Haji Khan Shahani

Contact: 0565107844

Visa Status: Visit Visa (Valid up to 3 November 2016)

Certification: DPS Certified Engineer

E-mail:

Professional Profile

Ø  Technically accomplished professional with nearly 5 years rich experience in Commissioning, Configuration & Maintenance Management, Project Execution and Site & Construction Management with leading organisations in the Telecom sector.

Ø  Adept in planning, design, installation and configuration of networks, maintenance and troubleshooting, network user management on multiple platforms; governed by communication protocols

Ø  Well versed with the designing, operation, maintenance and splicing of Optical Fiber Cable Network, Fiber to the Building, Copper Cables & Last Mile Connectivity

Ø  Expertise in swiftly ramping up projects with competent cross-functional skills and on time execution.

Ø  Demonstrated abilities in managing the installation and integration of telecom Network equipments like ONU, Testing & Commissioning of Optical fiber Networks, MSAN,MSAG,ONU,DSLAM, DSLAM), Structured Cabling and CCTV Cameras, PABGM , WIFI & AV System and also worked on Huawei Telecom Equipments etc.

Ø  Enterprising leader with excellent analytical, organizational and interpersonal skills.

Areas of Expertise

Project Execution

Ø  Interacting with Project Leaders to conceptualize project execution plans, finalizing scope, handling selection of sites, and conducting project evaluation in terms of outlays and profits attached.

Ø  Establishing time span of execution of Multi-location Projects as per client specifications.

Ø  Listing down the resource needs for projects, after considering the budgetary parameters set.

Operations & Maintenance

Ø  Designing network layouts and managing the installation, commissioning, configuration & maintenance of a wide range of telecom equipments.

Ø  Ensuring maintenance of complete network, inclusive of performance monitoring, day to day network operations, preventive & corrective maintenance.

Career Highlights

Emerging Technologies Dubai, UAE (United Arab Emirates) (DEC 2013 to JUNE 2016)

Position: ELV Project Engineer.

Leading Electronics/communication Engineers, Supervisors, Site team to implement various ELV systems (Public Address and Voice Evacuation, Access Control, Intrusion, CCTV, GRMS, Telephony, SCS, SMATV ,Gate barrier system ,Parking management System IT& Communications, Intercom, systems , Budget Control , Quality Assurance / Control , Coordination & Operations ▪ Vendor & Materials Management , Computer Skills , Written & Verbal Communication Skills , Leadership skills , Project Management skills..

Work Experience

Detailed Tasks Performed.

Leading ELV Scope from design to closing phase

Security Systems (Access Control, Intrusion, CCTV)

IT& Communications System

Telephony, Intercom (Audio & Video)

Prepares and develops project pricing.

Coordinates, communicates, and delegates tasks based on project requirements

Ensures the project plan maintains as it has been initiated time and budget wise without deviating

Review technical materials submittals as per specifications requirements

Provide solutions to daily site construction issues

Establish and coordinate time schedule for design and site works

Prepare Testing & Commissioning (T&C) Method Statement

Assist construction team to final handover of the installation

Attends regular meetings with different stakeholders, and suppliers in order to manage their expectation as well to be informed of changes.

Preparing Quotation According to the BOQ and Drawings.

Develops project objectives by reviewing project proposals and plans, conferring with management and completes projects by organizing and controlling project elements.

Studies product design, customer requirements performance standards, then determines project specifications. Presents cost estimates and performance standards.

Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and elements.

Evaluation/review and approval of Sub contractor’s shop drawings and submittals.

Managing a team of site engineers/supervisors for site works related to the project and draughting team for drawing & engineering related works.

Preparation of Technical submittals, Material submittals, Work Notifications, Inspection Requests, and all Documentation works, Drawings, etc. related to the Project.

Coordination of internal and external engineering activities and the interdisciplinary interfaces in close coordination with the discipline team leaders.

Checking the claims submitted by the suppliers with respective to the actual requirements of the project /BOQ/Specifications.

Identifying the works out of the scope of works & claiming variations & adding profit to the organization.

Designation authorizes the complete in charge of the site from the day 1 till the end of the project.

Preparation and review of tender documentation.

Costing /Estimation experience in Low Voltage Systems (CCTV, ACS,SCS, SMATV ,Gate Barrier, PABGM & FTTH).

Commissioning & Installation of CCTV, Security Access Control System,

Coordination with consultant and subcontractor’s for engineering and design issues.

Coordinate subcontractor and external suppliers for technical submittal and shop drawing requirements

Execution and supervision of project activities such as drawings, submittals, procurement, follow-ups, manpower handling, installation, commissioning, handing over etc.

