UNOFFICIAL COPY AS OF 10/27/1800 REG. SESS.00 RS BR 2224
A JOINT RESOLUTION establishing the additional four (4) year highway construction plan outlined in the Recommended FY 2001 - FY 2006 Six Year Road Plan presented to the 2000 General Assembly.
WHEREAS, the statutes of the Commonwealth require a highway construction plan to be presented to the General Assembly that details those projects that will be presented for construction by the Department of Highways in future years; and
WHEREAS, the General Assembly recognizes the importance of planning and the assurance that once projects are initiated that they are completed; and
WHEREAS, in previous years shifting of projects has diminished the confidence of the General Assembly and the public that roads in the Six Year Road Plan will be constructed in a timely fashion; and
WHEREAS, the first major step in assuring that road projects are planned and built in a conscientious manner is to adopt projects scheduled for funding during the biennium in the budget memorandum and the projects scheduled for funding in the last four (4) years of the road plan in a joint resolution; and
WHEREAS, the General Assembly in adoption of this resolution is committed to working with the Department of Highways to develop a balanced and workable six (6) year road plan;
NOW, THEREFORE,
Be it resolved by the General Assembly of the Commonwealth of Kentucky:
Page 1 of 42
BR222400.100-2224
UNOFFICIAL COPY AS OF 10/27/1800 REG. SESS.00 RS BR 2224
Section 1. The projects authorized by the General Assembly in this Resolution constitute the official four (4) year highway construction plan outlined in the Recommended FY 2001 - FY 2006 Six Year Road Plan presented to the 1998 General Assembly. The following projects shall be the 2001-2006 additional four (4) year highway construction plan with project phases not scheduled for completion until after Fiscal Year 2000:
countyitem #routefundphaseestimateFY
ADAIR08- 159.00KY-55STP CONSTRUCTION$11,925,0002001
ADAIR08- 5005.00KY-6172SPDESIGN$35,0002002
ADAIR08- 5005.00KY-6172SP RIGHT OF WAY$10,0002003
ALLEN03- 146.11US-231STP CONSTRUCTION$7,000,0002001
ALLEN03- 146.40US-231STP RIGHT OF WAY$4,000,0002001
ALLEN03- 146.40US-231STPUTILITIES$3,500,0002002
ALLEN03- 146.41US-231STP CONSTRUCTION$8,000,0002003
ANDERSON07- 304.01US-127SP RIGHT OF WAY$1,500,0002001
ANDERSON07- 304.01US-127SPUTILITIES$1,000,0002002
ANDERSON07- 346.00KY-44STP CONSTRUCTION$2,000,0002001
ANDERSON07- 2008.00BG-9002SPDESIGN$60,0002002
ANDERSON07- 2008.00BG-9002SP CONSTRUCTION$3,750,0002004
BALLARD01- 23.00I-66NHDESIGN$500,0002002
BALLARD01- 115.00US-60SPDESIGN$750,0002003
BALLARD01- 185.00US-51NH CONSTRUCTION$2,500,0002003
BARREN03- 185.00KY-70KYD CONSTRUCTION$7,870,0002002
BARREN03- 192.01-SP RIGHT OF WAY$2,000,0002002
BARREN03- 192.01-SPUTILITIES$2,000,0002004
BARREN03- 192.20-SP CONSTRUCTION$10,000,0002001
BARREN03- 2002.00I-65IM CONSTRUCTION$2,500,0002002
BARREN03- 7000.00-SPright of way$1,200,0002001
BARREN03- 7000.00-SPutilities$800,0002002
BATH09- 127.00KY-36SPDESIGN$400,0002003
BATH09- 2001.00I-64IMDESIGN$80,0002001
BATH09- 2001.00I-64IM CONSTRUCTION$5,000,0002003
BATH09- 2002.00I-64IMDESIGN$180,0002003
BATH09- 5002.00I-64SPDESIGN$40,0002001
BATH09- 5002.00I-64SP CONSTRUCTION$400,0002002
BATH09- 5003.00I-64SPDESIGN$60,0002001
BATH09- 5003.00I-64SP CONSTRUCTION$900,0002002
BELL11- 57.00US-119NH RIGHT OF WAY$125,0002001
BELL11- 57.00US-119NHUTILITIES$60,0002001
BELL11- 57.00US-119NH CONSTRUCTION$2,000,0002002
BELL11- 135.00KY-92SPDESIGN$300,0002002
BELL11- 214.40US-25ESP CONSTRUCTION$1,250,0002001
BELL11- 214.50US-25ESP CONSTRUCTION$1,250,0002002
BELL11- 214.51US-25ESP CONSTRUCTION$1,250,0002003
BELL11- 214.52US-25ESP CONSTRUCTION$1,250,0002004
BELL11- 217.00KY-66SPDESIGN$40,0002001
BELL11- 217.00KY-66STP RIGHT OF WAY$1,500,0002003
BELL11- 1033.00KY-2013BRZ CONSTRUCTION$450,0002001
BELL11- 1034.00KY-988BRZ CONSTRUCTION$450,0002001
BELL11- 1044.00CR-1212BRZ CONSTRUCTION$250,0002001
BELL11- 1050.00KY-1491BRX RIGHT OF WAY$52,0002002
BELL11- 1050.00KY-1491BRXUTILITIES$10,0002002
BOONE06- 12.23I-275IM CONSTRUCTION$2,000,0002001
BOONE06- 64.01US-42STPUTILITIES$1,550,0002001
BOONE06- 64.01US-42STP CONSTRUCTION$8,000,0002002
BOONE06- 101.00KY-536SAF CONSTRUCTION$3,600,0002001
BOONE06- 116.00-SP CONSTRUCTION$1,400,0002001
BOONE06- 146.00-SP CONSTRUCTION$500,0002001
BOONE06- 316.01KY-1017SP RIGHT OF WAY$1,500,0002001
BOONE06- 316.01KY-1017SPUTILITIES$1,000,0002003
BOONE06- 331.01-CM CONSTRUCTION$500,0002001
BOONE06- 331.02-CM CONSTRUCTION$1,700,0002004
BOONE06- 351.00US-25STPDESIGN$750,0002002
BOONE06- 351.00US-25STP RIGHT OF WAY$2,000,0002004
BOONE06- 1039.00-CM CONSTRUCTION$50,0002001
BOONE06- 1044.02-CM CONSTRUCTION$1,250,0002001
BOONE06- 1044.03-CM CONSTRUCTION$1,500,0002002
BOONE06- 1044.04-CM CONSTRUCTION$1,700,0002003
BOONE06- 1044.05-CM CONSTRUCTION$1,500,0002004
BOONE06- 2002.00I-275IM CONSTRUCTION$12,100,0002001
BOONE06- 2004.00I-71IM CONSTRUCTION$2,600,0002001
BOONE06- 5001.00US-42SP CONSTRUCTION$512,5002001
BOURBON07- 310.01US-68NH CONSTRUCTION$14,000,0002001
BOURBON07- 310.02US-68NH CONSTRUCTION$8,000,0002001
BOURBON07- 310.03US-68NH CONSTRUCTION$4,000,0002002
BOYD09- 112.00US-23SNH CONSTRUCTION$2,000,0002004
BOYD09- 129.00-STPDESIGN$1,000,0002001
BOYD09- 141.00KY-5SPDESIGN$300,0002004
BOYD09- 176.00US-23NHUTILITIES$100,0002001
BOYD09- 176.00US-23NH CONSTRUCTION$720,0002002
BOYD09- 212.31-SP CONSTRUCTION$5,000,0002004
BOYD09- 275.00US-60STP CONSTRUCTION$2,900,0002001
BOYD09- 5005.00US-23SPDESIGN$50,0002002
BOYD09- 5005.00US-23SP RIGHT OF WAY$15,0002003
BOYD09- 5005.00US-23SPUTILITIES$20,0002003
BOYLE07- 210.00KY-2168SPDESIGN$600,0002002
BOYLE07- 210.00KY-2168SP RIGHT OF WAY$3,600,0002004
BOYLE07- 211.00US-150BSP RIGHT OF WAY$800,0002002
BOYLE07- 211.00US-150BSPUTILITIES$300,0002003
BRACKEN06- 355.03-SP CONSTRUCTION$125,0002001
BRACKEN06- 355.04-SP CONSTRUCTION$125,0002002
BRACKEN06- 355.05-SP CONSTRUCTION$125,0002003
BRACKEN06- 355.06-SP CONSTRUCTION$125,0002004
BREATHITT10- 270.11KY-15NH CONSTRUCTION$4,000,0002002
BREATHITT10- 270.12KY-15NH CONSTRUCTION$9,000,0002003
BREATHITT10- 270.20KY-15SPUTILITIES$1,500,0002001
BREATHITT10- 285.01KY-15NH RIGHT OF WAY$7,310,0002001
BREATHITT10- 285.01KY-15NHUTILITIES$925,0002003
BREATHITT10- 286.01KY-15NH RIGHT OF WAY$10,500,0002001
BREATHITT10- 286.01KY-15NHUTILITIES$1,700,0002003
BREATHITT10- 5007.00KY-1812SPDESIGN$100,0002003
BREATHITT10- 5007.00KY-1812SP RIGHT OF WAY$40,0002004
BRECKINRIDGE 04- 1048.00KY-992BRX CONSTRUCTION$300,000 2002
BULLITT05- 117.00KY-61STP RIGHT OF WAY$5,000,0002001
BULLITT05- 117.00KY-61STPUTILITIES$2,000,0002003
BULLITT05- 117.00KY-61STP CONSTRUCTION$10,000,0002004
BULLITT05- 347.50KY-44STPDESIGN$1,000,0002004
BULLITT05- 2008.00I-65IM CONSTRUCTION$600,0002002
BULLITT05- 5004.00KY-44SPDESIGN$65,0002001
BULLITT05- 5004.00KY-44SP RIGHT OF WAY$75,0002002
BULLITT05- 5004.00KY-44SP CONSTRUCTION$500,0002003
BUTLER03- 5000.00US-231SP CONSTRUCTION$180,0002002
CALDWELL02- 2011.00WK-9001SPDESIGN$70,0002003
