Section 16130

walkercell cellular raceway and junction box feeder system

PART 1 GENERAL

1.1 Scope

Work under this section includes all labor and materials, which are required for the completion of the infloor distribution system, as shown on drawings and as specified. The Conditions of the Contract and Division 1 apply to this section as if repeated herein. Work includes, but is not necessarily limited to the following principal items.

1.2 SECTION INCLUDES

1.2.1 Cellular Metal Raceway Units and Accessories

1.2.2 Cellular Raceway Junction Boxes

1.2.3 Junction Box Feeder Systems, Closures, and Risers

1.2.4 Presets and Activations

1.3 related sections

1.3.1 Section 16132 – Trenchduct Feeder System

1.4 references

The editions of specifications and standards referenced herein, published by the following organizations, apply to the work only to the extent specified by the reference.

1.4.1 Underwriters Laboratories Inc. “UL Standards of Safety for UL209 Cellular Metal Floor Raceway and Fittings”

1.4.2 NEC. “National Electrical Code”

1.5 submittals

The following information shall be submitted to the architect and/or specifying structural, electrical, and communication engineers.

1.5.1 Manufacturer’s Data

The manufacturer shall submit product specifications such as technical literature and installation instructions for the raceway, junction box feeder, and accessories. The manufacturer shall submit
proof of UL compliance regarding the junction box feeder system. The manufacturer shall submit
erection drawings in AutoCAD® format for each product specified showing in detail the required
erection procedures and accessories for the complete system.

1.6 quality assurance

Walkercell Raceway, Junction Box Feeder, and accessories to provide a complete cellular floor raceway and feeder system furnished by Walker Systems, Inc., a Wiremold Company, Williamstown, WV, shall establish the minimum requirement for function, dimension,
and appearance.

The materials, products, and equipment specified in this section establish a standard
of required function, dimension, appearance, and quality to be met by any
proposed substitution.

The manufacturer and installer shall certify that they have a minimum of five years experience with the type of electrified floor system specified.

1.7 substitutions

No substitution will be considered unless written request for approval has been submitted
by the bidder and has been received by the architect at least ten days prior to the date for receipt of bids.

Each such request shall include the name of the materials or equipment for which it is to be substituted and a complete description of the proposed substitute including drawings, cuts, mock-ups, performance and test data, compliance with codes and approvals and any other information necessary for evaluation.

PART 2 PRODUCT

2.1 acceptable product

2.1.1 Cellular Raceway

Walkercell Cellular Raceway, a product of Walker Systems, Inc. Other suppliers must submit ten days prior for approval.

2.1.1.1 Materials:

The materials from which the various components of the cellular raceway system are manufactured shall conform to the following:

WCR11/2: 3-Cell, 17 5/8" [448mm] wide x 1 1/2" [38mm] deep cellular unit. Power – 4.22 sq. in. [2722sq. mm]; Communication – 8.2 sq. in. [5290sq. mm]; Data – 8.2 sq. in. [5290sq. mm].


WCR2: 3-Cell, 21 3/4" [552mm] wide x 2" [51mm] deep cellular unit. Power – 4.3 sq. in.
[2774sq. mm]; Communication – 11.0 sq. in. [7097sq. mm]; Data – 11.0 sq. in. [7097sq. mm].

WCR3: 3-Cell, 21 3/4" [552mm] wide x 3" [76mm] deep cellular unit. Power – 8.5 sq. in.
[5484sq. mm]; Communication – 18.8 sq. in. [12129sq. mm]; Data – 18.8 sq. in. [12129sq. mm].

The three cells shall be contiguous, while complete isolation is maintained between services.

The cellular units and associated accessories shall be fabricated from steel sheets conforming to ASTM A446, Grade A.

2.1.1.2 Fabrication:

Cellular Raceway shall be fabricated in 10' [3m] lengths. Cellular units shall be 20 gauge [.9mm] minimum and have a Protective Coating: Galvanizing, ASTM 525, G-90.

2.1.1.3 Couplings:

Shall be incorporated into the junction box design to permit proper alignment and ground continuity
of the system.

2.1.2 Cellular Raceway Junction Boxes

Typical Junction Box shall be Cat. No. 2-11/2JB2510 Box consisting of a 2 1/2" [64mm] deep body and
a 1" [25mm] deep access ring.