Follow up with sub contractor for material submittals in line with approved schedule.

Monitoring approval of submittals by the consultant.

Reviewing of weekly progress of works and forwarding the same to the main contractor.

Performing inspection for materials delivered by different suppliers, sub contractors and client.

Preparing cost proposals for Variation works.

Ensure that the project sub contractor works are carried out in accordance with the specifications & approved drawings, agreed procedure and method statements.

Ensuring that the sub contractor follows approved ITP for ELV works.

Ensuring that the redline drawings, As Built Drawings, O&M Manuals and related documentation is prepared, reviewed, submitted and approved in a timely manner, in line with the contract.

Estimating the Quantity of works for Monthly Payment Application.

Review and action as required on inter audit reports.

Monitoring close out of snags raised by the consultant.

Supervise the temporary services items at project close out

Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works. Assign targets for accomplishments and ensure targets are met on daily basis for all electrical groups at site.

Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards

Al-Futtaim Technologies (Hanars Communication Network LLC UAE)

Project YAS ISLAND WATER PARK ABU DHABI (ELV Site Engineer) (April 2012 to January 2013)

Planning and implementing the assigned IT Infrastructure projects

Conduct Site survey for Cabling projects and works

Involved in Designing, estimation, proposal preparation, planning and implementing of

All Structured Cabling Projects.

Hands on Experience on FTTH, Fiber Panel Installation, server installation

Installation Looping & Termination of 200 Land Scape Speakers(X850 Series)

Responsible for Installation & Testing Networkable PAVA System-EN54-16

Hands on experience for the Installation, Pre-Commissioning of 450( IP Based CCTV Camera)

Responsible for the Installation of Audio Video system, Installation of PABGM Amplifier

Responsible for the Installation and Focusing of external; Internal &Dome Camera

Installation of Patch panel and Splicing of single mode &Multimode Fiber Optics

Installation & Pre Commissioning of, Intercom& IPTV

Preparation of MIR Report, Conducting the Inspection of Site work with Contractor

Conducting the PAT of Site with Customer

Attending the Meeting with Customer

Managing the Project Work, Complete the Task

Installation of SmartVox-MA12 (Line Array Speaker)

Installation of Fire Alarm for inter rack, Access door Controller, PHP (Public Help Point)

Responsible for the Installation of ODF FDH & Termination of Fiber Cables

Worked on OSP, Cable Structure, Termination, testing & Labeling of Network cables

Responsible for Installation of Door Controller & Locker management System

Installation & Testing of Access Control Devices in over all the Building

Responsible for the Installation & Testing of Indoor & outdoor Wi-Fi

Responsible for Installation of Volume Controller in PABGM System

Installation, testing of Intercom & Life Guard Telephone system

Hands on experience for the Installation Testing of Splash Quest all over the Site

Installation & Testing of Emergency Speaker

Pre Configuration & Testing the Polarity of PABGM system zones

Managing team and Complete Given Task

Managed the technical team for the successful completion of tasks within the time frame

And facilitating the team with all the required materials and tools on time.

Scheduling day today activities and to provide a daily report to senior management.

Ownership and resolution drive for any of the Operational escalation

Al-Futtaim Technologies (Hanars Communication Network LLC UAE)

Project WILD WADI JUMEIRAH WATER PARK DUBAI (Project Site Engineer) January 2013 to August 2013

Installation of Audio Video system ,Installation of PABGM Amplifier

Responsible for the Installation of Volume Controller in PABGM system

Installation & Testing of Emergency Speaker

Testing the Polarity of PABGM system zone wise

Installation of ODF FDH & Termination of fiber Cables

Installation ,Testing & Splicing of single mode &Multimode Fiber Optics

Responsible for Installation and testing of Network Paging Station model No PS 1650

Installation ,Termination & testing of Ultra slim high power Woofer (KU36)

Installation , Termination & testing of Ultra Light Passive Subwoofer (KL12)

Responsible for Installation, Termination &Testing of Variable Beam 3D Line array (KK50vb)

Installation and inter connectivity of class D power amplifier line(KA10,KA10-10,KA40)

Installation Testing & Commissioning of High tech -ultra light powered stereo system (KR202)

Responsible for Managing the Team on sites and check the progress work

Attained site work and weekly meeting with customer for the progress of project

Complete the project task before deadline

Sending daily update report to Project manager for project site progression

Huawei Technologies (Komkonsult Private Limited as Access Network Engineer)(March 2010 to April 2012)

Project of Etisalat Pak Telecom

Responsible for the Commissioning & Configuration of MSAN ,ONU,OSN,MSAG, DSLAM,NGN C -5, GPON

Survey of new sites for NGN C -5, DSLAM, Rectifier, Cabling.