CALDWELL02- 2011.00WK-9001SP CONSTRUCTION$4,000,0002004
CALDWELL02- 5005.00WK-9001SP RIGHT OF WAY$50,0002001
CALDWELL02- 5005.00WK-9001SPUTILITIES$10,0002001
CALDWELL02- 5005.00WK-9001SP CONSTRUCTION$1,100,0002002
CALLOWAY01- 181.11US-68SP CONSTRUCTION$16,000,0002001
CALLOWAY01- 181.14US-68SP CONSTRUCTION$16,000,0002002
CALLOWAY01- 181.21KY-80SPUTILITIES$1,210,0002002
CALLOWAY01- 181.22KY-80SPUTILITIES$3,300,0002002
CALLOWAY01- 181.22KY-80SP CONSTRUCTION$6,000,0002004
CALLOWAY01- 181.30KY-80SPUTILITIES$2,870,0002001
CALLOWAY01- 181.30KY-80SP CONSTRUCTION$12,000,0002003
CALLOWAY01- 181.31KY-80SPUTILITIES$3,300,0002001
CALLOWAY01- 181.31KY-80SP CONSTRUCTION$6,000,0002003
CALLOWAY01- 181.35KY-80SP CONSTRUCTION$14,000,0002004
CALLOWAY01- 314.00US-641SPDESIGN$1,800,0002002
CALLOWAY01- 1127.00KY-280BRX CONSTRUCTION$450,0002002
CALLOWAY01- 1128.00KY-1824BRX RIGHT OF WAY$55,0002001
CALLOWAY01- 1128.00KY-1824BRXUTILITIES$200,0002002
CALLOWAY01- 1128.00KY-1824BRX CONSTRUCTION$700,0002003
CALLOWAY01- 1129.00KY-1824BRX RIGHT OF WAY$55,0002001
CALLOWAY01- 1129.00KY-1824BRXUTILITIES$200,0002002
CALLOWAY01- 1129.00KY-1824BRX CONSTRUCTION$1,000,0002003
CAMPBELL06- 6.00I-471IM CONSTRUCTION$3,000,0002002
CAMPBELL06- 46.20US-27SP CONSTRUCTION$12,000,0002002
CAMPBELL06- 125.00KY-2938SPDESIGN$600,0002003
CAMPBELL06- 352.00KY-536SPDESIGN$600,0002001
CAMPBELL06- 352.00KY-536STP RIGHT OF WAY$7,000,0002003
CAMPBELL06- 1029.00KY-1120BROUTILITIES$500,0002001
CAMPBELL06- 1029.00KY-1120BRO CONSTRUCTION$2,800,0002002
CAMPBELL06- 5003.00KY-8SP RIGHT OF WAY$100,0002002
CAMPBELL06- 5003.00KY-8SP CONSTRUCTION$3,000,0002003
CAMPBELL06- 5004.00I-275SPDESIGN$180,0002001
CAMPBELL06- 5004.00I-275SP CONSTRUCTION$1,500,0002002
CAMPBELL06- 5005.00I-275SPDESIGN$210,0002001
CAMPBELL06- 5005.00I-275NH CONSTRUCTION$1,750,0002002
CAMPBELL06- 5006.00I-471SPDESIGN$100,0002001
CAMPBELL06- 5006.00I-471SP CONSTRUCTION$1,000,0002002
CARLISLE01- 183.00US-51STPDESIGN$600,0002002
CARLISLE01- 1119.00US-62BRO RIGHT OF WAY$150,0002001
CARLISLE01- 1119.00US-62BROUTILITIES$160,0002001
CARLISLE01- 1119.00US-62BRO CONSTRUCTION$600,0002003
CARROLL06- 12.25I-71IM CONSTRUCTION$700,0002001
CARROLL06- 147.00US-42SP CONSTRUCTION$5,000,0002001
CARROLL06- 347.00KY-389BRX RIGHT OF WAY$100,0002001
CARROLL06- 347.00KY-389BRXUTILITIES$75,0002001
CARROLL06- 347.00KY-389BRX CONSTRUCTION$850,0002002
CARROLL06- 5009.00I-71SPDESIGN$90,0002003
CARTER09- 144.00-SPDESIGN$225,0002003
CARTER09- 159.00US-60STPUTILITIES$300,0002001
CARTER09- 159.00US-60STP CONSTRUCTION$3,375,0002003
CARTER09- 1041.00KY-1947BRX RIGHT OF WAY$50,0002001
CARTER09- 1041.00KY-1947BRXUTILITIES$45,0002001
CARTER09- 1041.00KY-1947BRX CONSTRUCTION$345,0002003
CARTER09- 2003.00I-64IMDESIGN$50,0002004
CARTER09- 5004.00US-60SPDESIGN$65,0002001
CARTER09- 5004.00US-60SP RIGHT OF WAY$20,0002002
CARTER09- 5004.00US-60SPUTILITIES$40,0002002
CARTER09- 5004.00US-60SP CONSTRUCTION$800,0002003
CASEY08- 142.00KY-70SPDESIGN$500,0002004
CASEY08- 164.00US-127STPDESIGN$150,0002001
CASEY08- 164.00US-127STP RIGHT OF WAY$200,0002002
CASEY08- 164.00US-127STPUTILITIES$100,0002002
CASEY08- 164.00US-127STP CONSTRUCTION$600,0002003
CASEY08- 5002.00US-127SPDESIGN$50,0002001
CASEY08- 5002.00US-127SP RIGHT OF WAY$12,0002002
CASEY08- 5002.00US-127SP CONSTRUCTION$280,0002002
CHRISTIAN02- 100.00PE-9004NH RIGHT OF WAY$5,000,0002002
CHRISTIAN02- 100.00PE-9004NHUTILITIES$2,000,0002003
CHRISTIAN02- 100.00PE-9004NH CONSTRUCTION$19,000,0002004
CHRISTIAN02- 213.00I-24IMDESIGN$500,0002001
CHRISTIAN02- 213.00I-24IM RIGHT OF WAY$1,000,0002003
CHRISTIAN02- 213.00I-24IMUTILITIES$750,0002004
CHRISTIAN02- 308.00US-41ANH CONSTRUCTION$10,000,0002001
CHRISTIAN02- 311.00us-41aNH CONSTRUCTION$11,000,0002002
CHRISTIAN02- 311.01UA-41aNHUTILITIES$2,000,0002001
CHRISTIAN02- 2000.00I-24IM CONSTRUCTION$2,500,0002002
CHRISTIAN02- 7000.00-SP CONSTRUCTION$8,000,0002001
CHRISTIAN02- 7010.00-SP CONSTRUCTION$2,000,0002001
CLARK07- 314.00KY-1958SPDESIGN$200,0002003
CLARK07- 331.01-SP RIGHT OF WAY$3,000,0002001
CLARK07- 331.01-SPUTILITIES$2,635,0002002
CLARK07- 331.01-SP CONSTRUCTION$10,000,0002003
CLARK07- 1080.00CR-1210BRZ CONSTRUCTION$350,0002001
CLARK07- 2001.00I-64IM CONSTRUCTION$2,000,0002002
CLARK07- 2002.00I-64IM CONSTRUCTION$3,100,0002002
CLARK07- 2010.00KY-9000SPDESIGN$150,0002003
CLARK07- 2010.00KY-9000SP CONSTRUCTION$7,360,0002004
CLAY11- 273.01US-421SP RIGHT OF WAY$5,600,0002002
CLAY11- 273.01US-421SPUTILITIES$2,700,0002004
CLAY11- 1035.00US-421BRO CONSTRUCTION$800,0002002
CLAY11- 2005.00DB-9006SPDESIGN$90,0002002
CLAY11- 2006.00DB-9006SPDESIGN$50,0002002
CLAY11- 2006.00DB-9006SP CONSTRUCTION$5,000,0002003
CLAY11- 4087.00CR-1118SP CONSTRUCTION$800,0002001
CLAY11- 5000.00KY-11SP RIGHT OF WAY$10,0002001
CLAY11- 5000.00KY-11SPUTILITIES$10,0002001
CLAY11- 5000.00KY-11SP CONSTRUCTION$420,5002002
CLAY11- 5005.00KY-66SPDESIGN$80,0002003
CLAY11- 5005.00KY-66SP RIGHT OF WAY$20,0002004
clay11- 5005.00KY-66SPutilities$20,0002004
CLAY11- 5006.00KY-80SPDESIGN$50,0002004
CLINTON08- 165.00US-127SPutilities$2,500,0002001
CLINTON08- 165.00US-127SPconstruction$7,000,0002002
CLINTON08- 260.02US-127SP CONSTRUCTION$7,000,0002001
CLINTON08- 260.10US-127STP RIGHT OF WAY$2,500,0002001
CLINTON08- 260.10US-127STPUTILITIES$3,000,0002003
CLINTON08- 260.10US-127STP CONSTRUCTION$8,500,0002004
CLINTON08- 1015.00KY-1076BRX RIGHT OF WAY$250,0002003
CLINTON08- 1015.00KY-1076BRXUTILITIES$150,0002004
CRITTENDEN01- 187.00US-641SPDESIGN$400,0002001
CRITTENDEN01- 250.01US-60SP RIGHT OF WAY$2,000,0002001
CRITTENDEN01- 250.01US-60SPUTILITIES$1,000,0002002
CRITTENDEN01- 250.01US-60SP CONSTRUCTION$14,000,0002004
CRITTENDEN01- 267.01US-60SP RIGHT OF WAY$1,200,0002002
CRITTENDEN01- 267.01US-60SPUTILITIES$1,520,0002003
CRITTENDEN01- 325.00KY-91SP CONSTRUCTION$262,0002001
CRITTENDEN01- 326.00KY-91SP CONSTRUCTION$262,0002002
CRITTENDEN01- 326.01KY-91SP CONSTRUCTION$262,0002003
CRITTENDEN01- 326.02KY-91SP CONSTRUCTION$262,0002004
CUMBERLAND 08- 158.04 KY-61SP RIGHT OF WAY$8,000,000 2001
CUMBERLAND 08- 158.04 KY-61SPutilities$7,000,000 2002
DAVIESS02- 179.00US-231STP CONSTRUCTION$2,500,0002004
DAVIESS02- 221.00KY-2121SPDESIGN$750,0002002
DAVIESS02- 221.00KY-2121SP RIGHT OF WAY$780,0002004
DAVIESS02- 287.00US-60STP RIGHT OF WAY$4,000,0002003
DAVIESS02- 287.00US-60STPUTILITIES$2,500,0002004
DAVIESS02- 2012.00US-60BSP CONSTRUCTION$3,600,0002001
EDMONSON03- 140.00KY-101SP RIGHT OF WAY$750,0002002
EDMONSON03- 140.00KY-101SPUTILITIES$500,0002002
EDMONSON03- 140.00KY-101SP CONSTRUCTION$5,000,0002004
EDMONSON03- 141.00KY-70SP RIGHT OF WAY$300,0002001
EDMONSON03- 141.00KY-70SPUTILITIES$200,0002001
EDMONSON03- 141.00KY-70SP CONSTRUCTION$2,000,0002002
EDMONSON03-7010.00KY-259SPDESIGN$300,0002002
EDMONSON03-7010.00KY-259SPright of way$400,0002003
EDMONSON03-7030.00KY-259SPDESIGN$6,300,0002003
ELLIOTT09- 126.00KY-7SP RIGHT OF WAY$2,000,0002001
ELLIOTT09- 126.00KY-7SPUTILITIES$850,0002001
ELLIOTT09- 126.00KY-7SP CONSTRUCTION$8,000,0002002
ELLIOTT09- 126.50KY-7STP RIGHT OF WAY$3,500,0002001
