UNOFFICIAL COPY AS OF 10/27/1800 REG. SESS.00 RS BR 2224

A JOINT RESOLUTION establishing the additional four (4) year highway construction plan outlined in the Recommended FY 2001 - FY 2006 Six Year Road Plan presented to the 2000 General Assembly.

WHEREAS, the statutes of the Commonwealth require a highway construction plan to be presented to the General Assembly that details those projects that will be presented for construction by the Department of Highways in future years; and

WHEREAS, the General Assembly recognizes the importance of planning and the assurance that once projects are initiated that they are completed; and

WHEREAS, in previous years shifting of projects has diminished the confidence of the General Assembly and the public that roads in the Six Year Road Plan will be constructed in a timely fashion; and

WHEREAS, the first major step in assuring that road projects are planned and built in a conscientious manner is to adopt projects scheduled for funding during the biennium in the budget memorandum and the projects scheduled for funding in the last four (4) years of the road plan in a joint resolution; and

WHEREAS, the General Assembly in adoption of this resolution is committed to working with the Department of Highways to develop a balanced and workable six (6) year road plan;

NOW, THEREFORE,

Be it resolved by the General Assembly of the Commonwealth of Kentucky:

Page 1 of 42

BR222400.100-2224

UNOFFICIAL COPY AS OF 10/27/1800 REG. SESS.00 RS BR 2224

Section 1. The projects authorized by the General Assembly in this Resolution constitute the official four (4) year highway construction plan outlined in the Recommended FY 2001 - FY 2006 Six Year Road Plan presented to the 1998 General Assembly. The following projects shall be the 2001-2006 additional four (4) year highway construction plan with project phases not scheduled for completion until after Fiscal Year 2000:

