Update Instructions for 2006-4 Publication

National Master Specification

Update Instructions For 2006-4 Publication

9/30/06

Section No / Title / Status
01 33 00 / SUBMITTAL PROCEDURES / Updated
01 45 00 / QUALITY CONTROL / Updated
01 74 21 / CONSTRUCTION/DEMOLITION WASTE MANAGEMENT AND DISPOSAL / Updated
03 10 00 / CONCRETE FORMING AND ACCESSORIES / Updated
03 20 00 / CONCRETE REINFORCING / Updated
03 30 00 / CAST-IN-PLACE CONCRETE / Updated
03 30 05 / CAST-IN-PLACE CONCRETE SHORT FORM / Updated
03 30 51 / CONCRETE FOR BRIDGE DECKS / Updated
04 05 00 / COMMON WORK RESULTS FOR MASONRY / Replaces 04 05 10
04 05 10 / COMMON WORK RESULTS FOR MASONRY / Deleted
04 21 19 / CLAY TILE MASONRY / Updated
06 10 00 / ROUGH CARPENTRY / Replaces 06 10 10
06 10 10 / ROUGH CARPENTRY / Deleted
07 16 19 / METAL OXIDE WATERPROOFING / Updated
08 14 10 / FLUSH WOOD DOORS / Deleted
08 14 16 / FLUSH WOOD DOORS / Replaces 08 14 10
08 50 00 / WINDOWS / Replaces 08 50 50
08 50 50 / WINDOWS / Deleted
09 91 99 / PAINTING FOR MINOR WORKS / Added New
10 14 53 / TRAFFIC SIGNAGE / Replaces 10 14 54
10 14 54 / TRAFFIC SIGNAGE / Deleted
11 12 00 / PARKING CONTROL EQUIPMENT / Replaces 11 12 10
11 12 10 / PARKING CONTROL EQUIPMENT / Deleted
23 05 19 / METERS AND GAUGES FOR HVAC PIPING / Replaces 23 05 20
23 05 20 / METERS AND GAUGES FOR HVAC PIPING / Deleted
26 05 00 / COMMON WORK RESULTS - FOR ELECTRICAL / Updated
26 05 36 / CABLE TRAYS FOR ELECTRICAL SYSTEMS / Updated
26 05 80 / FRACTIONAL HORSEPOWER MOTORS / Updated
26 24 19 / MOTOR CONTROL CENTRES / Updated
27 10 05 / STRUCTURED CABLING FOR COMMUNICATIONS SYSTEMS / Added New
31 03 31 / HISTORIC - SUBGRADE SHORING AND BRACING / Deleted
31 04 31 / HISTORIC - SUBGRADE SHORING AND BRACING / Replaces 31 03 31
31 09 17 / PILE TESTS / Updated
31 23 10 / EXCAVATING, TRENCHING AND BACKFILLING / Updated
31 32 14 / LIME SOIL STABILIZATION / Updated
31 36 00 / GABIONS / Replaces 31 36 10
31 36 10 / GABIONS / Deleted
31 37 00 / RIP-RAP / Replaces 31 37 10
31 37 10 / RIP-RAP / Deleted
31 53 13 / TIMBER CRIBWORK / Updated
31 61 13 / PILE FOUNDATIONS, GENERAL REQUIREMENTS / Updated
31 62 15 / STEEL SHEET PILE CELLS / Updated
31 63 18 / ROCK SOCKETS FOR PILES / Updated
32 11 17 / RESHAPING GRANULAR ROADBED / Replaces 32 15 10
32 13 10 / UNIT PAVING ON SAND BED / Deleted
32 14 10 / UNIT PAVING ON SAND BED / Replaces 32 13 10
32 15 10 / RESHAPING GRANULAR SUBBASE / Deleted
32 91 21 / TOPSOIL PLACEMENT AND GRADING / Updated
32 91 23 / CHEMICAL CONTROL OF VEGETATION / Updated
34 43 24 / ROTATING BEACONS / Updated
35 31 19 / REVETMENTS / Updated

1