ELLIOTT09- 126.50KY-7STPUTILITIES$1,000,0002002
ELLIOTT09- 293.01KY-7SPDESIGN$400,0002002
ELLIOTT09- 293.01KY-7SP RIGHT OF WAY$1,000,0002004
ELLIOTT09- 293.01KY-7SPUTILITIES$750,0002004
ELLIOTT09- 1039.00KY-706BRX RIGHT OF WAY$20,0002001
ELLIOTT09- 1039.00KY-706BRXUTILITIES$20,0002001
ELLIOTT09- 1039.00KY-706BRX CONSTRUCTION$230,0002002
ESTILL10- 363.00KY-89SP RIGHT OF WAY$2,200,0002001
ESTILL10- 363.00KY-89SPUTILITIES$1,000,0002003
ESTILL10- 364.00KY-82SP RIGHT OF WAY$100,0002002
ESTILL10- 364.00KY-82SPUTILITIES$100,0002002
ESTILL10- 364.00KY-82SP CONSTRUCTION$800,0002004
ESTILL10- 1040.00KY-594BRX RIGHT OF WAY$100,0002001
ESTILL10- 1040.00KY-594BRXUTILITIES$75,0002001
ESTILL10- 1040.00KY-594BRX CONSTRUCTION$250,0002002
ESTILL10- 1045.00CR-5323BRZ CONSTRUCTION$275,0002001
ESTILL10- 1053.00KY-594BRX CONSTRUCTION$150,0002001
ESTILL10- 5001.00KY-89SP CONSTRUCTION$262,7002001
FAYETTE07- 122.00US-25STP RIGHT OF WAY$4,300,0002001
FAYETTE07- 122.00US-25STPUTILITIES$3,000,0002002
FAYETTE07- 125.20KY-4STPDESIGN$200,0002003
FAYETTE07- 144.00US-68SPDESIGN$400,0002004
FAYETTE07- 325.01US-25SPUTILITIES$3,090,0002001
FAYETTE07- 325.01US-25SP CONSTRUCTION$2,500,0002002
FAYETTE07- 329.00KY-922STP CONSTRUCTION$9,200,0002003
FAYETTE07- 356.00KY-169SP CONSTRUCTION$125,0002001
FAYETTE07- 357.00KY-169SP CONSTRUCTION$125,0002002
FAYETTE07- 357.01KY-169SP CONSTRUCTION$125,0002003
FAYETTE07- 357.02KY-169SP CONSTRUCTION$125,0002004
FAYETTE07- 362.00KY-4STPDESIGN$250,0002002
FAYETTE07- 996.05-SLX CONSTRUCTION$5,800,0002001
FAYETTE07- 996.06-SLX CONSTRUCTION$5,800,0002002
FAYETTE07- 996.07-SLX CONSTRUCTION$5,800,0002003
FAYETTE07- 996.08-SLX CONSTRUCTION$5,800,0002004
FAYETTE07- 1071.00CR-9999BRO CONSTRUCTION$715,0002001
FAYETTE07- 1088.00KY-1970BRX RIGHT OF WAY$100,0002002
FAYETTE07- 1088.00KY-1970BRXUTILITIES$40,0002002
FAYETTE07- 1088.00KY-1970BRX CONSTRUCTION$200,0002004
FAYETTE07- 5004.00US-421SPDESIGN$80,0002002
FAYETTE07- 5004.00US-421SP CONSTRUCTION$750,0002003
FLEMING09- 174.50KY-11STP RIGHT OF WAY$750,0002001
FLEMING09- 174.50KY-11STPUTILITIES$500,0002001
FLEMING09- 174.50KY-11STP CONSTRUCTION$10,500,0002003
FLOYD12- 108.00US-23SPDESIGN$150,0002004
FLOYD12- 282.00KY-122SPUTILITIES$200,0002001
FLOYD12- 282.00KY-122SP CONSTRUCTION$2,250,0002002
FLOYD12- 293.00KY-1428STP CONSTRUCTION$3,000,0002001
FLOYD12- 301.00KY-979SPUTILITIES$2,000,0002001
FLOYD12- 301.00KY-979SP CONSTRUCTION$11,000,0002003
FLOYD12- 301.10KY-680SP RIGHT OF WAY$3,500,0002001
FLOYD12- 301.10KY-680SPUTILITIES$3,500,0002001
FLOYD12- 301.20KY-979SPDESIGN$1,200,0002002
FLOYD12- 301.20KY-979SP RIGHT OF WAY$3,500,0002003
FLOYD12- 402.00KY-3384SP CONSTRUCTION$2,100,0002001
FLOYD12- 1039.00KY-550BRO CONSTRUCTION$1,000,0002002
FLOYD12- 1040.00KY-1428BRX CONSTRUCTION$1,000,0002001
FLOYD12- 1041.00KY-1428BRX CONSTRUCTION$1,000,0002001
FLOYD12- 1047.00CR-1390BRZ CONSTRUCTION$600,0002001
FLOYD12- 1060.00CR-1265BRZDESIGN$100,0002001
FLOYD12- 1060.00CR-1265BRZ RIGHT OF WAY$60,0002003
FLOYD12- 1060.00CR-1265BRZUTILITIES$200,0002003
FLOYD12- 5004.00KY-80SP RIGHT OF WAY$20,0002001
FLOYD12- 5004.00KY-80SP CONSTRUCTION$800,0002002
FLOYD12- 5007.00KY-80SPDESIGN$210,0002002
FLOYD12- 5007.00KY-80SP RIGHT OF WAY$45,0002003
FLOYD12- 5009.00KY-321SPDESIGN$200,0002004
FRANKLIN05- 97.50US-60STP RIGHT OF WAY$800,0002002
FRANKLIN05- 97.50US-60STPUTILITIES$500,0002004
FRANKLIN05- 305.01US-421STP RIGHT OF WAY$800,0002001
FRANKLIN05- 305.01US-421STPUTILITIES$600,0002003
FRANKLIN05- 305.01US-421STP CONSTRUCTION$8,000,0002004
FRANKLIN05- 372.00US-460STP RIGHT OF WAY$4,500,0002001
FRANKLIN05- 372.00US-460STPUTILITIES$1,000,0002003
FRANKLIN05- 372.00US-460STP CONSTRUCTION$11,500,0002004
FRANKLIN05- 2005.00I-64IMDESIGN$210,0002001
FRANKLIN05- 2005.00I-64IM CONSTRUCTION$13,900,0002003
FRANKLIN05- 2023.00US-60SPDESIGN$50,0002004
FRANKLIN05- 5002.00US-421SPDESIGN$80,0002001
FRANKLIN05- 5002.00US-421SP CONSTRUCTION$750,0002002
FRANKLIN05- 5007.00KY-1900SPDESIGN$60,0002004
FULTON01- 319.00KY-1354SP CONSTRUCTION$125,0002001
FULTON01- 320.00KY-1354SP CONSTRUCTION$125,0002002
FULTON01- 320.01KY-1354SP CONSTRUCTION$125,0002003
FULTON01- 320.02KY-1354SP CONSTRUCTION$125,0002004
FULTON01- 1118.00US-45BRO RIGHT OF WAY$200,0002001
FULTON01- 1118.00US-45BROUTILITIES$605,0002001
FULTON01- 1118.00US-45BRO CONSTRUCTION$1,200,0002003
FULTON01- 2008.00PU-9003SP CONSTRUCTION$900,0002001
GALLATIN06- 202.00US-42SP RIGHT OF WAY$250,0002001
GALLATIN06- 202.00US-42SPUTILITIES$100,0002002
GALLATIN06- 202.00US-42SP CONSTRUCTION$5,700,0002003
GALLATIN06- 333.01-STP CONSTRUCTION$10,000,0002001
GALLATIN06- 333.02-STP CONSTRUCTION$10,000,0002004
GALLATIN06- 2005.00I-71IM CONSTRUCTION$3,300,0002004
GALLATIN06- 2006.00I-71IM CONSTRUCTION$2,000,0002004
GALLATIN06- 2007.00I-71IM CONSTRUCTION$2,000,0002004
GARRARD07- 26.01US-27NH RIGHT OF WAY$3,500,0002001
GARRARD07- 26.01US-27NHUTILITIES$1,500,0002002
GARRARD07- 26.01US-27NH CONSTRUCTION$12,000,0002003
GARRARD07- 26.02US-27NH CONSTRUCTION$4,000,0002004
GARRARD07- 302.03KY-52STP CONSTRUCTION$3,800,0002002
GARRARD07- 302.04KY-52STP CONSTRUCTION$7,453,0002001
GRANT06- 72.02I-75IM CONSTRUCTION$12,000,0002001
GRANT06- 72.03I-75NH CONSTRUCTION$9,000,0002001
GRANT06- 72.04I-75IM CONSTRUCTION$6,000,0002002
GRANT06- 72.05I-75NH CONSTRUCTION$17,000,0002002
GRANT06- 72.12I-75IM CONSTRUCTION$16,000,0002004
GRANT06- 72.13I-75NH CONSTRUCTION$10,000,0002004
GRANT06- 339.00I-75STP CONSTRUCTION$7,000,0002002
GRANT06- 345.00-SP CONSTRUCTION$9,200,0002001
GRANT06- 345.10-SPUTILITIES$250,0002001
GRANT06- 345.10-SP CONSTRUCTION$2,500,0002003
GRANT06- 5000.00US-25SP CONSTRUCTION$282,0002001
GRAYSON04- 122.00KY-259SPDESIGN$500,0002004
GRAYSON04- 193.00US-62SP RIGHT OF WAY$500,0002001
GRAYSON04- 193.00US-62SPUTILITIES$300,0002002
GRAYSON04- 193.00US-62SP CONSTRUCTION$3,000,0002004
GRAYSON04- 308.00-STPDESIGN$1,200,0002003
GRAYSON04- 1013.01KY-259STP CONSTRUCTION$10,700,0002001
GRAYSON04- 2005.00WK-9001NHDESIGN$25,0002002
GRAYSON04- 2005.00WK-9001NH CONSTRUCTION$1,200,0002003
GRAYSON04- 2008.00WK-9001STPDESIGN$70,0002003
GRAYSON04- 2008.00WK-9001STP CONSTRUCTION$4,100,0002004
GRAYSON04- 2009.00WK-9001STPDESIGN$70,0002003
GRAYSON04- 2009.00WK-9001STP CONSTRUCTION$4,000,0002004
GREEN04- 310.00-STPDESIGN$800,0002003
GREENUP09- 109.00KY-8SSTP CONSTRUCTION$2,500,0002004
GREENUP09- 132.00KY-2SPDESIGN$500,0002004
GREENUP09- 212.11-SP CONSTRUCTION$20,000,0002001
GREENUP09- 212.20-SP CONSTRUCTION$8,000,0002001
GREENUP09- 212.21-SP CONSTRUCTION$12,000,0002002
GREENUP09- 212.30-SP CONSTRUCTION$19,000,0002003
GREENUP09- 1028.00KY-503BRO CONSTRUCTION$630,0002002
GREENUP09- 1038.00KY-2541BRX RIGHT OF WAY$70,0002002
GREENUP09- 1038.00KY-2541BRXUTILITIES$30,0002002
GREENUP09- 5001.00KY-503SP RIGHT OF WAY$100,0002001
GREENUP09- 5001.00KY-503SP CONSTRUCTION$570,0002002
GREENUP09- 5006.00KY-1SPDESIGN$35,0002003
GREENUP09- 5006.00KY-1SP RIGHT OF WAY$10,0002004
GREENUP09- 5006.00KY-1SPUTILITIES$20,0002004
HANCOCK02- 125.00US-60STPDESIGN$150,0002004
HANCOCK02- 216.00CR-1102BRZDESIGN$50,0002001
HANCOCK02- 216.00CR-1102BRZ RIGHT OF WAY$50,0002003
