus

总磷

TSP Total Suspended Particulates

总悬浮颗粒物

UASB Up-flow Anaerobic Sludge Bed

上流式厌氧生物反应器

I

1 General

1.1 Project Introduction

With the social economy development of Yueshan Town and further acceleration of the urbanization process, the urban construction takes on a new look. However, some problems arising from the urban development are in urgent need of solutions, including undeveloped town economy, small aggregated economic volume, low industrial management level, delayed infrastructure and public facility construction of small towns, depressed urban visitor flowrate and logistics, poor attraction effect, serious environment pollution, and insufficient construction funds; especially, as the production and domestic wastewater of Yueshan Town is randomly discharged without any treatment or directly drained into adjacent channels and there are no uniform drainage pipelines, the water body and adjacent areas are seriously polluted, the living of residents in adjacent towns is significantly impacted, and the inhabitation environment quality of the towns declines increasingly. In order to further promote the healthy and sustainable social and economic development of Yueshan Town as well as enhance the urban habitation environment quality and the status of insufficient construction funds for the infrastructures, it is determined to utilize the WB loans to construct the integrated economic development demonstration town project of Hunan Province and faithfully accelerate the rapid and sustainable economic and social development of Yueshan Town by means of the site reconnaissance of the provincial, municipal, and county-level development and reform departments and experts based on the tenets of WB loans of “improving the environment and enhancing the sustainable development” and the actual conditions of Yueshan Town.

In December 2010, Yueshan Town initially completed the identification reporting information of Hunan Province Utilizing WB Loans to Construct the Integrated Economic Development Demonstration Town. In January 2011, in order to accelerate the progress of Hunan Province Utilizing WB Loans to Construct the Integrated Economic Development Demonstration Town, the People’s Government of Yueshan Town entrusted Hunan Provincial International Engineering Consultation Center to compile the Feasibility Study Report on Hunan Integrated Economic Development Demonstration Town Utilizing WB Loans. In February 2011, the expert group went to the site and performed investigation and survey, according to the actual conditions of Yueshan Town, the construction scheme and content were prepared and it was also determined to utilize the WB loans to develop the construction of the Wastewater Treatment Plant and supporting projects, industrial development research of small towns, small town management research, staff training, and other construction projects through discussions and negotiations with the government of Yueshan Town. Currently, all preliminary preparations of the project are in smooth progress.

The project is a newly-built one, with the total investment of RMB 41.0469 million yuan and land occupation area of 8529m2 (12.8mu). The newly-increased wastewater treatment scale is 6000m3/d, (to be constructed in two stages, the assessment this time is focused on the stage I, with the scale of 3000m3/d), and the wastewater collection pipe networks of the town area are reconstructed and perfected.

The main technical indices for Yueshan Town Subproject of Xiangxiang City under Hunan Integrated Economic Development Demonstration Town Project utilizing WB loans are shown in Table 1.

89

Table 1-1 Main Technical Indices of the Project

No. / Content / Index / Remarks
1 / Service range / Central town area of Yueshan Town / /
2 / Service area / 2.03km2 in short term / 3.22 km2 in short term (2013) and long term (2020)
3 / Service population / 13500 persons in short term / 25500 persons in short term (2013) and long term (2020)
4 / Total land occupation area of the Wastewater Treatment Plant / 8529 m2 / Totaling 15.29mu
5 / Land occupation area of the building (structure) / 3150 m2 / Totaling 4.73mu
6 / Construction scale of the Wastewater Treatment Plant / 3000 m3/d / The land with a scale of 6000 m3/d is reserved
7 / Water disinfection process / Ultraviolet light disinfection / /
8 / Treatment process / DEST process / /
9 / Sludge disposal / Sanitary and safe landfill / Safe landfill of the sludge by means of the integrated mechanical thickening and dehydration treatment
10 / Pipe network construction / 13.52 km / Wastewater pipe network paving length
11 / Total investment of the project / 41.0469 million yuan / In short term (2013)

1.2 EMP Targets

Based on the inevitable environmental impacts of the project, the EMP is compiled to formulate a set of environmental protection countermeasures, which is technologically feasible, and financially sustainable and operable, and make clear the environmental mitigation and management measures, and institutional establishment and arrangement that the project Contractor, Supervisor, Operator and environmental management departments shall implement so as to eliminate or compensate for the negative social and environmental impacts caused by the project to minimize the impacts to the acceptable level. Specific targets include:

(1) Make clear the environmental management obligations of the Contractor and Operator

The Environment Protection Bureau of Xiangxiang City, environment assessment unit, and Design Institute has made specific site checking and confirmation to the environmental protection target, put forward the effective environment mitigation measures and incorporated them into the project design, which are regarded as the contractual obligation of the project construction Contractor and Operator.