countyitem #routefundphaseestimateFY

ADAIR08- 159.00KY-55STP CONSTRUCTION$11,925,0002001

ADAIR08- 5005.00KY-6172SPDESIGN$35,0002002

ADAIR08- 5005.00KY-6172SP RIGHT OF WAY$10,0002003

ALLEN03- 146.11US-231STP CONSTRUCTION$7,000,0002001

ALLEN03- 146.40US-231STP RIGHT OF WAY$4,000,0002001

ALLEN03- 146.40US-231STPUTILITIES$3,500,0002002

ALLEN03- 146.41US-231STP CONSTRUCTION$8,000,0002003

ANDERSON07- 304.01US-127SP RIGHT OF WAY$1,500,0002001

ANDERSON07- 304.01US-127SPUTILITIES$1,000,0002002

ANDERSON07- 346.00KY-44STP CONSTRUCTION$2,000,0002001

ANDERSON07- 2008.00BG-9002SPDESIGN$60,0002002

ANDERSON07- 2008.00BG-9002SP CONSTRUCTION$3,750,0002004

BALLARD01- 23.00I-66NHDESIGN$500,0002002

BALLARD01- 115.00US-60SPDESIGN$750,0002003

BALLARD01- 185.00US-51NH CONSTRUCTION$2,500,0002003

BARREN03- 185.00KY-70KYD CONSTRUCTION$7,870,0002002

BARREN03- 192.01-SP RIGHT OF WAY$2,000,0002002

BARREN03- 192.01-SPUTILITIES$2,000,0002004

BARREN03- 192.20-SP CONSTRUCTION$10,000,0002001

BARREN03- 2002.00I-65IM CONSTRUCTION$2,500,0002002

BARREN03- 7000.00-SPright of way$1,200,0002001

BARREN03- 7000.00-SPutilities$800,0002002

BATH09- 127.00KY-36SPDESIGN$400,0002003

BATH09- 2001.00I-64IMDESIGN$80,0002001

BATH09- 2001.00I-64IM CONSTRUCTION$5,000,0002003

BATH09- 2002.00I-64IMDESIGN$180,0002003

BATH09- 5002.00I-64SPDESIGN$40,0002001

BATH09- 5002.00I-64SP CONSTRUCTION$400,0002002

BATH09- 5003.00I-64SPDESIGN$60,0002001

BATH09- 5003.00I-64SP CONSTRUCTION$900,0002002

BELL11- 57.00US-119NH RIGHT OF WAY$125,0002001

BELL11- 57.00US-119NHUTILITIES$60,0002001

BELL11- 57.00US-119NH CONSTRUCTION$2,000,0002002

BELL11- 135.00KY-92SPDESIGN$300,0002002

BELL11- 214.40US-25ESP CONSTRUCTION$1,250,0002001

BELL11- 214.50US-25ESP CONSTRUCTION$1,250,0002002

BELL11- 214.51US-25ESP CONSTRUCTION$1,250,0002003

BELL11- 214.52US-25ESP CONSTRUCTION$1,250,0002004

BELL11- 217.00KY-66SPDESIGN$40,0002001

BELL11- 217.00KY-66STP RIGHT OF WAY$1,500,0002003

BELL11- 1033.00KY-2013BRZ CONSTRUCTION$450,0002001

BELL11- 1034.00KY-988BRZ CONSTRUCTION$450,0002001

BELL11- 1044.00CR-1212BRZ CONSTRUCTION$250,0002001

BELL11- 1050.00KY-1491BRX RIGHT OF WAY$52,0002002

BELL11- 1050.00KY-1491BRXUTILITIES$10,0002002

BOONE06- 12.23I-275IM CONSTRUCTION$2,000,0002001

BOONE06- 64.01US-42STPUTILITIES$1,550,0002001

BOONE06- 64.01US-42STP CONSTRUCTION$8,000,0002002

BOONE06- 101.00KY-536SAF CONSTRUCTION$3,600,0002001

BOONE06- 116.00-SP CONSTRUCTION$1,400,0002001

BOONE06- 146.00-SP CONSTRUCTION$500,0002001

BOONE06- 316.01KY-1017SP RIGHT OF WAY$1,500,0002001

BOONE06- 316.01KY-1017SPUTILITIES$1,000,0002003

BOONE06- 331.01-CM CONSTRUCTION$500,0002001

BOONE06- 331.02-CM CONSTRUCTION$1,700,0002004

BOONE06- 351.00US-25STPDESIGN$750,0002002

BOONE06- 351.00US-25STP RIGHT OF WAY$2,000,0002004

BOONE06- 1039.00-CM CONSTRUCTION$50,0002001