HANCOCK02- 216.00CR-1102BRZUTILITIES$50,0002003
HANCOCK02- 216.00CR-1102BRZ CONSTRUCTION$200,0002004
HANCOCK02- 2022.00US-60SP CONSTRUCTION$1,210,0002004
HARDIN04- 189.00US-31WSP CONSTRUCTION$500,0002001
HARDIN04- 190.00US-31WSPUTILITIES$1,750,0002001
HARDIN04- 190.00US-31WSP CONSTRUCTION$1,720,0002002
HARDIN04- 297.10KY-313STP RIGHT OF WAY$4,500,0002001
HARDIN04- 2001.00I-65IM CONSTRUCTION$1,800,0002002
HARDIN04- 2003.00US-31WSPDESIGN$100,0002002
HARDIN04- 2003.00US-31WSP CONSTRUCTION$4,400,0002004
HARDIN04- 2007.00 US-31WBSPDESIGN$85,0002003
HARDIN04- 5002.00US-31WSP CONSTRUCTION$750,0002002
HARDIN04- 5003.00BG-9002SPDESIGN$65,0002002
HARDIN04- 5003.00BG-9002SP CONSTRUCTION$500,0002003
HARDIN04- 5004.00BG-9002SPDESIGN$65,0002002
HARDIN04- 5004.00BG-9002SP RIGHT OF WAY$25,0002002
HARDIN04- 5004.00BG-9002SP CONSTRUCTION$750,0002003
HARDIN04- 5005.00I-65SPDESIGN$100,0002003
HARLAN11- 254.00US-421SPUTILITIES$500,0002001
HARLAN11- 254.00US-421SP CONSTRUCTION$21,000,0002002
HARLAN11- 264.20US-421SP CONSTRUCTION$14,200,0002001
HARLAN11- 264.30US-421SP CONSTRUCTION$10,000,0002001
HARLAN11- 264.31US-421SP CONSTRUCTION$19,000,0002002
HARLAN11- 267.11US-421SPDESIGN$500,0002003
HARLAN11- 269.00US-421SP RIGHT OF WAY$5,500,0002002
HARLAN11- 269.00US-421SPUTILITIES$300,0002004
HARLAN11- 1036.00KY-215BRX CONSTRUCTION$470,0002001
HARLAN11- 1038.00KY-215BRX CONSTRUCTION$700,0002001
HARLAN11- 1049.00KY-1601BRX RIGHT OF WAY$50,0002002
HARLAN11- 1049.00KY-1601BRXUTILITIES$50,0002002
HARLAN11- 5003.00KY-38SPDESIGN$180,0002002
HARLAN11- 5003.00KY-38SP RIGHT OF WAY$40,0002003
HARLAN11- 5003.00KY-38SPUTILITIES$15,0002003
HARLAN11- 5003.00KY-38SP CONSTRUCTION$1,500,0002004
HARLAN11- 5004.00KY-38SPDESIGN$180,0002002
HARLAN11- 5004.00KY-38SP RIGHT OF WAY$50,0002003
HARLAN11- 5004.00KY-38SPUTILITIES$20,0002003
HARLAN11- 7020.00-SPconstruction$500,0002002
HARRISON06- 119.02US-27SP RIGHT OF WAY$2,400,0002001
HARRISON06- 119.02US-27SPUTILITIES$1,000,0002002
HARRISON06- 1043.00CR-1062BRZDESIGN$200,0002002
HART04- 11.00I-65IM CONSTRUCTION$4,500,0002001
HART04- 11.10I-65IM CONSTRUCTION$4,500,0002001
HART04- 194.00US-31WSP RIGHT OF WAY$150,0002001
HART04- 194.00US-31WSPUTILITIES$100,0002002
HART04- 194.00US-31WSP CONSTRUCTION$600,0002004
HENDERSON02- 69.00I-69SPDESIGN$600,0002002
HENDERSON02- 79.10US-60SPDESIGN$1,200,0002002
HENDERSON02- 79.10US-60STP RIGHT OF WAY$2,500,0002003
HENDERSON02- 79.02US-60STP RIGHT OF WAY$4,000,0002002
HENDERSON02- 79.02US-60STPUTILITIES$2,000,0002003
HENDERSON02- 101.00US-60SAF CONSTRUCTION$3,500,0002002
HENDERSON02- 126.00US-60STPDESIGN$200,0002001
HENDERSON02- 126.00US-60STP RIGHT OF WAY$1,000,0002003
HENDERSON02- 380.00US-60SP CONSTRUCTION$600,0002001
HENDERSON02- 5000.00AU-9005SP CONSTRUCTION$285,5002001
HENDERSON02- 5001.00AU-9005SP CONSTRUCTION$350,0002001
HENDERSON02- 5004.00AU-9005SP RIGHT OF WAY$10,0002001
HENDERSON02- 5004.00AU-9005SP CONSTRUCTION$248,5002002
HENRY05- 2010.00I-71IM CONSTRUCTION$1,000,0002002
HENRY05- 5000.00KY-389SP CONSTRUCTION$628,7002002
HICKMAN01- 182.00US-51STPDESIGN$700,0002002
HICKMAN01- 1114.00KY-1698BRZ CONSTRUCTION$300,0002002
HOPKINS02- 215.00KY-70SP RIGHT OF WAY$2,800,0002001
HOPKINS02- 215.00KY-70SPUTILITIES$2,650,0002002
HOPKINS02- 2007.00PE-9004SPDESIGN$80,0002001
HOPKINS02- 2007.00PE-9004STP CONSTRUCTION$5,500,0002003
HOPKINS02- 2010.00PE-9004SPDESIGN$200,0002003
JACKSON11- 113.00US-421STPDESIGN$200,0002003
JEFFERSON05- 15.00I-264IM CONSTRUCTION$3,500,0002004
JEFFERSON05- 21.00I-265IMUTILITIES$1,000,0002002
JEFFERSON05- 21.00I-265IM CONSTRUCTION$20,000,0002003
JEFFERSON05- 23.00I-64IMDESIGN$1,500,0002001
JEFFERSON05- 23.00I-64IM CONSTRUCTION$7,000,0002003
JEFFERSON05- 41.00I-265IM RIGHT OF WAY$2,000,0002002
JEFFERSON05- 41.00I-265IMUTILITIES$1,000,0002003
JEFFERSON05- 52.00I-64IM RIGHT OF WAY$2,500,0002003
JEFFERSON05- 52.00I-64IMUTILITIES$300,0002003
JEFFERSON05- 52.00I-64IM CONSTRUCTION$8,000,0002004
JEFFERSON05- 48.01I-71NH RIGHT OF WAY$4,000,0002002
JEFFERSON05- 48.01I-71NHUTILITIES$2,000,0002004
JEFFERSON05- 76.01-STP CONSTRUCTION$1,500,0002002
JEFFERSON05- 76.02-SLO CONSTRUCTION$4,750,0002001
JEFFERSON05- 91.02-SLO CONSTRUCTION$4,000,0002003
JEFFERSON05- 110.00US-31NH CONSTRUCTION$2,500,0002004
JEFFERSON05- 118.02-SPDESIGN$3,000,0002001
JEFFERSON05- 118.10-SPDESIGN$6,000,0002002
JEFFERSON05- 118.11-SPDESIGN$6,000,0002003
JEFFERSON05- 118.20-SP RIGHT OF WAY$6,000,0002004
JEFFERSON05- 136.00I-265NH CONSTRUCTION$3,500,0002004
JEFFERSON05- 247.10KY-1450SPUTILITIES$3,700,0002003
JEFFERSON05- 247.20KY-1450SPDESIGN$300,0002002
JEFFERSON05- 322.00-SLO CONSTRUCTION$3,750,0002001
JEFFERSON05- 322.02-SLO CONSTRUCTION$10,087,0002002
JEFFERSON05- 323.01KY-1931SPUTILITIES$3,500,0002002
JEFFERSON05- 325.01KY-1447SPUTILITIES$6,500,0002001
JEFFERSON05- 325.01KY-1447STP CONSTRUCTION$15,000,0002002
JEFFERSON05- 342.02-CM CONSTRUCTION$1,800,0002002
JEFFERSON05- 344.00KY-1747SPDESIGN$1,500,0002003
JEFFERSON05- 381.00-SLO CONSTRUCTION$444,0002001
JEFFERSON05- 382.00-SLO CONSTRUCTION$511,0002002
JEFFERSON05- 383.00-SLO CONSTRUCTION$588,0002003
JEFFERSON05- 384.00-SLO CONSTRUCTION$676,0002004
JEFFERSON05- 385.00-SLO CONSTRUCTION$2,000,0002003
JEFFERSON05- 386.00-SLO RIGHT OF WAY$250,0002001
JEFFERSON05- 386.00-SLOUTILITIES$375,0002003
JEFFERSON05- 386.00-SLO CONSTRUCTION$1,500,0002004
JEFFERSON05- 387.00-SLO CONSTRUCTION$1,000,0002003
JEFFERSON05- 430.02KY-1020SLO CONSTRUCTION$4,300,0002003
JEFFERSON05- 430.03KY-1020SP CONSTRUCTION$1,000,0002001
JEFFERSON05- 435.10-SP CONSTRUCTION$5,000,0002001
JEFFERSON05- 965.08-SLO CONSTRUCTION$14,300,0002004
JEFFERSON05- 972.00KY-42SP RIGHT OF WAY$250,0002002
JEFFERSON05- 972.00KY-42SPUTILITIES$300,0002002
JEFFERSON05- 982.00-SLO RIGHT OF WAY$150,0002003
JEFFERSON05- 982.00-SLOUTILITIES$100,0002004
JEFFERSON05- 982.00-SLO CONSTRUCTION$400,0002004
JEFFERSON05- 1006.00CR-9999BRZ CONSTRUCTION$275,0002002
JEFFERSON05- 1012.05-CM CONSTRUCTION$5,000,0002001
JEFFERSON05- 1012.06-CM CONSTRUCTION$1,500,0002002
JEFFERSON05- 1012.07-CM CONSTRUCTION$5,000,0002003
JEFFERSON05- 1012.08-CM CONSTRUCTION$3,400,0002004
JEFFERSON05- 1018.00CR-9999BRZ RIGHT OF WAY$100,0002001
JEFFERSON05- 1018.00CR-9999BRZUTILITIES$75,0002001
JEFFERSON05- 2000.00I-264IMDESIGN$300,0002001
JEFFERSON05- 2000.00I-264IM CONSTRUCTION$10,000,0002002
JEFFERSON05- 2000.01I-264IM CONSTRUCTION$10,000,0002003
JEFFERSON05- 2001.00I-264IM CONSTRUCTION$8,700,0002001
JEFFERSON05- 2002.00I-265IMDESIGN$20,0002002
JEFFERSON05- 2002.00I-265IM CONSTRUCTION$6,200,0002004
JEFFERSON05- 2004.00I-265IM CONSTRUCTION$2,000,0002001
JEFFERSON05- 2007.00I-64IM CONSTRUCTION$5,000,0002001
JEFFERSON05- 2024.00KY-841SP CONSTRUCTION$1,820,0002001
JEFFERSON05- 2026.00US-31WSP CONSTRUCTION$350,0002001
JEFFERSON05- 2027.00KY-1020SP CONSTRUCTION$500,0002001
JESSAMINE07- 87.02-STP RIGHT OF WAY$2,500,0002001
JESSAMINE07- 87.02-STPUTILITIES$1,000,0002002
JESSAMINE07- 318.01US-68STP RIGHT OF WAY$2,500,0002003
JESSAMINE07- 318.01US-68STPUTILITIES$1,000,0002004
JESSAMINE07- 1078.00KY-29BRX CONSTRUCTION$850,0002001
JESSAMINE07- 5006.00US-68SPDESIGN$60,0002003
JOHNSON12- 294.00KY-40SP CONSTRUCTION$3,600,0002001
JOHNSON12- 1036.00KY-40BRO CONSTRUCTION$2,500,0002002
JOHNSON12- 5002.00KY-1100SP CONSTRUCTION$350,0002002
JOHNSON12- 5008.00KY-321SPDESIGN$220,0002002
JOHNSON12- 5008.00KY-321SP RIGHT OF WAY$60,0002003
KENTON06- 71.03KY-1303SNK RIGHT OF WAY$4,000,0002002
KENTON06- 71.03KY-1303SNKUTILITIES$1,000,0002004
KENTON06- 273.00KY-1120SNK CONSTRUCTION$4,500,0002001
KENTON06- 286.01-SP RIGHT OF WAY$250,0002001
KENTON06- 286.01-SPUTILITIES$200,0002002
KENTON06- 286.01-SP CONSTRUCTION$9,000,0002004
KENTON06- 300.00-STPDESIGN$2,100,0002001
KENTON06- 300.00-STP CONSTRUCTION$14,000,0002002
KENTON06- 313.10KY-17SPUTILITIES$1,000,0002001
KENTON06- 313.10KY-17SP CONSTRUCTION$10,000,0002002
KENTON06- 344.00KY-16SP RIGHT OF WAY$7,900,0002001
KENTON06- 344.00KY-16SNKUTILITIES$8,300,0002001
KENTON06- 1030.00KY-8BROUTILITIES$1,300,0002001
KENTON06- 1030.00KY-8BRO CONSTRUCTION$2,800,0002002
KENTON06- 2003.00I-275IM CONSTRUCTION$1,000,0002002
KENTON06- 5002.00KY-1072SP RIGHT OF WAY$20,0002001
KENTON06- 5002.00KY-1072SP CONSTRUCTION$450,0002002
KENTON06- 5007.00I-275SPDESIGN$150,0002002
KENTON06- 5007.00I-275SP CONSTRUCTION$1,500,0002004
KENTON06- 5008.00I-275SPDESIGN$175,0002002
KNOTT12- 2000.00KY-80SPDESIGN$25,0002004
KNOTT12- 5000.00KY-80SP CONSTRUCTION$417,0002001
KNOTT12- 5001.00KY-550SP RIGHT OF WAY$5,0002001
KNOTT12- 5001.00KY-550SP CONSTRUCTION$173,9002002
KNOTT12- 5006.00KY-80SPDESIGN$210,0002002
KNOTT12- 5006.00KY-80SP RIGHT OF WAY$30,0002003
KNOTT12- 5006.00KY-80SP CONSTRUCTION$1,750,0002004
KNOX11- 112.00-SPDESIGN$400,0002003
KNOX11- 218.00KY-11SP RIGHT OF WAY$150,0002001
KNOX11- 218.00KY-11SPUTILITIES$50,0002001
KNOX11- 218.00KY-11SP CONSTRUCTION$405,0002002
LARUE04- 121.01KY-210STP CONSTRUCTION$8,000,0002001
LARUE04- 121.02KY-210STP CONSTRUCTION$12,000,0002002
LARUE04- 1047.00KY-470BRX CONSTRUCTION$350,0002002
LARUE04- 5006.00KY-84SPDESIGN$60,0002004
LAUREL11- 8.00I-75NH CONSTRUCTION$14,000,0002003
LAUREL11- 9.01I-75NH CONSTRUCTION$10,000,0002003
LAUREL11- 9.02I-75NH CONSTRUCTION$5,000,0002004
LAUREL11- 15.00I-75STP CONSTRUCTION$16,000,0002003
LAUREL11- 15.01I-75SP CONSTRUCTION$7,500,0002003
LAUREL11- 15.02I-75SP CONSTRUCTION$13,500,0002004
LAUREL11- 278.10KY-30SP CONSTRUCTION$10,000,0002001
LAUREL11- 278.12KY-30SP CONSTRUCTION$7,000,0002003
LAUREL11- 278.20KY-30SPDESIGN$2,500,0002001
LAUREL11- 278.20KY-30SP RIGHT OF WAY$4,000,0002003
LAUREL11- 1047.00KY-1305BRX CONSTRUCTION$200,0002002
LAUREL11- 2004.00DB-9006SP CONSTRUCTION$7,500,0002002
LAUREL11- 2004.01DB-9006SP CONSTRUCTION$8,700,0002004
LAUREL11- 2007.00US-25ESPDESIGN$50,0002003
LAWRENCE12- 3.00US-23NH RIGHT OF WAY$1,700,0002001
LAWRENCE12- 3.00US-23NHUTILITIES$750,0002003
LAWRENCE12- 3.00US-23NH CONSTRUCTION$8,500,0002004
LAWRENCE12- 284.00KY-32STPDESIGN$600,0002004
LAWRENCE12- 1033.00KY-707BRZ CONSTRUCTION$250,0002002
LAWRENCE12- 1034.00KY-707BRZ CONSTRUCTION$250,0002002
LAWRENCE12- 1063.00CR-1124BRZ CONSTRUCTION$500,0002001
LEE10- 292.00KY-11SPDESIGN$1,200,0002002
LEE10- 1056.00CR-1147BRZDESIGN$75,0002002
LEE10- 1056.00CR-1147BRZ RIGHT OF WAY$50,0002004
LEE10- 1056.00CR-1147BRZUTILITIES$50,0002004
LESLIE11- 12.00US-421STPDESIGN$500,0002002
LESLIE11- 119.00DB-9006SPDESIGN$400,0002003
LETCHER12- 121.00KY-15SPDESIGN$150,0002003
LETCHER12- 311.10US-119APD CONSTRUCTION$10,000,0002001
LETCHER12- 311.11US-119APD CONSTRUCTION$15,000,0002003
LETCHER12- 311.12US-119APD CONSTRUCTION$21,000,0002004
LETCHER12- 314.00US-119APDDESIGN$3,500,0002001
LETCHER12- 314.00US-119APD RIGHT OF WAY$4,152,0002003
LETCHER12- 314.00US-119APDUTILITIES$1,725,0002004
LETCHER12- 1059.00CR-1371BRZ CONSTRUCTION$550,0002002
LETCHER12- 1061.00KY-113BRX CONSTRUCTION$600,0002002
LETCHER12- 5003.00KY-588SP CONSTRUCTION$400,0002002
LINCOLN08- 161.00US-150STPUTILITIES$200,0002001
LINCOLN08- 161.00US-150STP CONSTRUCTION$4,500,0002002
LINCOLN08- 163.00US-150SPDESIGN$1,500,0002001
LINCOLN08- 163.00US-150STP RIGHT OF WAY$3,000,0002003
LINCOLN08- 5006.00US-27SPDESIGN$60,0002003
LINCOLN08- 5006.00US-27SP RIGHT OF WAY$50,0002004
LINCOLN08- 5006.00US-27SPUTILITIES$60,0002004
LIVINGSTON01- 184.00US-60SPDESIGN$750,0002002
LIVINGSTON01- 184.00US-60STP RIGHT OF WAY$1,250,0002004
LIVINGSTON01- 330.00US-60SPDESIGN$850,0002003
LIVINGSTON01- 1123.00KY-952BRX CONSTRUCTION$750,0002001
LIVINGSTON01- 2003.00I-24IM CONSTRUCTION$800,0002002
LIVINGSTON01- 5001.00US-60SP RIGHT OF WAY$10,0002001
LIVINGSTON01- 5001.00US-60SP CONSTRUCTION$350,0002001
LOGAN03- 148.00-SP RIGHT OF WAY$1,500,0002002
LOGAN03- 148.00-SPUTILITIES$500,0002004
LYON01- 307.01US-62SP RIGHT OF WAY$4,000,0002002
LYON01- 307.01US-62SPUTILITIES$4,000,0002004
LYON01- 5002.00KY-295SP RIGHT OF WAY$20,0002001
LYON01- 5002.00KY-295SPUTILITIES$15,0002001
LYON01- 5002.00KY-295SP CONSTRUCTION$450,0002002
MADISON07- 28.10CR-1206SP RIGHT OF WAY$350,0002001
MADISON07- 28.10CR-1206SPUTILITIES$2,400,0002001
MADISON07- 28.10CR-1206SP CONSTRUCTION$3,000,0002002
MADISON07- 214.00KY-169SP RIGHT OF WAY$1,500,0002001
MADISON07- 214.00KY-169SPUTILITIES$1,500,0002003
MADISON07- 214.00KY-169SP CONSTRUCTION$6,500,0002004
MADISON07- 309.00KY-52STPUTILITIES$1,710,0002001
MADISON07- 309.00KY-52STP CONSTRUCTION$9,250,0002002
MADISON07- 5003.00KY-52SPDESIGN$150,0002001
MADISON07- 5003.00KY-52SP CONSTRUCTION$1,250,0002002
MAGOFFIN10- 121.00US-460SPDESIGN$1,000,0002003
MAGOFFIN10- 280.00US-460STP CONSTRUCTION$4,500,0002001
MAGOFFIN12- 1.10KY-114NH RIGHT OF WAY$2,000,0002001
MAGOFFIN12- 1.10KY-114NHUTILITIES$1,500,0002003
MAGOFFIN12- 1.10KY-114NH CONSTRUCTION$15,000,0002004
MARION04- 192.00US-68SPDESIGN$1,200,0002001
MARION04- 192.00US-68SP RIGHT OF WAY$2,000,0002003
MARION04- 309.00KY-49STP RIGHT OF WAY$300,0002001
MARION04- 309.00KY-49STPutilities$200,0002001
MARSHALL01- 180.70US-68BROUTILITIES$150,0002001
MARSHALL01- 180.70US-68BRO CONSTRUCTION$7,000,0002004
MARSHALL01- 1117.00KY-58BRO RIGHT OF WAY$250,0002001
MARSHALL01- 1117.00KY-58BROUTILITIES$1,275,0002001
MARSHALL01- 1117.00KY-58BRO CONSTRUCTION$2,000,0002003
MARSHALL01- 1121.00US-68BRO CONSTRUCTION$2,500,0002002
MARSHALL01- 1130.00KY-1824BRX RIGHT OF WAY$75,0002001
MARSHALL01- 1130.00KY-1824BRXUTILITIES$295,0002001
MARSHALL01- 1130.00KY-1824BRX CONSTRUCTION$500,0002003
MARSHALL01- 5000.00KY-80SP CONSTRUCTION$150,0002001
MARSHALL01- 5003.00PU-9003SPDESIGN$60,0002001
MARSHALL01- 5003.00PU-9003SP RIGHT OF WAY$10,0002002
MARSHALL01- 5003.00PU-9003SP CONSTRUCTION$450,0002004
MARTIN12- 154.01KY-40SP CONSTRUCTION$4,000,0002001
MARTIN12- 154.02KY-40STP CONSTRUCTION$11,000,0002001
MARTIN12- 154.03KY-40STP CONSTRUCTION$25,000,0002002
MARTIN12- 154.04KY-40STP CONSTRUCTION$15,000,0002003
MARTIN12- 154.10KY-40STP RIGHT OF WAY$3,000,0002001
MARTIN12- 154.10KY-40STPUTILITIES$3,000,0002003
MARTIN12- 285.00KY-40SPDESIGN$250,0002004
MARTIN12- 1052.00CR-9999BRZ CONSTRUCTION$450,0002002
MASON09- 108.00US-62STP CONSTRUCTION$6,000,0002002
MASON09- 124.01US-68NH RIGHT OF WAY$4,000,0002001
MASON09- 124.01US-68NHUTILITIES$3,500,0002001
MASON09- 124.01US-68NH CONSTRUCTION$17,000,0002002
MASON09- 145.00-SP CONSTRUCTION$1,150,0002001
MCCRACKEN01- 115.10US-60SPDESIGN$400,0002001
MCCRACKEN01- 115.10US-60SP RIGHT OF WAY$1,250,0002003
MCCRACKEN01- 186.00US-45STP CONSTRUCTION$2,500,0002004
MCCRACKEN01- 260.00US-62STPUTILITIES$3,400,0002001
MCCRACKEN01- 260.00US-62STP CONSTRUCTION$3,000,0002002
MCCRACKEN01- 310.01-SP RIGHT OF WAY$3,000,0002002
MCCRACKEN01- 310.01-SPUTILITIES$2,000,0002004
MCCRACKEN01- 1115.00US-60BRO RIGHT OF WAY$5,000,0002001
MCCRACKEN01- 1115.00US-60BROUTILITIES$3,000,0002003
MCCRACKEN01- 1124.00KY-998BRX RIGHT OF WAY$500,0002001
MCCRACKEN01- 1124.00KY-998BRXUTILITIES$1,000,0002001
MCCRACKEN01- 1124.00KY-998BRX CONSTRUCTION$2,000,0002002
MCCREARY08- 262.01US-27SP CONSTRUCTION$3,500,0002001
MCCREARY08- 1012.00CR-5236BRZ RIGHT OF WAY$200,0002001
MCCREARY08- 1012.00CR-5236BRZUTILITIES$150,0002001
MCLEAN02- 9.00US-431STP RIGHT OF WAY$600,0002002
MCLEAN02- 9.00US-431STPUTILITIES$400,0002004
MCLEAN02- 1049.00KY-136BRO RIGHT OF WAY$50,0002002
MCLEAN02- 1049.00KY-136BROUTILITIES$50,0002002
MCLEAN02- 1049.00KY-136BRO CONSTRUCTION$250,0002004
MEADE04- 53.00KY-313SPDESIGN$1,800,0002001
MEADE04- 53.01KY-313STP RIGHT OF WAY$6,500,0002003
MEADE04- 2006.00US-31WSPDESIGN$30,0002001
MEADE04- 2006.00US-31WSP CONSTRUCTION$1,200,0002003
MEADE04- 5001.00KY-230SP CONSTRUCTION$325,0002002
MENIFEE10- 117.01US-460STP RIGHT OF WAY$2,000,0002002
MENIFEE10- 117.01US-460STPUTILITIES$1,500,0002004
MENIFEE10- 1054.00KY-713BRX RIGHT OF WAY$600,0002001
MENIFEE10- 1054.00KY-713BRXUTILITIES$75,0002001
MENIFEE10- 1054.00KY-713BRX CONSTRUCTION$360,0002002
MENIFEE10- 5008.00KY-1274SPDESIGN$100,0002004
MERCER07- 1075.00KY-152BRO RIGHT OF WAY$150,0002001
MERCER07- 1075.00KY-152BROUTILITIES$75,0002001
MERCER07- 1089.00KY-1988BRX RIGHT OF WAY$50,0002002
MERCER07- 1089.00KY-1988BRXUTILITIES$30,0002003
MERCER07- 1089.00KY-1988BRX CONSTRUCTION$150,0002004
METCALFE03- 1050.00KY-640BRX CONSTRUCTION$350,0002002
MONROE03- 276.01KY-163SPDESIGN$800,0002001
MONROE03- 276.01KY-163STP RIGHT OF WAY$2,500,0002003
MONROE03- 7020.00-SP RIGHT OF WAY$1,500,0002001
MONROE03- 7020.00-SPutilities$500,0002002
MONTGOMERY 07- 83.00 US-60STP CONSTRUCTION$600,000 2001
MONTGOMERY 07- 124.00US-460SPright of way$500,000 2003
MONTGOMERY 07- 124.00US-460SPutilities$300,000 2003
MONTGOMERY 07- 317.00KY-11SPright of way$2,000,000 2002
MONTGOMERY 07- 317.00KY-11SPUTILITIES$1,500,000 2002
MONTGOMERY 07- 1079.00KY-599BRX CONSTRUCTION$350,000 2002
MONTGOMERY 07- 2000.00I-64IMDESIGN$250,000 2001
MONTGOMERY 07- 2000.00I-64IM CONSTRUCTION$10,000,000 2001
MONTGOMERY 07- 2000.01I-64IM CONSTRUCTION$7,000,000 2002
MORGAN10- 130.00US-460SP RIGHT OF WAY$650,0002002
MORGAN10- 130.00US-460SPUTILITIES$120,0002004
MORGAN10- 291.00KY-7SP CONSTRUCTION$7,000,0002001
MORGAN10- 1037.00US-460BRO CONSTRUCTION$425,0002002
MUHLENBERG 02- 313.00 KY-181SPDESIGN$800,000 2002
MUHLENBERG 02- 1015.00CR-1412BRZ CONSTRUCTION$225,000 2001
MUHLENBERG 02- 2005.00WK-9001SP CONSTRUCTION$4,000,000 2001
MUHLENBERG 02- 2006.00WK-9001SP CONSTRUCTION$3,500,000 2002
MUHLENBERG 02- 5006.00US-431SP RIGHT OF WAY$20,000 2001
MUHLENBERG 02- 5006.00US-431SPUTILITIES$10,000 2001
MUHLENBERG 02- 5006.00US-431SP CONSTRUCTION$120,000 2002
NELSON04- 184.00US-62STP RIGHT OF WAY$1,000,0002002
NELSON04- 184.00US-62STPUTILITIES$400,0002003
NELSON04- 191.00BG-9002NH CONSTRUCTION$590,0002002
NELSON04- 285.00US-31ESP RIGHT OF WAY$750,0002002
NELSON04- 285.00US-31ESPUTILITIES$500,0002002
NELSON04- 287.00US-31ESPUTILITIES$1,950,0002001
NELSON04- 287.00US-31ESP CONSTRUCTION$23,000,0002002
NELSON04- 295.10KY-245SPUTILITIES$200,0002001
NELSON04- 295.10KY-245SP CONSTRUCTION$1,000,0002002
NELSON04- 311.00US-31ESTP CONSTRUCTION$3,000,0002002
NELSON04- 1049.00KY-509BRX CONSTRUCTION$400,0002003
NELSON04- 2004.00BG-9002NHDESIGN$60,0002002
NELSON04- 2004.00BG-9002NH CONSTRUCTION$5,250,0002002
OHIO02- 5003.00WN-9007SP CONSTRUCTION$82,3002002
OLDHAM05- 230.00KY-393STP CONSTRUCTION$4,000,0002001
OLDHAM05- 230.01KY-393STP CONSTRUCTION$6,300,0002002
OLDHAM05- 304.01KY-22STP RIGHT OF WAY$3,300,0002001
OLDHAM05- 304.01KY-22STPUTILITIES$1,600,0002002
OLDHAM05- 367.00-STPUTILITIES$3,000,0002003
OLDHAM05- 5005.00KY-1793SPDESIGN$75,0002002
OWSLEY10- 279.50KY-30SPDESIGN$500,0002001
OWSLEY10- 1034.00KY-30BRO CONSTRUCTION$2,800,0002001
OWSLEY10- 5003.00KY-847SP CONSTRUCTION$265,6002001
OWSLEY10- 5004.00KY-28SPDESIGN$180,0002001
OWSLEY10- 5004.00KY-28SP RIGHT OF WAY$25,0002002
OWSLEY10- 5004.00KY-28SP CONSTRUCTION$1,500,0002003
PENDLETON06- 276.00US-27STP CONSTRUCTION$4,500,0002001
PENDLETON06- 1042.00CR-1117BRZ RIGHT OF WAY$160,0002001
PENDLETON06- 1042.00CR-1117BRZUTILITIES$100,0002001
PENDLETON06- 1042.00CR-1117BRZ CONSTRUCTION$1,000,0002002
PERRY10- 114.00KY-7STP RIGHT OF WAY$1,000,0002001
PERRY10- 114.00KY-7STPUTILITIES$750,0002002
PERRY10- 114.00KY-7STP CONSTRUCTION$13,100,0002003
PERRY10- 114.02KY-7STP CONSTRUCTION$6,000,0002004
PERRY10- 122.00DB-9006SPDESIGN$500,0002003
PERRY10- 269.01KY-15STP CONSTRUCTION$11,500,0002002
PERRY10- 269.02KY-15NH CONSTRUCTION$17,000,0002001
PERRY10- 1021.00-BRZ RIGHT OF WAY$696,0002002
PERRY10- 1021.00-BRZUTILITIES$250,0002002
PERRY10- 5000.00KY-476SP CONSTRUCTION$307,6002001
PERRY10- 5002.00KY-476SP CONSTRUCTION$63,4002001
PERRY10- 5005.00KY-7SP RIGHT OF WAY$50,0002001
PERRY10- 5005.00KY-7SP CONSTRUCTION$1,750,0002003
PERRY10- 5006.00KY-80SPDESIGN$210,0002002
PERRY10- 5006.00KY-80SP RIGHT OF WAY$30,0002003
PERRY10- 5006.00KY-80SP CONSTRUCTION$1,750,0002004
PIKE12- 131.00US-23NHDESIGN$400,0002001
PIKE12- 131.00US-23NH RIGHT OF WAY$1,000,0002003
PIKE12- 131.00US-23NHUTILITIES$1,000,0002004
PIKE12- 131.01US-23NHDESIGN$400,0002002
PIKE12- 263.10US-460SP CONSTRUCTION$13,500,0002002
PIKE12- 263.11US-460SP CONSTRUCTION$10,000,0002003
PIKE12- 263.15US-460SP RIGHT OF WAY$4,000,0002001
PIKE12- 263.15US-460APDUTILITIES$2,000,0002003
PIKE12- 263.22US-460APDDESIGN$1,000,0002001
PIKE12- 263.22US-460APD RIGHT OF WAY$5,000,0002003
PIKE12- 263.24US-460APDDESIGN$1,000,0002003
PIKE12- 264.21US-119NH CONSTRUCTION$11,000,0002002
PIKE12- 264.22US-119NH CONSTRUCTION$4,000,0002003
PIKE12- 281.00KY-194SPDESIGN$200,0002003
PIKE12- 298.00KY-199SP RIGHT OF WAY$2,500,0002002
PIKE12- 298.00KY-199SPUTILITIES$300,0002002
PIKE12- 308.12US-119NH CONSTRUCTION$11,000,0002001
PIKE12- 308.21US-119APD CONSTRUCTION$11,000,0002002
PIKE12- 308.30US-119APD CONSTRUCTION$7,000,0002001
PIKE12- 308.31US-119APD CONSTRUCTION$13,000,0002002
PIKE12- 308.32US-119APD CONSTRUCTION$14,000,0002003
PIKE12- 308.33US-119STP CONSTRUCTION$20,000,0002004
PIKE12- 308.40US-119APD CONSTRUCTION$20,000,0002004
PIKE12- 1037.00KY-1499BRO CONSTRUCTION$700,0002003
PIKE12- 1042.00KY-2061BRX CONSTRUCTION$425,0002002
PIKE12- 1043.00KY-3419BRX CONSTRUCTION$350,0002002
PIKE12- 1050.00CR-1559BRZ CONSTRUCTION$300,0002001
PIKE12- 1051.00CR-5116BRZ RIGHT OF WAY$50,0002001
PIKE12- 1051.00CR-5116BRZUTILITIES$100,0002001
PIKE12- 1057.00KY-292BRO RIGHT OF WAY$200,0002002
PIKE12- 1057.00KY-292BROUTILITIES$300,0002002