(2) Take it as the operation guideline for the environmental management

The EMP during the construction period and the operation period described in the Environmental monitoring Plan can ensure the effective implementation of the environment mitigation measures, which will be made as the environmental protection text and submitted to the construction supervision unit, environmental supervision unit, and other relevant units during the construction period and the operation period, so as to define the responsibilities and effects of relevant functional departments and management agencies as well as put forward the communication and exchange channels and modes of all departments.

(3) Expenditure to ensure the environmental management action

The EMP has estimated the expenditures for the mentioned environmental management, environmental supervision, and capability building and described the expenditure source, so as to ensure all environmental management actions can be implemented. The management expense includes the staff salaries, office expense, and traveling expense.

The EMP is intended to avoid and control the environmental impact during the project implementation and operation, and put forward the impact mitigation measures, monitoring measures, legal supervision means, and guarantee measures of above measures to be performed, which is a key link between the impact mitigation measures and the alternative measures assessed and described in the environmental impact and environment assessment. And, the EMP also specifies the technical annotations, investment estimate, implementation plan, functions of the governmental agency, fund source, and monitoring scheme for each environmental management measure. To reach the reduction target, all methods involved with the environmental impact assessment report and the EMP shall be implemented.

1.3 EMP Compilation

The report is compiled by Changsha Environmental Protection Career Technical College entrusted by Hunan Project Management Office; during compilation, all participators are subjected to relevant training and technical guidance. The EMP of the project will be compiled in strict accordance with the national and provincial environmental management laws and regulations. In the premise of meeting the Chinese environment assessment requirements, the requirements of the security regulations of the WB shall be paid special attention; see relevant stipulations in the operation article 4.01 for details.

The information source of the project EMP is as follows:

(1) Project environmental impact assessment report (EIA)

(2) Project feasibility study report

(3) Project resettlement plan

(4) Seminar jointly participated by Hunan Project Management Office, WB representatives, Changsha Environmental Protection Career Technical College, and relevant staff

1.4 EMP Design

In order to concretely describe the content of the environmental management, environmental supervision, and environmental monitoring, the compiled EMP is the guideline for the environmental management during the project implementation, and its action plan mainly includes following four parts:

(1) Environmental impact and mitigation measures: The main impact during the project construction period and the operation period is the environmental impact; the environmental impact and mitigation measures refer to the engineering measures and management measures to prevent or mitigate the negative environmental impact brought by the project.

(2) Environmental management and supervision plans: The environmental supervision activity to ensure the synchronous implementation of the environmental protection measures and the project.

(3) Environmental monitoring Plan: The environmental supervision activity to eliminate the environment pollution during the construction period and the operation period and ensure the safe operation of the project and the improvement of the environment status.

(4) Capability building (namely the staff training) plan: The knowledge and skill training to the management staff, environmental supervisor, and full-time or part-time environmental management staff during the project implementation to ensure the performance of the EMP.

1.5 Compilation Details

The EMP is compiled based on the Environmental Impact Assessment Report for the Yueshan Town (Xiangxiang City) Integrated Economic Development Demonstration Town Project Utilizing WB Loans and assessment opinions of the WB experts. As an independent document, the EMP includes all environmental management actions to be implemented during the project construction period and the operation period, which offers the action guideline and working framework to the negative impact mitigation measures, environmental supervision, environmental management, and environmental monitoring during the project construction period and the operation period.

89

2. Policies, Laws and Administrative Management Framework

2.1 Environmental Policies, Laws and Regulations

2.1.1 Overview

Through the comprehensive analysis on the project type and scale, siting, environment sensitivity, and potential environmental impact characteristics and size, the main basis of the project environmental assessment and the involved laws, regulations and rules, and standards include: