Economic Evaluation of proposed Barwah-Dhamnod Toll Road

byDr.(Mrs.)Vandana Tare (Professor, Deptt. of Civil Engg. S.G.S.I.T.S., Indore (M.P), ), and Er. Raj Mohammad Khan (M.E. (Civil) Transportation Engg., Indore (M.P), )

ABSTRACT

Road Traffic has been growing with very rapid rate, hence the traffic intensity and volume on the road is high. The present road network is necessary to improve to accommodate the future traffic and to provide the good riding quality. The development of Infrastructure has been done by the public sector through the fund collected from taxes, but huge fund are required for modernization of road network. Due to decreasing financial resources, government is not in position to invest the funds in those developments. This has brought to focus the need of attracting private investment in road in India.

The Barwah-Dhamnod road is proposed on B.O.T. system, starts from Barwah on Indore-Khandwa Road SH-27 and passing through Mandleshwar and joining NH-3 at Dhamnod. The total length of the road is 63 Kms and road passes through the districts of Khargon and Dhar. The details of road sectionBarwah-Dhamnod Road under study were collected through road inventory survey. The Traffic volume survey & Willingness to pay survey were also conducted on this road. The analysis of traffic volume data was done by projection up to 15 years. The need for widening of road from single lane to two lane is justified as per the capacity of road. Based on the data collection to achieve the toll fixation rates & to estimate the concession period, a methodology is adopted which includes generation of different module. Each module calculates the required results.

1-Introduction

Road Traffic has been growing with very rapid rate i.e. 8 % per annum, hence the traffic intensity and volume on the road is high. The present road network is necessary to improve to accommodate the future traffic and to provide the good riding quality. The development of Infrastructure has been done by the public sector through the fund collected from taxes, but huge fund are required for modernization of road network.

Due to decreasing financial resources, government is not in position to invest the funds in those developments. This has brought to focus the need of attracting private investment in road in India. The funds provided by private sector for improvement of road condition are recovered from road user by toll tax. After recovery period that particular road section is transferred to government. This Idea is called as BOT system.

2-Details of Road under study

Barwah-Dhamnod Road starts from Barwah on Indore-Khandwa Road SH-27 and passing through Mandleshwar and joining NH-3 at Dhamnod. The total length of this road is about 63 Kms and passes through the districts of Khargon and Dhar and having mainly plain terrain with some sections in rolling terrain. Table 1 gives details of roads intersect the proposed road at locations as under:

Table1: Details of Major road Crossing Proposed Road Section

Kms / Roads
Km 0 / SH-27 from Indore to Khandwa at km 60+200 at Barwaha
Km 26 / MDR to Balwara
Km 40+800 / SH-1 from Mhow to Mandleshwar at Mandleshwar with km 0
Km 49+200 / MDR to Mehatwara at Maheshwar
Km 63 / Joins NH-3 at Km 77+200 at Dhamnod

2.1-Crust Details

The details of road section Barwah-Dhamnod Road under study were collected through Test Pit. Existing Crust Composition on present road had found as follows.

2.2-Road Inventory Survey

The details of road section were collected through road inventory survey. In this survey details of Terrain classification, land use, villages, Formation width, Carriageway type-width- condition of road, Details of cross roads, Tree distance No. of Trees etc. has been collected for every kms.

2.3-Traffic Volume Survey

Traffic Volume survey was carried out at Km 2 near Barwah to know the volume of various categories of vehicles plying on the road. Format for Traffic Volume survey is also prepared. Table 2 gives the details of Traffic volume Survey in terms of Average Daily Traffic (ADT).

Table 2 : Average Daily Traffic at location km 2

2.4-Willingness to Pay (WTP) Survey

Willingness to pay survey was also done on the Barwah Dhamnod Road to know the opinion of road users. The survey result reveals that if the road is made two lanes, the traffic from other roads: Balwara road, Mhow to Mandleshwar road, Mehatwara to Maheshwar road will be diverted to this road. Apart from this there will also be some generated traffic. The survey also indicated that if the road is made two lanes then road users would like to pay reasonable toll.

2.5-Benkelman Beam Deflection Study

The Benkelman Beam Deflection test is done on the selected sites & the deflection evaluated for all the point. Characteristic deflection as evaluated from BBD Test comes out to be 1.427mm

3-Methodology Adopted

Based on the data collection as given above, to achieve the toll fixation rates & to estimate the concession period, a methodology is adopted which includes generation of different module. Each module calculates the required results. Following modules have been developed

Module1: TRFFRCS Module 2: OVLYDES Module 3: WIDDES

Module4: COSTANAL Module5: ECONANAL Module 6: TOLLFIX

Module –1 TRFFRCS

In this Module traffic volume has been projected for Badwah Dhamnod Road for the year 2006 considering growth rate 7.5 % per year as per the IRC guideline. Result shows that after 15 years the traffic is projected up to 16000 PCU per day.

Table 3 : Traffic Projections

Year / Mini Bus / Bus / Car/Jeep/Van / Two Wheeler / Auto Rickshaw / LCV / 2 Axle Truck / 3 Axle Truck / Multi Axle Truck / Tractor with Trailer / Tractor / Cycle / Cycle Rickshaw / Hand Cart / Animal Drawn(Cart) / ADT / PCU
2006 / 61 / 101 / 454 / 2290 / 68 / 110 / 202 / 41 / 4 / 85 / 22 / 942 / 1 / 7 / 202 / 4594 / 5545
2010 / 82 / 135 / 606 / 3058 / 90 / 148 / 270 / 55 / 5 / 114 / 29 / 1257 / 1 / 10 / 269 / 6135 / 7405
2014 / 110 / 180 / 810 / 4084 / 121 / 197 / 360 / 74 / 7 / 152 / 39 / 1679 / 1 / 13 / 360 / 8194 / 9890
2018 / 146 / 240 / 1081 / 5454 / 161 / 263 / 481 / 99 / 9 / 202 / 52 / 2243 / 2 / 18 / 481 / 10942 / 13207
2020 / 169 / 278 / 1250 / 6303 / 186 / 304 / 556 / 114 / 10 / 234 / 60 / 2592 / 2 / 20 / 555 / 12645 / 15263
2021 / 182 / 299 / 1343 / 6776 / 200 / 327 / 597 / 123 / 11 / 252 / 65 / 2786 / 2 / 22 / 597 / 13594 / 16408

Calculation of Cumulative Million Standard Axles (CMSA): CMSA have been calculated by considering following parameter:

  1. Growth rate :7.5 %
  2. VDF for plain terrain : 3.5
  3. Lane Distribution factor :75 %
  4. Directional Distribution Factor:100 %

The result for calculation of CMSA for different type of commercial vehicles is found to be 10 MSA.

Fig.1 Traffic Projection for next 20 years

Module 2 OVLYDES

In this module overlay design for the road section has been done. deflection evaluated for all the point. The average of Characteristic deflection (1.247 mm) of all the point has been taken for the design of overlay using MSA is 10. Based on the Benkelman Beam survey data following design thickness have been recommended for overlay of Badwah Dhamnod Road.

Module 3 WIDDES

In this Module Design of widening has been done. In the road inventory survey it is found that at some portion central widening is needed due to inadequate ROW & at some portion side widening can be adopted.Design for widening portion has been done as per IRC: 37-2001 & the recommended crust thickness for MSA 10 & CBR 7 % are given below:

Module 4 COSTANAL

In this module cost analysis has been done for the entire project on the basis of overlay & widening design as per the rate from MPPWD SOR April 2007. The cost comes out to be Rs 80 lakhs per Km.

1Module 05 : ECONANAL

In this module Economic Analysis for the proposed road has been done. The construction of roads brings about a variety of benefits that are enjoyed practically by all sectors of the economy. Scarcity of resources and competing demands from various sectors are the important features of a developing economy. It, therefore, becomes necessary to allocate the scarce resources in the most beneficial manner. In view of above, it is necessary to ensure that the projects selected for investment are thoroughly evaluated to determine the economic and social benefits offered by the project and the ease with which the project can be implemented. The economic analysis involves comparison of project costs and benefits under the "with" and “without" project conditions and determining the Economic Internal Rate of Return (EIRR) of the project using discounted cash flow technique. This shows the return, which the society could expect from the proposed investment during the project life, i.e. analysis period.