PIKE12- 1057.00KY-292BRO CONSTRUCTION$1,400,0002004
PIKE12- 1062.00KY-199BRX CONSTRUCTION$375,0002002
PIKE12- 5005.00US-23SPDESIGN$250,0002001
PIKE12- 5005.00US-23SP RIGHT OF WAY$80,0002002
PIKE12- 5005.00US-23SP CONSTRUCTION$2,500,0002003
PIKE12- 5010.00KY-1426SPDESIGN$300,0002001
POWELL10- 118.01KY-213STPUTILITIES$750,0002001
POWELL10- 118.01KY-213STP CONSTRUCTION$1,720,0002002
POWELL10- 1055.00KY-1639BRX CONSTRUCTION$363,0002002
PULASKI08- 55.10US-27NHUTILITIES$3,000,0002001
PULASKI08- 55.10US-27NH CONSTRUCTION$10,000,0002002
PULASKI08- 55.11US-27NH CONSTRUCTION$10,000,0002003
PULASKI08- 138.03US-27BRO CONSTRUCTION$9,000,0002001
PULASKI08- 259.01-STP RIGHT OF WAY$5,500,0002001
PULASKI08- 259.01-STPUTILITIES$2,500,0002003
PULASKI08- 268.01-SP CONSTRUCTION$2,500,0002001
PULASKI08- 270.00KY-1247SP RIGHT OF WAY$3,750,0002002
PULASKI08- 270.00KY-1247SPUTILITIES$970,0002004
PULASKI08- 1009.01KY-90BRO CONSTRUCTION$5,000,0002001
PULASKI08- 1009.02KY-90BRO CONSTRUCTION$12,000,0002002
PULASKI08- 1009.03KY-90BRO CONSTRUCTION$13,000,0002003
PULASKI08- 5003.00US-27SPDESIGN$70,0002001
PULASKI08- 5003.00US-27SP RIGHT OF WAY$200,0002002
PULASKI08- 5003.00US-27SPUTILITIES$75,0002002
PULASKI08- 5003.00US-27SP CONSTRUCTION$1,600,0002003
PULASKI08- 5004.00CU-9008SPDESIGN$50,0002001
PULASKI08- 5004.00CU-9008SP RIGHT OF WAY$20,0002002
PULASKI08- 5004.00CU-9008SP CONSTRUCTION$2,350,0002004
ROBERTSON06- 121.00KY-165SP RIGHT OF WAY$500,0002001
ROBERTSON06- 121.00KY-165SPUTILITIES$300,0002001
ROBERTSON06- 348.00CR-1302BRZ RIGHT OF WAY$35,0002001
ROBERTSON06- 348.00CR-1302BRZUTILITIES$30,0002001
ROCKCASTLE08- 4.00I-75IM CONSTRUCTION$4,000,0002002
ROCKCASTLE08- 4.01I-75NH CONSTRUCTION$10,000,0002002
ROCKCASTLE08- 163.10US-150STPDESIGN$1,000,0002002
ROCKCASTLE08- 163.10US-150STP RIGHT OF WAY$3,000,0002004
ROWAN09- 142.00KY-32SP CONSTRUCTION$2,500,0002001
ROWAN09- 156.01KY-519STP RIGHT OF WAY$2,000,0002001
ROWAN09- 156.01KY-519STPUTILITIES$1,500,0002002
ROWAN09- 156.01KY-519STP CONSTRUCTION$12,500,0002004
ROWAN09- 300.00I-64STPDESIGN$280,0002001
ROWAN09- 300.00I-64STP CONSTRUCTION$7,000,0002001
ROWAN09- 301.00-STP RIGHT OF WAY$1,000,0002001
ROWAN09- 301.00-STPUTILITIES$1,000,0002001
ROWAN09- 301.00-STP CONSTRUCTION$4,400,0002004
ROWAN09- 1026.00KY-32BRO CONSTRUCTION$500,0002002
ROWAN09- 1040.00CR-1222BRZ CONSTRUCTION$1,000,0002004
ROWAN09- 5007.00I-64SPDESIGN$60,0002004
ROWAN09- 7010.00-SP CONSTRUCTION$1,100,0002001
ROWAN09-7030.00KY-519SP RIGHT OF WAY$100,0002002
ROWAN09-7030.00KY-519SPUTILITIES$100,0002002
ROWAN09-7030.00KY-519SP CONSTRUCTION$3,000,0002004
RUSSELL08- 54.01US-127SPDESIGN$300,0002001
RUSSELL08- 54.01US-127STP RIGHT OF WAY$5,500,0002003
RUSSELL08- 5007.00US-127SPDESIGN$35,0002004
SCOTT06- 72.21I-75NHUTILITIES$500,0002001
SCOTT07- 86.00US-460STPUTILITIES$700,0002001
SCOTT07- 86.00US-460STP CONSTRUCTION$5,000,0002002
SCOTT07- 102.01-STP RIGHT OF WAY$6,000,0002004
SCOTT07- 209.20-SP CONSTRUCTION$3,675,0002001
SCOTT07- 212.00US-460SPDESIGN$300,0002001
SCOTT07- 212.00US-460STP RIGHT OF WAY$750,0002003
SCOTT07- 298.00US-62SPUTILITIES$750,0002001
SCOTT07- 298.00US-62STP CONSTRUCTION$9,000,0002002
SCOTT07- 1042.00CR-1218BRZ CONSTRUCTION$500,0002001
SCOTT07- 1076.00KY-32BROUTILITIES$75,0002001
SCOTT07- 1076.00KY-32BRO CONSTRUCTION$200,0002002
SCOTT07- 5000.00KY-620SP CONSTRUCTION$342,0002001
SHELBY05- 172.00KY-395STP RIGHT OF WAY$4,000,0002002
SHELBY05- 172.00KY-395STPUTILITIES$800,0002003
SHELBY05- 326.01-SP RIGHT OF WAY$5,000,0002002
SHELBY05- 326.01-SPUTILITIES$2,000,0002003
SHELBY05- 326.01-SP CONSTRUCTION$18,000,0002004
SHELBY05- 1021.00US-60BRO RIGHT OF WAY$50,0002002
SHELBY05- 1021.00US-60BROUTILITIES$50,0002002
SHELBY05- 1021.00US-60BRO CONSTRUCTION$200,0002004
SHELBY05- 2006.00I-64IMDESIGN$150,0002002
SHELBY05- 2011.00KY-53SP CONSTRUCTION$4,000,0002001
SHELBY05- 2012.00US-60SP CONSTRUCTION$100,0002001
SIMPSON03- 8.00US-31WSTP RIGHT OF WAY$5,500,0002001
SIMPSON03- 8.00US-31WSTPUTILITIES$2,500,0002001
SIMPSON03- 197.00KY-100SP CONSTRUCTION$1,000,0002001
SIMPSON03- 1052.00KY-73BRO RIGHT OF WAY$75,0002002
SIMPSON03- 1052.00KY-73BROUTILITIES$50,0002002
SIMPSON03- 1052.00KY-73BRO CONSTRUCTION$300,0002004
SPENCER05- 307.00KY-2450SP CONSTRUCTION$2,500,0002001
SPENCER05- 347.00KY-44STPDESIGN$1,000,0002003
SPENCER05- 5001.00KY-44SP CONSTRUCTION$250,0002002
SPENCER05- 5006.00KY-55SPDESIGN$45,0002003
TAYLOR04- 114.00KY-210SPDESIGN$350,0002004
TAYLOR04- 1037.00CR-1210BRZ CONSTRUCTION$200,0002002
TAYLOR04- 1053.00KY-70BRO RIGHT OF WAY$50,0002002
TAYLOR04- 1053.00KY-70BROUTILITIES$50,0002002
TAYLOR04- 1053.00KY-70BRO CONSTRUCTION$500,0002004
TAYLOR04- 5000.00US-68SP CONSTRUCTION$550,0002001
TODD03- 2003.00US-79SP CONSTRUCTION$3,000,0002002
TODD03- 2004.00KY-346SP CONSTRUCTION$1,400,0002001
TRIGG01- 180.51US-68STP RIGHT OF WAY$4,900,0002001
TRIGG01- 180.51US-68STPUTILITIES$7,745,0002002
TRIGG01- 180.51US-68STP CONSTRUCTION$8,000,0002004
TRIGG01- 180.52US-68SP RIGHT OF WAY$50,0002001
TRIGG01- 180.52US-68SPUTILITIES$1,250,0002001
TRIGG01- 180.52US-68SP CONSTRUCTION$14,000,0002003
TRIGG01- 180.53US-68SP RIGHT OF WAY$50,0002001
TRIGG01- 180.53US-68SPUTILITIES$500,0002001
TRIGG01- 180.53US-68SP CONSTRUCTION$10,500,0002003
TRIGG01- 180.60US-68BROUTILITIES$150,0002001
TRIGG01- 180.60US-68BRO CONSTRUCTION$8,000,0002003
TRIGG01- 180.61US-68STP CONSTRUCTION$11,000,0002004
TRIGG01- 1120.00KY-139BRO RIGHT OF WAY$250,0002001
TRIGG01- 1120.00KY-139BROUTILITIES$260,0002001
TRIGG01- 1120.00KY-139BRO CONSTRUCTION$1,780,0002003
TRIGG01- 1131.00KY-272BRX RIGHT OF WAY$300,0002002
TRIGG01- 1131.00KY-272BRXUTILITIES$300,0002002
TRIMBLE05- 5003.00US-42SPDESIGN$65,0002001
TRIMBLE05- 5003.00US-42SP CONSTRUCTION$500,0002002
UNION02- 79.20US-60SPDESIGN$1,800,0002004
UNION02- 102.00KY-56STP CONSTRUCTION$2,500,0002002
UNION02- 122.01US-60STP RIGHT OF WAY$1,500,0002001
UNION02- 122.01US-60STPUTILITIES$1,000,0002002
UNION02- 122.01US-60STP CONSTRUCTION$15,000,0002003
UNION02- 123.01US-60STP RIGHT OF WAY$1,000,0002001
UNION02- 123.01US-60STPUTILITIES$750,0002003
UNION02- 123.01US-60STP CONSTRUCTION$10,500,0002004
UNION02- 294.01US-60STP CONSTRUCTION$4,750,0002001
UNION02- 1048.00KY-948BRX CONSTRUCTION$130,0002002
UNION02- 2023.00KY-109SP CONSTRUCTION$1,210,0002001
WARREN03- 5.00I-65IM CONSTRUCTION$12,000,0002004
WARREN03- 6.00I-65NH CONSTRUCTION$5,000,0002004
WARREN03- 6.01I-65IM CONSTRUCTION$4,000,0002004
WARREN03- 11.00I-65STP CONSTRUCTION$15,000,0002004
WARREN03- 11.01I-65SP CONSTRUCTION$14,000,0002004
WARREN03- 53.00-NH CONSTRUCTION$7,000,0002002
WARREN03- 53.01-NH CONSTRUCTION$10,000,0002003
WARREN03- 146.31US-231STP CONSTRUCTION$5,000,0002001
WARREN03- 252.10KY-234STP CONSTRUCTION$6,000,0002001
WARREN03- 290.01KY-880SP RIGHT OF WAY$4,500,0002001
WARREN03- 290.01KY-880SPUTILITIES$2,500,0002003
WARREN03- 310.00-SPUTILITIES$750,0002002
WARREN03- 310.00-SP CONSTRUCTION$3,200,0002004
WARREN03- 312.00US-31WSTP RIGHT OF WAY$2,500,0002001
WARREN03- 312.00US-31WSTPUTILITIES$2,000,0002003
WARREN03- 316.00KY-2158SP RIGHT OF WAY$2,000,0002001