BOONE06- 1044.02-CM CONSTRUCTION$1,250,0002001

BOONE06- 1044.03-CM CONSTRUCTION$1,500,0002002

BOONE06- 1044.04-CM CONSTRUCTION$1,700,0002003

BOONE06- 1044.05-CM CONSTRUCTION$1,500,0002004

BOONE06- 2002.00I-275IM CONSTRUCTION$12,100,0002001

BOONE06- 2004.00I-71IM CONSTRUCTION$2,600,0002001

BOONE06- 5001.00US-42SP CONSTRUCTION$512,5002001

BOURBON07- 310.01US-68NH CONSTRUCTION$14,000,0002001

BOURBON07- 310.02US-68NH CONSTRUCTION$8,000,0002001

BOURBON07- 310.03US-68NH CONSTRUCTION$4,000,0002002

BOYD09- 112.00US-23SNH CONSTRUCTION$2,000,0002004

BOYD09- 129.00-STPDESIGN$1,000,0002001

BOYD09- 141.00KY-5SPDESIGN$300,0002004

BOYD09- 176.00US-23NHUTILITIES$100,0002001

BOYD09- 176.00US-23NH CONSTRUCTION$720,0002002

BOYD09- 212.31-SP CONSTRUCTION$5,000,0002004

BOYD09- 275.00US-60STP CONSTRUCTION$2,900,0002001

BOYD09- 5005.00US-23SPDESIGN$50,0002002

BOYD09- 5005.00US-23SP RIGHT OF WAY$15,0002003

BOYD09- 5005.00US-23SPUTILITIES$20,0002003

BOYLE07- 210.00KY-2168SPDESIGN$600,0002002

BOYLE07- 210.00KY-2168SP RIGHT OF WAY$3,600,0002004

BOYLE07- 211.00US-150BSP RIGHT OF WAY$800,0002002

BOYLE07- 211.00US-150BSPUTILITIES$300,0002003

BRACKEN06- 355.03-SP CONSTRUCTION$125,0002001

BRACKEN06- 355.04-SP CONSTRUCTION$125,0002002

BRACKEN06- 355.05-SP CONSTRUCTION$125,0002003

BRACKEN06- 355.06-SP CONSTRUCTION$125,0002004

BREATHITT10- 270.11KY-15NH CONSTRUCTION$4,000,0002002

BREATHITT10- 270.12KY-15NH CONSTRUCTION$9,000,0002003

BREATHITT10- 270.20KY-15SPUTILITIES$1,500,0002001

BREATHITT10- 285.01KY-15NH RIGHT OF WAY$7,310,0002001

BREATHITT10- 285.01KY-15NHUTILITIES$925,0002003

BREATHITT10- 286.01KY-15NH RIGHT OF WAY$10,500,0002001

BREATHITT10- 286.01KY-15NHUTILITIES$1,700,0002003

BREATHITT10- 5007.00KY-1812SPDESIGN$100,0002003

BREATHITT10- 5007.00KY-1812SP RIGHT OF WAY$40,0002004

BRECKINRIDGE 04- 1048.00KY-992BRX CONSTRUCTION$300,000 2002

BULLITT05- 117.00KY-61STP RIGHT OF WAY$5,000,0002001

BULLITT05- 117.00KY-61STPUTILITIES$2,000,0002003

BULLITT05- 117.00KY-61STP CONSTRUCTION$10,000,0002004

BULLITT05- 347.50KY-44STPDESIGN$1,000,0002004

BULLITT05- 2008.00I-65IM CONSTRUCTION$600,0002002

BULLITT05- 5004.00KY-44SPDESIGN$65,0002001

BULLITT05- 5004.00KY-44SP RIGHT OF WAY$75,0002002

BULLITT05- 5004.00KY-44SP CONSTRUCTION$500,0002003

BUTLER03- 5000.00US-231SP CONSTRUCTION$180,0002002

CALDWELL02- 2011.00WK-9001SPDESIGN$70,0002003

CALDWELL02- 2011.00WK-9001SP CONSTRUCTION$4,000,0002004

CALDWELL02- 5005.00WK-9001SP RIGHT OF WAY$50,0002001

CALDWELL02- 5005.00WK-9001SPUTILITIES$10,0002001

CALDWELL02- 5005.00WK-9001SP CONSTRUCTION$1,100,0002002

CALLOWAY01- 181.11US-68SP CONSTRUCTION$16,000,0002001

CALLOWAY01- 181.14US-68SP CONSTRUCTION$16,000,0002002

CALLOWAY01- 181.21KY-80SPUTILITIES$1,210,0002002

CALLOWAY01- 181.22KY-80SPUTILITIES$3,300,0002002