2.1.2.1 Materials:

The Cellular Raceway Junction Box Units and associated accessories shall be fabricated from steel sheets conforming to ASTM A653, CS Type B, Protective Coating: Galvanizing, ASTM A653, G90.
Minimum effective capacities for the three-compartment junction box shall equal the capacity of the raceway being fed through.

Access to the junction box shall be limited to isolated access openings 22" [559mm] in diameter, in accordance with distribution raceway modules. There shall not be a continuous cover plate along the length of the header raceway.

2.1.2.2 Fabrication:

Junction boxes shall be 26" [660mm] square. Junction box units shall conform to the requirement of UL Standard 209, as electrical raceways, and shall be 16-gauge minimum. Power tunnel height shall be equal to the height of the Walkercell power compartments.

2.1.2.3 Removable Covers:

Conforming to UL Standard 209 load test requirements and shall be 5/16" [7.9mm] thick and
22" [559mm] diameter. Leveling screws beneath the cover plate shall provide for 3/8" [9.5mm]
upward adjustment after the concrete pour.

2.1.3 Junction Box Feeder System

Typical module of Junction Box Header, as shown on drawings consisting of a three-compartment, minimum 2 1/2" [64mm] deep junction box body and a 1 1/2" [38mm] high access ring. Typical junction box header, Cat. No. shall be 2JBH242515-60 and shall be 24" wide x 60" long [610mm x 1524mmm].

2.1.3.1 Material:

Minimum effective capacities for three-compartment junction box header units shall equal not less than 80% of the capacity of the header feeder unit. The Junction Box Header Units and associated accessories shall be fabricated from steel sheets conforming to ASTM A653,
CS Type B, G90.
Access to the Junction Box Header shall be limited to isolated access openings, 22" [559mm] in diameter, in accordance with distribution raceway modules. There shall not be a continuous cover plate along the length of the header raceway.

2.1.3.2 Fabrication:

Shall conform to the requirement of UL Standard 209, as electrical raceways, and shall be
16 gauge minimum.

2.1.3.3 Removable Covers:

Conforming to UL Standard 209 load test requirements and shall be 5/16" [7.9mm] thick and
22" [559mm] diameter. Leveling screws beneath the cover plate shall provide for 3/8" [9.5mm]
upward adjustment after the concrete pour.

2.1.4 Preset Inserts:

The preset unit shall be capable of housing communication connectors and two duplex receptacles
in a recessed location. Preset shall access all three service compartments from above at one location, and no connections shall negatively impact the square inch capacity of any raceway compartment.

2.1.4.1 Material:

Shall be UL Listed, integral formed zinc die-cast body with 5 1/2" x 6 1/4" [139mm x 171mm] minimum top entry into preset body. Included with the preset is a minimum .024" [.6mm] thick steel closure cap having been surface treated with a non-corrosive UL Recognized coating. The minimum thickness of the preset body shall be .062" [1.6mm].

2.1.5 Activation Kits

2.1.5.1

Activation kits shall be the FloorPort™ Series Service Fitting manufactured by Walker Systems, Inc.,
a Wiremold Company.

2.1.5.2

Activation kits shall provide triple service access and shall be UL Listed and Classified.

2.1.5.3

Activation kits shall be capable of recessed mounting.

2.1.5.4.

Activation kits shall allow two separate receptacle boxes and faceplates to accommodate duplex receptacles and communication device mounting brackets.

2.1.5.5. Activation Kit Options:

2.1.5.5.1 Recessed with Flange (FloorPort S36 Series Activations)
Provides for two duplex receptacles and two communication device brackets as specified. Activation cover shall pass UL requirements for scrub water exclusion. Activation to include two metal covers with center located, gasketed wire egress area with slide covers. Cover will include flange for mounting to floor. Covers will be blank or will provide area for flooring insert.

2.1.5.5.2 Recessed without Flange (FloorPort S37 Series Activations)
Provides for two duplex receptacles and two communication device brackets as specified. Activation cover shall pass UL requirements for scrub water exclusion. Activation to include two metal covers with center located, gasketed wire egress area with slide covers. Cover will be flangeless for undercarpet and tile applications. Covers will be blank or will provide area for flooring insert.