Leading & supervising Operation and Maintenance works of both Optical Fiber and Copper network.

Installation ,Commissioning ,Configuration & Testing 160K IP DSLAM (MA5616)

Responsible for Conducting the Successful Migration over Soft switch C5

Configuration of EMU and Smoking sensors in the Switch room

Responsible for the Successful Migration of STM-1 to STM-4

Responsible for Conduct the Successful PAT of after Completion of Sites

Responsible for attending the meeting with Customer

Managing the team for Mobilization of Sites & Complete the Work task

Co-ordinate with Team for any technical issue & solve on same time

Accountabilities

Supervise &Leading the site installation, commissioning, Configuration PAT of new sites,

Maintaining exchange wise OSP/ Fiber and Test records.

Supervising& Conducting the Splicing of Optical Fiber.

Accomplishments

Successfully handled the operation and maintenance of Cable (Copper and Optical Fiber) network.

Efficiently conducted the Optical Fiber Testing with OTDR and Optical Power Meter Device.

Oil Field Refinery area Major MSAG/FTTH works completed

Efficient work deployment of site done for Fiber networks.

Operation and Maintenance of Both Fiber and Copper networks done.

Worked on Cyber net DSL project in Karachi

The worked include all the installation of equipments, cabling end to end patching and testing of these equipments according to HUAWEI Standards

PAT of MSAG ONU & AAA Testing which including the brand band, Narrow band & IPTV service , Dual Homing Services, Hardware test, Rectifier test ,multicast service, configuration EMU, cascading of Frames, BRI,PRI Configuration,

Installation & Commissioning of MA5600(MA5603),MA5600&MA5603T,MA5616 DSLAM,

Survey of Sites for New Installation, Testing, LAN Switch configuration( S5300,S3900),RIP Configuration,

Planning & Integration of MSAN Project various phase migration of existing TDM to IP based NGN with

Replacement of MDF jump ring work. Managed successful cutovers of various TDM switches to NGN.

Successfully cut over of Alcatel-Lucent TDM,ZTE,EWSD

Pakistan Telecommunication Company (Etisalat) Pakistan as M.T Engineer

Accountabilities

Developed plans for:

NGN (Next Generation Network) which included the connectivity proposal for BN from the Building Aggregation Node (BAN) using fiber, installation of EDP, aerial cabling of the fiber and copper access inside the building.

Installation, operation and maintenance of MSAN, DSALM, ONU, MSAG – Access Network Equipment (CT) and Remote Terminal.

Updated Rectifier survey details for MSAN/ DSLAM/ ONU.

Involved in lying of 40mm ducts (Fiber and unarmored cable laid).

Managing team to conduct site before down time etc.

Troubleshooting issues related with ONU, MSAG, Metro 1000, worked on DDF Patching, of Subscriber cables

Technical Support to The Customers, PRI Testing, BRI Testing

Accomplishments

Successfully handled the rectification work of Direct Burial Cabling (DBC).

Pivotal in managing the operation and maintenance of Optical Fiber and Last Mile (Copper) Network.

Key role in the cable laying project between MDF to SWITCH ROOM.

Instrumental in managing the In-Building Ducting (IBD) with various equipments like ODF, IDF, etc.

Received the Best Employee Award for outstanding performance.

Commissioning faults of both Copper and fiber networks resolved.

Aerial Optical Fiber cabling works for high value customers supervised and completed.

Proper site deployment done for both project and maintenance works (Both Fiber and Copper).

Trainings Attended

Ø  Ten Days Training on OFAN I,II III Installation

Ø  Huawei NGN C-5 Operation and Maintenance at HUAWEI.

Ø  Optical Fiber Training at HUAWEI

Ø  CORNING Optical Fiber Termination Equipment.

Ø  Cable Structure & Quality assurance Training at Huawei

Ø  Basics of Optical Fiber and Data Communication.

Ø  Fundamentals of Computer Networks.

Ø  MSAG, ONU, DSLAM, Installation Operation and Maintenance.

Ø  Five days Training on ADSL,IPTV, Configuration, Commissioning

IT Skills

Ø  Networking, TCP IP, Switches, CCNA WIN 98/2000/XP.

Academics

2009 BE (Electronics) Dawood University of Engineering & Technology Karachi