CALLOWAY01- 181.22KY-80SP CONSTRUCTION$6,000,0002004

CALLOWAY01- 181.30KY-80SPUTILITIES$2,870,0002001

CALLOWAY01- 181.30KY-80SP CONSTRUCTION$12,000,0002003

CALLOWAY01- 181.31KY-80SPUTILITIES$3,300,0002001

CALLOWAY01- 181.31KY-80SP CONSTRUCTION$6,000,0002003

CALLOWAY01- 181.35KY-80SP CONSTRUCTION$14,000,0002004

CALLOWAY01- 314.00US-641SPDESIGN$1,800,0002002

CALLOWAY01- 1127.00KY-280BRX CONSTRUCTION$450,0002002

CALLOWAY01- 1128.00KY-1824BRX RIGHT OF WAY$55,0002001

CALLOWAY01- 1128.00KY-1824BRXUTILITIES$200,0002002

CALLOWAY01- 1128.00KY-1824BRX CONSTRUCTION$700,0002003

CALLOWAY01- 1129.00KY-1824BRX RIGHT OF WAY$55,0002001

CALLOWAY01- 1129.00KY-1824BRXUTILITIES$200,0002002

CALLOWAY01- 1129.00KY-1824BRX CONSTRUCTION$1,000,0002003

CAMPBELL06- 6.00I-471IM CONSTRUCTION$3,000,0002002

CAMPBELL06- 46.20US-27SP CONSTRUCTION$12,000,0002002

CAMPBELL06- 125.00KY-2938SPDESIGN$600,0002003

CAMPBELL06- 352.00KY-536SPDESIGN$600,0002001

CAMPBELL06- 352.00KY-536STP RIGHT OF WAY$7,000,0002003

CAMPBELL06- 1029.00KY-1120BROUTILITIES$500,0002001

CAMPBELL06- 1029.00KY-1120BRO CONSTRUCTION$2,800,0002002

CAMPBELL06- 5003.00KY-8SP RIGHT OF WAY$100,0002002

CAMPBELL06- 5003.00KY-8SP CONSTRUCTION$3,000,0002003

CAMPBELL06- 5004.00I-275SPDESIGN$180,0002001

CAMPBELL06- 5004.00I-275SP CONSTRUCTION$1,500,0002002

CAMPBELL06- 5005.00I-275SPDESIGN$210,0002001

CAMPBELL06- 5005.00I-275NH CONSTRUCTION$1,750,0002002

CAMPBELL06- 5006.00I-471SPDESIGN$100,0002001

CAMPBELL06- 5006.00I-471SP CONSTRUCTION$1,000,0002002

CARLISLE01- 183.00US-51STPDESIGN$600,0002002

CARLISLE01- 1119.00US-62BRO RIGHT OF WAY$150,0002001

CARLISLE01- 1119.00US-62BROUTILITIES$160,0002001

CARLISLE01- 1119.00US-62BRO CONSTRUCTION$600,0002003

CARROLL06- 12.25I-71IM CONSTRUCTION$700,0002001

CARROLL06- 147.00US-42SP CONSTRUCTION$5,000,0002001

CARROLL06- 347.00KY-389BRX RIGHT OF WAY$100,0002001

CARROLL06- 347.00KY-389BRXUTILITIES$75,0002001

CARROLL06- 347.00KY-389BRX CONSTRUCTION$850,0002002

CARROLL06- 5009.00I-71SPDESIGN$90,0002003

CARTER09- 144.00-SPDESIGN$225,0002003

CARTER09- 159.00US-60STPUTILITIES$300,0002001

CARTER09- 159.00US-60STP CONSTRUCTION$3,375,0002003

CARTER09- 1041.00KY-1947BRX RIGHT OF WAY$50,0002001

CARTER09- 1041.00KY-1947BRXUTILITIES$45,0002001

CARTER09- 1041.00KY-1947BRX CONSTRUCTION$345,0002003

CARTER09- 2003.00I-64IMDESIGN$50,0002004

CARTER09- 5004.00US-60SPDESIGN$65,0002001

CARTER09- 5004.00US-60SP RIGHT OF WAY$20,0002002

CARTER09- 5004.00US-60SPUTILITIES$40,0002002

CARTER09- 5004.00US-60SP CONSTRUCTION$800,0002003

CASEY08- 142.00KY-70SPDESIGN$500,0002004

CASEY08- 164.00US-127STPDESIGN$150,0002001

CASEY08- 164.00US-127STP RIGHT OF WAY$200,0002002

CASEY08- 164.00US-127STPUTILITIES$100,0002002

CASEY08- 164.00US-127STP CONSTRUCTION$600,0002003

CASEY08- 5002.00US-127SPDESIGN$50,0002001