2.1.5.5.3 Flush Partition with Flange (FloorPort S36P or S36PP Series Activations)
Provides one or two 1" [25mm] factory punched holes for connection of sealtite conduit for
partition furniture feeding. Activation cover shall pass UL requirements for scrubwater exclusion.
Activation to include two metal covers with center located, gasketed wire egress area for
pull-through communication wires. Cover will include flange for mounting to floor.

2.1.5.5.4 Recessed Partition without Flange (FloorPort S37P or S37PP Series Activations)
Provides one or two 1" [25mm] factory punched holes for connection of sealtite conduit for partition furniture feeding. Activation cover shall pass UL requirements for scrub water exclusion.
Activation to include two metal covers with center located, gasketed wire egress area for
pull-through communication wires. Cover will be flangeless for undercarpet and tile applications.

2.1.5.5.7 Adjustment
Shall provide an upward adjustment of 3/4" [19.1mm].

2.1.5.5.8 Activation Kits
Shall be supplied in quantities as specified or equal to 15% of the supplied preset insert.

PART 3 EXECUTION

3.1 Installation

3.1.1 Manufacturer’s Instructions

Install distribution raceway system and accessories in accordance with the manufacturer’s recommendation, installation instructions, the final installation drawings and as herein specified.

3.1. Install Raceway

Place raceway system on the supporting framework and adjust to final position with proper end bearing and alignment at the butt joints before permanent fastening. Electrical module lines shall be laid out on
the concrete base in each building bay and the raceway units shall be located in strict accordance with
the electrical drawings in order to maintain the electrical module spacing.

3.1.3 Couple Junction Boxes

Slide Walkercell into factory attached coupling hood on side of junction boxes. Junction box headers
are provided with U-channel couplings and screws.

3.1.4 Attach Supports

Permanently fasten the raceway supports to the supporting framework with screws and nails. The raceway supports shall provided for 1 1/4" [32mm] adjustment. The raceway supports and the raceway distribution system shall be adjusted so the top of the presets are 1/8" [3.2mm] to 3/8" [9.5mm] below the screed line.

3.1.5 Attach Risers

Install all cell and header risers using fillet welds, pop rivets or screws provided. No sharp edges or screws shall penetrate into the cell or header risers in accordance with UL standards.

3.2 Field quality control

3.2.1 Concrete Topping

Concrete topping shall be as indicated on the drawings and as specified under Section 03300 and 01410. No concrete containing chlorides from any source shall be placed over or in contact with infloor units.

3.2.2 Seal System

Before concrete placement, make a final inspection of the entire Walkercell System. Any gaps in the system shall be sealed to prevent concrete from entering.

3.2.3 Concrete Design

Concrete design shall be in accordance with American Concrete for Buildings (ACI301-720) and ACI Building Code Requirements for Reinforced Concrete (ACI318-830). Concrete placement shall follow proper and accepted industry practice and be in accordance with ACI Recommended Practice for Measuring, Mixing, Transporting and Placing Concrete (ACI304-73).

3.2.4 Concrete Pour

Concrete must be vibrated at all headers and raceways to ensure that the concrete completely fills all voids under the Walkercell System. Care must be taken not to over vibrate. Over vibration will cause segregation of materials in the concrete mix, which in turn leads to weakening of concrete strength.

3.2.5 Concrete Placement

Shrinkage and temperature reinforcement above the Walkercell and Junction Box Header System shall be in accordance with ACI318-83. Care shall be taken during concrete placement and, in particular, during concrete vibration, to prevent rising of top reinforcement within the slab.

3.2.6 Concrete Finishing

Contractors placing the concrete shall carefully hand finish a minimum of 24" [610mm] adjacent to junction box access openings so that the top of finished and junction box access units are flush.

3.2.7 Remove Moisture

Within 48 hours after the concrete pour, remove one cover at each end of header to allow air circulation. Remove all water and moisture from the system.

3.3 Field Testing and Inspection

Specified in Section 01410.

3.4 Protection

Protect installation of floor system from damage. Do not move or transport equipment or heavy traffic over system during construction period, without first installing ramps. Ramps shall be designed so that imposed loads are not transferred to system components. Components of
the system, which are damaged during construction, shall be replaced at no cost to the owner or manufacturer.