WARREN03- 316.00KY-2158SPUTILITIES$2,500,0002003
WARREN03- 317.00US-31WSTPDESIGN$500,0002003
WASHINGTON 04- 103.05 US-150STP CONSTRUCTION$4,200,000 2001
WASHINGTON 04- 284.01 KY-555STPUTILITIES$1,000,000 2001
WASHINGTON 04- 284.01 KY-555STP CONSTRUCTION$19,600,000 2003
WASHINGTON 04- 307.00 US-150STPDESIGN$500,000 2001
WASHINGTON 04- 307.00 US-150STP RIGHT OF WAY$2,000,000 2003
WEBSTER02- 128.00US-41ASPDESIGN$250,0002003
WEBSTER02- 5007.00PE-9004SP CONSTRUCTION$650,0002001
WHITLEY11- 14.00I-75NHDESIGN$3,000,0002001
WHITLEY11- 14.01I-75IMDESIGN$3,000,0002001
WHITLEY11- 120.00US-25WSPUTILITIES$450,0002001
WHITLEY11- 120.00US-25WSP CONSTRUCTION$4,000,0002002
WHITLEY08- 261.10KY-92SP RIGHT OF WAY$3,000,0002001
WHITLEY08- 261.10KY-92SPUTILITIES$2,000,0002003
WHITLEY11- 1042.00KY-628BRXUTILITIES$25,0002001
WHITLEY11- 1042.00KY-628BRX CONSTRUCTION$300,0002002
WHITLEY11- 1048.00KY-779BRX RIGHT OF WAY$40,0002002
WHITLEY11- 1048.00KY-779BRXUTILITIES$60,0002002
WHITLEY11- 5001.00US-25WSP CONSTRUCTION$125,0002002
WHITLEY11- 5002.00US-25WSP RIGHT OF WAY$30,0002001
WHITLEY11- 5002.00US-25WSPUTILITIES$20,0002001
WHITLEY11- 5002.00US-25WSP CONSTRUCTION$1,500,0002002
WHITLEY11- 5007.00US-25WSPDESIGN$50,0002004
WOLFE10- 11.00KY-15SPDESIGN$2,000,0002003
WOLFE10- 126.10KY-9009SPDESIGN$600,0002001
WOLFE10- 126.10KY-9009NH RIGHT OF WAY$2,000,0002003
WOLFE10- 126.20KY-9009SPDESIGN$600,0002003
WOODFORD07- 347.00-SP CONSTRUCTION$7,948,0002001
WOODFORD07- 5005.00KY-1964SPDESIGN$80,0002002
WOODFORD07- 5005.00KY-1964SP CONSTRUCTION$750,0002003
ZVARIOUS99- 24.00I-64IM CONSTRUCTION$3,500,0002002
ZVARIOUS99- 41.00I-24IM CONSTRUCTION$2,500,0002002
ZVARIOUS99- 42.00-IM CONSTRUCTION$3,500,0002003
ZVARIOUS99- 86.05-SP CONSTRUCTION$35,000,0002001
ZVARIOUS99- 86.06-SP CONSTRUCTION$35,000,0002002
ZVARIOUS99- 86.07-SP CONSTRUCTION$35,000,0002003
ZVARIOUS99- 86.08-SP CONSTRUCTION$35,000,0002004
ZVARIOUS99- 121.00-NH CONSTRUCTION$1,000,0002002
ZVARIOUS99- 124.00-BRZ CONSTRUCTION$875,0002001
ZVARIOUS99- 195.03-TE CONSTRUCTION$12,700,0002001
ZVARIOUS99- 195.04-TE CONSTRUCTION$12,700,0002002
ZVARIOUS99- 195.05-TE CONSTRUCTION$12,700,0002003
ZVARIOUS99- 195.06-TE CONSTRUCTION$12,700,0002004
ZVARIOUS99- 206.10-SAF CONSTRUCTION$5,000,0002001
ZVARIOUS99- 206.20-SAF CONSTRUCTION$5,000,0002002
ZVARIOUS99- 207.00-NH CONSTRUCTION$2,000,0002003
ZVARIOUS99- 208.00-NH CONSTRUCTION$1,000,0002004
ZVARIOUS99- 209.00-SP CONSTRUCTION$5,000,0002003
ZVARIOUS99- 212.05I-75SP CONSTRUCTION$200,0002001
ZVARIOUS99- 212.06I-75SP CONSTRUCTION$200,0002002
ZVARIOUS99- 212.07I-75SP CONSTRUCTION$200,0002003
ZVARIOUS99- 212.08I-75SP CONSTRUCTION$200,0002004
ZVARIOUS99- 219.01-CM CONSTRUCTION$4,200,0002001
ZVARIOUS99- 219.02-CM CONSTRUCTION$6,200,0002002
ZVARIOUS99- 219.03-CM CONSTRUCTION$4,300,0002003
ZVARIOUS99- 219.04-CM CONSTRUCTION$4,400,0002004
ZVARIOUS99- 228.00-BRZ CONSTRUCTION$875,0002002
ZVARIOUS99- 233.00-BRO CONSTRUCTION$550,0002001
ZVARIOUS99- 234.00-BRO CONSTRUCTION$775,0002002
ZVARIOUS99- 235.40-SP CONSTRUCTION$300,0002001
ZVARIOUS99- 235.50-SP CONSTRUCTION$300,0002002
ZVARIOUS99- 235.60-SP CONSTRUCTION$300,0002003
ZVARIOUS99- 235.70-SP CONSTRUCTION$300,0002004
ZVARIOUS99- 242.00-STP CONSTRUCTION$2,000,0002001
ZVARIOUS99- 243.00-STP CONSTRUCTION$750,0002002
ZVARIOUS99- 243.01-STP CONSTRUCTION$2,000,0002003
ZVARIOUS99- 243.02-STP CONSTRUCTION$500,0002004
ZVARIOUS99- 246.00-NH CONSTRUCTION$1,500,0002001
ZVARIOUS99- 252.00-SP CONSTRUCTION$1,500,0002001
ZVARIOUS99- 253.00-SP CONSTRUCTION$1,500,0002002
ZVARIOUS99- 253.01-SP CONSTRUCTION$1,500,0002003
ZVARIOUS99- 253.02-SP CONSTRUCTION$1,500,0002004
ZVARIOUS99- 258.00-SP CONSTRUCTION$500,0002001
ZVARIOUS99- 259.01-SP CONSTRUCTION$500,0002003
ZVARIOUS99- 268.00-BRO CONSTRUCTION$1,500,0002001
ZVARIOUS99- 269.00-BRO CONSTRUCTION$1,500,0002002
ZVARIOUS99- 275.00-SAF CONSTRUCTION$2,000,0002001
ZVARIOUS99- 276.00-SAF CONSTRUCTION$2,000,0002002
ZVARIOUS99- 277.00-SP CONSTRUCTION$5,000,0002001
ZVARIOUS99- 278.00-SP CONSTRUCTION$9,000,0002002
ZVARIOUS99- 278.10-SP CONSTRUCTION$5,000,0002004
ZVARIOUS99- 282.00-SPDESIGN$500,0002001
ZVARIOUS99- 283.00-SPDESIGN$500,0002002
ZVARIOUS99- 287.00-SPDESIGN$300,0002001
ZVARIOUS99- 288.00-SPDESIGN$300,0002002
ZVARIOUS99- 290.00-STP CONSTRUCTION$300,0002001
ZVARIOUS99- 300.00-IM CONSTRUCTION$4,000,0002001
ZVARIOUS99- 301.00-IM CONSTRUCTION$18,000,0002002
ZVARIOUS99- 302.01-STPDESIGN$100,0002001
ZVARIOUS99- 302.01-STP CONSTRUCTION$1,000,0002002
ZVARIOUS99- 302.02-STPDESIGN$50,0002003
ZVARIOUS99- 302.02-STP CONSTRUCTION$500,0002003
ZVARIOUS99- 319.00-SP CONSTRUCTION$2,000,0002001
ZVARIOUS99- 320.00-SP CONSTRUCTION$2,000,0002002
ZVARIOUS99- 324.00-BRO CONSTRUCTION$550,0002003
ZVARIOUS99- 325.00-BRO CONSTRUCTION$500,0002004
ZVARIOUS99- 326.00-BRO CONSTRUCTION$1,500,0002003
ZVARIOUS99- 327.00-BRO CONSTRUCTION$1,500,0002004
ZVARIOUS99- 330.00-FH CONSTRUCTION$300,0002001
ZVARIOUS99- 331.00-FH CONSTRUCTION$300,0002002
ZVARIOUS99- 332.00-FH CONSTRUCTION$300,0002003
ZVARIOUS99- 333.00-FH CONSTRUCTION$300,0002004
ZVARIOUS99- 334.00-SP CONSTRUCTION$2,000,0002003
ZVARIOUS99- 335.00-SP CONSTRUCTION$2,000,0002004
ZVARIOUS99- 336.00-IM CONSTRUCTION$9,000,0002003
ZVARIOUS99- 337.00-IM CONSTRUCTION$15,000,0002004
ZVARIOUS99- 338.00-SPDESIGN$500,0002003
ZVARIOUS99- 339.00-SPDESIGN$500,0002004
ZVARIOUS99- 340.00-SPDESIGN$300,0002003
ZVARIOUS99- 341.00-SPDESIGN$300,0002004
ZVARIOUS99- 342.00-BRODESIGN$1,000,0002002
ZVARIOUS99- 343.00-BRODESIGN$1,200,0002003
ZVARIOUS99- 344.00-BRODESIGN$2,000,0002004
ZVARIOUS99- 345.00-BRZ CONSTRUCTION$875,0002003
ZVARIOUS99- 346.00-BRZ CONSTRUCTION$875,0002004
ZVARIOUS99- 347.00-BRZDESIGN$400,0002002
ZVARIOUS99- 348.00-BRZDESIGN$500,0002003
ZVARIOUS99- 349.00-BRZDESIGN$500,0002004
ZVARIOUS99- 350.00-NHDESIGN$2,000,0002003
ZVARIOUS99- 351.00-SAFconstruction$2,000,0002003
ZVARIOUS99- 352.00-SAF CONSTRUCTION$2,000,0002004
ZVARIOUS99- 353.00-SAF CONSTRUCTION$7,000,0002003
ZVARIOUS99- 354.00-SAF CONSTRUCTION$7,000,0002004
ZVARIOUS99- 355.00-SAF CONSTRUCTION$2,000,0002003
ZVARIOUS99- 356.00-SAF CONSTRUCTION$2,000,0002004
ZVARIOUS99- 357.02-SPDESIGN$200,0002001
ZVARIOUS99- 357.03-SPDESIGN$200,0002002
ZVARIOUS99- 357.04-SPDESIGN$200,0002003
ZVARIOUS99- 357.05-SPDESIGN$200,0002004
ZVARIOUS99- 360.00-BRODESIGN$1,500,0002001
ZVARIOUS99- 1051.00-SP CONSTRUCTION$450,0002001
ZVARIOUS99- 1052.00-SP CONSTRUCTION$450,0002002
ZVARIOUS99- 1060.00-BRX CONSTRUCTION$250,0002001
ZVARIOUS99- 1061.00-BRX CONSTRUCTION$250,0002002
ZVARIOUS99- 1062.00-BRX CONSTRUCTION$250,0002003
ZVARIOUS99- 1063.00-BRX CONSTRUCTION$250,0002004
ZVARIOUS99- 1064.00-SP CONSTRUCTION$450,0002003
ZVARIOUS99- 1065.00-SP CONSTRUCTION$450,0002004
ZVARIOUS99- 1066.00-BRXDESIGN$500,0002003
ZVARIOUS99- 1067.00-BRXDESIGN$1,000,0002004
ZVARIOUS99- 1068.00-BRX CONSTRUCTION$4,000,0002004
ZVARIOUS99- 1069.00-BRZ CONSTRUCTION$3,700,0002004
ZVARIOUS99- 5002.00-SP CONSTRUCTION$1,000,0002001
ZVARIOUS99- 5003.00-SP CONSTRUCTION$1,000,0002002
ZVARIOUS99- 5004.00-SP CONSTRUCTION$1,000,0002003
ZVARIOUS99- 5006.00-SP CONSTRUCTION$1,000,0002004