CASEY08- 5002.00US-127SP RIGHT OF WAY$12,0002002

CASEY08- 5002.00US-127SP CONSTRUCTION$280,0002002

CHRISTIAN02- 100.00PE-9004NH RIGHT OF WAY$5,000,0002002

CHRISTIAN02- 100.00PE-9004NHUTILITIES$2,000,0002003

CHRISTIAN02- 100.00PE-9004NH CONSTRUCTION$19,000,0002004

CHRISTIAN02- 213.00I-24IMDESIGN$500,0002001

CHRISTIAN02- 213.00I-24IM RIGHT OF WAY$1,000,0002003

CHRISTIAN02- 213.00I-24IMUTILITIES$750,0002004

CHRISTIAN02- 308.00US-41ANH CONSTRUCTION$10,000,0002001

CHRISTIAN02- 311.00us-41aNH CONSTRUCTION$11,000,0002002

CHRISTIAN02- 311.01UA-41aNHUTILITIES$2,000,0002001

CHRISTIAN02- 2000.00I-24IM CONSTRUCTION$2,500,0002002

CHRISTIAN02- 7000.00-SP CONSTRUCTION$8,000,0002001

CHRISTIAN02- 7010.00-SP CONSTRUCTION$2,000,0002001

CLARK07- 314.00KY-1958SPDESIGN$200,0002003

CLARK07- 331.01-SP RIGHT OF WAY$3,000,0002001

CLARK07- 331.01-SPUTILITIES$2,635,0002002

CLARK07- 331.01-SP CONSTRUCTION$10,000,0002003

CLARK07- 1080.00CR-1210BRZ CONSTRUCTION$350,0002001

CLARK07- 2001.00I-64IM CONSTRUCTION$2,000,0002002

CLARK07- 2002.00I-64IM CONSTRUCTION$3,100,0002002

CLARK07- 2010.00KY-9000SPDESIGN$150,0002003

CLARK07- 2010.00KY-9000SP CONSTRUCTION$7,360,0002004

CLAY11- 273.01US-421SP RIGHT OF WAY$5,600,0002002

CLAY11- 273.01US-421SPUTILITIES$2,700,0002004

CLAY11- 1035.00US-421BRO CONSTRUCTION$800,0002002

CLAY11- 2005.00DB-9006SPDESIGN$90,0002002

CLAY11- 2006.00DB-9006SPDESIGN$50,0002002

CLAY11- 2006.00DB-9006SP CONSTRUCTION$5,000,0002003

CLAY11- 4087.00CR-1118SP CONSTRUCTION$800,0002001

CLAY11- 5000.00KY-11SP RIGHT OF WAY$10,0002001

CLAY11- 5000.00KY-11SPUTILITIES$10,0002001

CLAY11- 5000.00KY-11SP CONSTRUCTION$420,5002002

CLAY11- 5005.00KY-66SPDESIGN$80,0002003

CLAY11- 5005.00KY-66SP RIGHT OF WAY$20,0002004

clay11- 5005.00KY-66SPutilities$20,0002004

CLAY11- 5006.00KY-80SPDESIGN$50,0002004

CLINTON08- 165.00US-127SPutilities$2,500,0002001

CLINTON08- 165.00US-127SPconstruction$7,000,0002002

CLINTON08- 260.02US-127SP CONSTRUCTION$7,000,0002001

CLINTON08- 260.10US-127STP RIGHT OF WAY$2,500,0002001

CLINTON08- 260.10US-127STPUTILITIES$3,000,0002003

CLINTON08- 260.10US-127STP CONSTRUCTION$8,500,0002004

CLINTON08- 1015.00KY-1076BRX RIGHT OF WAY$250,0002003

CLINTON08- 1015.00KY-1076BRXUTILITIES$150,0002004

CRITTENDEN01- 187.00US-641SPDESIGN$400,0002001

CRITTENDEN01- 250.01US-60SP RIGHT OF WAY$2,000,0002001

CRITTENDEN01- 250.01US-60SPUTILITIES$1,000,0002002

CRITTENDEN01- 250.01US-60SP CONSTRUCTION$14,000,0002004

CRITTENDEN01- 267.01US-60SP RIGHT OF WAY$1,200,0002002

CRITTENDEN01- 267.01US-60SPUTILITIES$1,520,0002003

CRITTENDEN01- 325.00KY-91SP CONSTRUCTION$262,0002001

CRITTENDEN01- 326.00KY-91SP CONSTRUCTION$262,0002002

CRITTENDEN01- 326.01KY-91SP CONSTRUCTION$262,0002003

CRITTENDEN01- 326.02KY-91SP CONSTRUCTION$262,0002004

CUMBERLAND 08- 158.04 KY-61SP RIGHT OF WAY$8,000,000 2001