  • Inputs parameter

The main aim to carry out economic feasibility is maximizing the returns on investment by determining improvement proposals that lead to minimum total transport costs. Economic evaluation is carried out based on incremental costs and benefits comparing the total net benefits in “Do Minimum” situation with “With Project” situation. The term “Do Minimum” is defined as the base strategy for economic analysis i.e. without project situation. The term “With Project” is defined as widening and strengthening of road. All costs for the economic analysis are given in economic terms thus ignoring transfers in the form of taxes and duties. Basic inputs to the model are

Analysis period20 years

Discount rate 12 %

Construction Period2 years

Improved Road to be opened to traffic in 2009

Economic Internal Rate of Return (EIRR) for 20 years have been computed with the above discussed parameters for the road section is 21 % & and the Net Present Value (NPV) is 10949.

Module: 06 TOLLFIX

In this module the toll rate has been fixed for the proposed Badwah Dhamnod Road which will be applicable just after the construction period ends & toll started. Toll rates on per km basis for proposed Barwah Dhamnod Road ( 63 KM) are given below. These rates are to be revised as 7 % increase per year for the 20 year concession period. Figure for the above rate analysis is given as follows:

Table 3.3 Toll Rates

Sr. No. / Description / Toll Rates in Rs. per km / Toll Rates in Rs. for proposed road.
1 / Private Car , Jeep / 0.25 / 16
2 / LCV / 0.60 / 38
3 / Empty & Loaded Bus / 1.25 / 79
4 / Empty & Loaded Truck / 1.50 / 95
5 / Multi Axle Truck Trailer / 3.00 / 189

4-Conclusions

  1. The traffic 5545 PCU/day in the year 2006 is exceeding the capacity of single lane i.e. 2000 PCU per day. Hence there is a need to widen the road. The present traffic is also exceeding the capacity of Intermediate lane i.e. 5000 PCU/day. Hence the road is to be widened up to two lanes.
  2. The result of economic evaluation shows that Internal Rate of Return for the road is more than the required discount rate of 12%. The Net Present Value is also positive, so it can be concluded that the road is economically viable for the proposed up gradation & improvements.
  3. The Concession period & toll rates have been proposed for the toll road.
  4. The developed modules may be used for dealing with similar type of projects

References

  1. LinFeng-Bor (1994) “Level-of-Service Analysis of Toll Plazas on Freeway Main Lines” ASCE, Journal of Transportation Engg., Volume 120, Issue 2, pp. 246-263
  2. TiongRobert L. K. (1995) “Competitive Advantage of Equity in BOT” ASCE, Journal of Construction. Engg. and Management., Volume 121, Issue 3, pp. 282-289
  3. Al-DeekH. M. ,MohamedA. A., RadwanA. E. (1997) “Operational Benefits of Electronic Toll Collection: Case Study” ASCE, Journal of Transportation Engg., Volume 123, Issue 6, pp. 467-477
  4. NgeeLoh, Robert L. K. Tiong, Jahidul Alum (1997) “Automated Approach to Negotiation of BOT Contracts” ASCE, Journal of Construction. Engg. and Management Volume 11, Issue 2, pp. 121-128
  5. Esther Malini (1998)5 “Build Operate TransferMunicipalBridge Project In India.”Journal of Indian Road Congress Vol. 58 issue 1 pp 87-123 IRC
  6. Kumaraswamy Mohan M. (2001) “Procurement Protocols for Public-Private Partnered Projects” ASCE, Journal of Construction. Engg. and Management., Volume 127, Issue 5, pp. 351-358
  7. Klodzinski jack and Haitham M. Al-Deek (2002) “New Methodology for Defining Level of Service at Toll Plazas” ASCE, Journal of Transportation Engg., Volume 128, Issue 2, pp. 173-181
  8. Anathanarayanan K. (2003) “Risk factor & Management for BOT Road Project in India”. Indian Highway Vol.31 No.12 PP.53-75
  9. BurrisMark W. (2003) Application of Variable Tolls on Congested Toll Road ASCE, Journal of Transportation Engg., Volume 129, Issue 4, pp. 354-361
  10. Chouhan Sonia (2004) “Evaluation of BOT Project on Highway Sector” , Indian Highway Vol.9 No.11 PP 44-48 ASCE,
  11. Wibowo Andreas (2005) “Financial Risk Analysis of Project Finance in Indian Toll Roads” ASCE, Journal of Construction. Engg. and Management., Volume 131, Issue 9, pp. 963-972 ASCE,