CUMBERLAND 08- 158.04 KY-61SPutilities$7,000,000 2002

DAVIESS02- 179.00US-231STP CONSTRUCTION$2,500,0002004

DAVIESS02- 221.00KY-2121SPDESIGN$750,0002002

DAVIESS02- 221.00KY-2121SP RIGHT OF WAY$780,0002004

DAVIESS02- 287.00US-60STP RIGHT OF WAY$4,000,0002003

DAVIESS02- 287.00US-60STPUTILITIES$2,500,0002004

DAVIESS02- 2012.00US-60BSP CONSTRUCTION$3,600,0002001

EDMONSON03- 140.00KY-101SP RIGHT OF WAY$750,0002002

EDMONSON03- 140.00KY-101SPUTILITIES$500,0002002

EDMONSON03- 140.00KY-101SP CONSTRUCTION$5,000,0002004

EDMONSON03- 141.00KY-70SP RIGHT OF WAY$300,0002001

EDMONSON03- 141.00KY-70SPUTILITIES$200,0002001

EDMONSON03- 141.00KY-70SP CONSTRUCTION$2,000,0002002

EDMONSON03-7010.00KY-259SPDESIGN$300,0002002

EDMONSON03-7010.00KY-259SPright of way$400,0002003

EDMONSON03-7030.00KY-259SPDESIGN$6,300,0002003

ELLIOTT09- 126.00KY-7SP RIGHT OF WAY$2,000,0002001

ELLIOTT09- 126.00KY-7SPUTILITIES$850,0002001

ELLIOTT09- 126.00KY-7SP CONSTRUCTION$8,000,0002002

ELLIOTT09- 126.50KY-7STP RIGHT OF WAY$3,500,0002001

ELLIOTT09- 126.50KY-7STPUTILITIES$1,000,0002002

ELLIOTT09- 293.01KY-7SPDESIGN$400,0002002

ELLIOTT09- 293.01KY-7SP RIGHT OF WAY$1,000,0002004

ELLIOTT09- 293.01KY-7SPUTILITIES$750,0002004

ELLIOTT09- 1039.00KY-706BRX RIGHT OF WAY$20,0002001

ELLIOTT09- 1039.00KY-706BRXUTILITIES$20,0002001

ELLIOTT09- 1039.00KY-706BRX CONSTRUCTION$230,0002002

ESTILL10- 363.00KY-89SP RIGHT OF WAY$2,200,0002001

ESTILL10- 363.00KY-89SPUTILITIES$1,000,0002003

ESTILL10- 364.00KY-82SP RIGHT OF WAY$100,0002002

ESTILL10- 364.00KY-82SPUTILITIES$100,0002002

ESTILL10- 364.00KY-82SP CONSTRUCTION$800,0002004

ESTILL10- 1040.00KY-594BRX RIGHT OF WAY$100,0002001

ESTILL10- 1040.00KY-594BRXUTILITIES$75,0002001

ESTILL10- 1040.00KY-594BRX CONSTRUCTION$250,0002002

ESTILL10- 1045.00CR-5323BRZ CONSTRUCTION$275,0002001

ESTILL10- 1053.00KY-594BRX CONSTRUCTION$150,0002001

ESTILL10- 5001.00KY-89SP CONSTRUCTION$262,7002001

FAYETTE07- 122.00US-25STP RIGHT OF WAY$4,300,0002001

FAYETTE07- 122.00US-25STPUTILITIES$3,000,0002002

FAYETTE07- 125.20KY-4STPDESIGN$200,0002003

FAYETTE07- 144.00US-68SPDESIGN$400,0002004

FAYETTE07- 325.01US-25SPUTILITIES$3,090,0002001

FAYETTE07- 325.01US-25SP CONSTRUCTION$2,500,0002002

FAYETTE07- 329.00KY-922STP CONSTRUCTION$9,200,0002003

FAYETTE07- 356.00KY-169SP CONSTRUCTION$125,0002001

FAYETTE07- 357.00KY-169SP CONSTRUCTION$125,0002002

FAYETTE07- 357.01KY-169SP CONSTRUCTION$125,0002003

FAYETTE07- 357.02KY-169SP CONSTRUCTION$125,0002004

FAYETTE07- 362.00KY-4STPDESIGN$250,0002002

FAYETTE07- 996.05-SLX CONSTRUCTION$5,800,0002001

FAYETTE07- 996.06-SLX CONSTRUCTION$5,800,0002002

FAYETTE07- 996.07-SLX CONSTRUCTION$5,800,0002003

FAYETTE07- 996.08-SLX CONSTRUCTION$5,800,0002004

FAYETTE07- 1071.00CR-9999BRO CONSTRUCTION$715,0002001

FAYETTE07- 1088.00KY-1970BRX RIGHT OF WAY$100,0002002

FAYETTE07- 1088.00KY-1970BRXUTILITIES$40,0002002

FAYETTE07- 1088.00KY-1970BRX CONSTRUCTION$200,0002004

FAYETTE07- 5004.00US-421SPDESIGN$80,0002002

FAYETTE07- 5004.00US-421SP CONSTRUCTION$750,0002003

FLEMING09- 174.50KY-11STP RIGHT OF WAY$750,0002001

FLEMING09- 174.50KY-11STPUTILITIES$500,0002001

FLEMING09- 174.50KY-11STP CONSTRUCTION$10,500,0002003

FLOYD12- 108.00US-23SPDESIGN$150,0002004

FLOYD12- 282.00KY-122SPUTILITIES$200,0002001

FLOYD12- 282.00KY-122SP CONSTRUCTION$2,250,0002002

FLOYD12- 293.00KY-1428STP CONSTRUCTION$3,000,0002001

FLOYD12- 301.00KY-979SPUTILITIES$2,000,0002001

FLOYD12- 301.00KY-979SP CONSTRUCTION$11,000,0002003

FLOYD12- 301.10KY-680SP RIGHT OF WAY$3,500,0002001

FLOYD12- 301.10KY-680SPUTILITIES$3,500,0002001

FLOYD12- 301.20KY-979SPDESIGN$1,200,0002002

FLOYD12- 301.20KY-979SP RIGHT OF WAY$3,500,0002003

FLOYD12- 402.00KY-3384SP CONSTRUCTION$2,100,0002001

FLOYD12- 1039.00KY-550BRO CONSTRUCTION$1,000,0002002

FLOYD12- 1040.00KY-1428BRX CONSTRUCTION$1,000,0002001

FLOYD12- 1041.00KY-1428BRX CONSTRUCTION$1,000,0002001

FLOYD12- 1047.00CR-1390BRZ CONSTRUCTION$600,0002001

FLOYD12- 1060.00CR-1265BRZDESIGN$100,0002001

FLOYD12- 1060.00CR-1265BRZ RIGHT OF WAY$60,0002003

FLOYD12- 1060.00CR-1265BRZUTILITIES$200,0002003

FLOYD12- 5004.00KY-80SP RIGHT OF WAY$20,0002001

FLOYD12- 5004.00KY-80SP CONSTRUCTION$800,0002002

FLOYD12- 5007.00KY-80SPDESIGN$210,0002002

FLOYD12- 5007.00KY-80SP RIGHT OF WAY$45,0002003

FLOYD12- 5009.00KY-321SPDESIGN$200,0002004

FRANKLIN05- 97.50US-60STP RIGHT OF WAY$800,0002002

FRANKLIN05- 97.50US-60STPUTILITIES$500,0002004

FRANKLIN05- 305.01US-421STP RIGHT OF WAY$800,0002001

FRANKLIN05- 305.01US-421STPUTILITIES$600,0002003

FRANKLIN05- 305.01US-421STP CONSTRUCTION$8,000,0002004

FRANKLIN05- 372.00US-460STP RIGHT OF WAY$4,500,0002001

FRANKLIN05- 372.00US-460STPUTILITIES$1,000,0002003

FRANKLIN05- 372.00US-460STP CONSTRUCTION$11,500,0002004

FRANKLIN05- 2005.00I-64IMDESIGN$210,0002001

FRANKLIN05- 2005.00I-64IM CONSTRUCTION$13,900,0002003

FRANKLIN05- 2023.00US-60SPDESIGN$50,0002004

FRANKLIN05- 5002.00US-421SPDESIGN$80,0002001

FRANKLIN05- 5002.00US-421SP CONSTRUCTION$750,0002002

FRANKLIN05- 5007.00KY-1900SPDESIGN$60,0002004

FULTON01- 319.00KY-1354SP CONSTRUCTION$125,0002001

FULTON01- 320.00KY-1354SP CONSTRUCTION$125,0002002

FULTON01- 320.01KY-1354SP CONSTRUCTION$125,0002003

FULTON01- 320.02KY-1354SP CONSTRUCTION$125,0002004

FULTON01- 1118.00US-45BRO RIGHT OF WAY$200,0002001

FULTON01- 1118.00US-45BROUTILITIES$605,0002001

FULTON01- 1118.00US-45BRO CONSTRUCTION$1,200,0002003

FULTON01- 2008.00PU-9003SP CONSTRUCTION$900,0002001

GALLATIN06- 202.00US-42SP RIGHT OF WAY$250,0002001

GALLATIN06- 202.00US-42SPUTILITIES$100,0002002

GALLATIN06- 202.00US-42SP CONSTRUCTION$5,700,0002003

GALLATIN06- 333.01-STP CONSTRUCTION$10,000,0002001

GALLATIN06- 333.02-STP CONSTRUCTION$10,000,0002004

GALLATIN06- 2005.00I-71IM CONSTRUCTION$3,300,0002004

GALLATIN06- 2006.00I-71IM CONSTRUCTION$2,000,0002004

GALLATIN06- 2007.00I-71IM CONSTRUCTION$2,000,0002004

GARRARD07- 26.01US-27NH RIGHT OF WAY$3,500,0002001

GARRARD07- 26.01US-27NHUTILITIES$1,500,0002002

GARRARD07- 26.01US-27NH CONSTRUCTION$12,000,0002003

GARRARD07- 26.02US-27NH CONSTRUCTION$4,000,0002004

GARRARD07- 302.03KY-52STP CONSTRUCTION$3,800,0002002

GARRARD07- 302.04KY-52STP CONSTRUCTION$7,453,0002001

GRANT06- 72.02I-75IM CONSTRUCTION$12,000,0002001

GRANT06- 72.03I-75NH CONSTRUCTION$9,000,0002001

GRANT06- 72.04I-75IM CONSTRUCTION$6,000,0002002

GRANT06- 72.05I-75NH CONSTRUCTION$17,000,0002002

GRANT06- 72.12I-75IM CONSTRUCTION$16,000,0002004

GRANT06- 72.13I-75NH CONSTRUCTION$10,000,0002004

GRANT06- 339.00I-75STP CONSTRUCTION$7,000,0002002

GRANT06- 345.00-SP CONSTRUCTION$9,200,0002001

GRANT06- 345.10-SPUTILITIES$250,0002001

GRANT06- 345.10-SP CONSTRUCTION$2,500,0002003

GRANT06- 5000.00US-25SP CONSTRUCTION$282,0002001

GRAYSON04- 122.00KY-259SPDESIGN$500,0002004

GRAYSON04- 193.00US-62SP RIGHT OF WAY$500,0002001

GRAYSON04- 193.00US-62SPUTILITIES$300,0002002

GRAYSON04- 193.00US-62SP CONSTRUCTION$3,000,0002004

GRAYSON04- 308.00-STPDESIGN$1,200,0002003

GRAYSON04- 1013.01KY-259STP CONSTRUCTION$10,700,0002001

GRAYSON04- 2005.00WK-9001NHDESIGN$25,0002002

GRAYSON04- 2005.00WK-9001NH CONSTRUCTION$1,200,0002003

GRAYSON04- 2008.00WK-9001STPDESIGN$70,0002003

GRAYSON04- 2008.00WK-9001STP CONSTRUCTION$4,100,0002004

GRAYSON04- 2009.00WK-9001STPDESIGN$70,0002003

GRAYSON04- 2009.00WK-9001STP CONSTRUCTION$4,000,0002004

GREEN04- 310.00-STPDESIGN$800,0002003

GREENUP09- 109.00KY-8SSTP CONSTRUCTION$2,500,0002004

GREENUP09- 132.00KY-2SPDESIGN$500,0002004

GREENUP09- 212.11-SP CONSTRUCTION$20,000,0002001

GREENUP09- 212.20-SP CONSTRUCTION$8,000,0002001

GREENUP09- 212.21-SP CONSTRUCTION$12,000,0002002

GREENUP09- 212.30-SP CONSTRUCTION$19,000,0002003

GREENUP09- 1028.00KY-503BRO CONSTRUCTION$630,0002002

GREENUP09- 1038.00KY-2541BRX RIGHT OF WAY$70,0002002

GREENUP09- 1038.00KY-2541BRXUTILITIES$30,0002002

GREENUP09- 5001.00KY-503SP RIGHT OF WAY$100,0002001

GREENUP09- 5001.00KY-503SP CONSTRUCTION$570,0002002

GREENUP09- 5006.00KY-1SPDESIGN$35,0002003

GREENUP09- 5006.00KY-1SP RIGHT OF WAY$10,0002004

GREENUP09- 5006.00KY-1SPUTILITIES$20,0002004

HANCOCK02- 125.00US-60STPDESIGN$150,0002004

HANCOCK02- 216.00CR-1102BRZDESIGN$50,0002001

HANCOCK02- 216.00CR-1102BRZ RIGHT OF WAY$50,0002003

HANCOCK02- 216.00CR-1102BRZUTILITIES$50,0002003

HANCOCK02- 216.00CR-1102BRZ CONSTRUCTION$200,0002004

HANCOCK02- 2022.00US-60SP CONSTRUCTION$1,210,0002004

HARDIN04- 189.00US-31WSP CONSTRUCTION$500,0002001

HARDIN04- 190.00US-31WSPUTILITIES$1,750,0002001

HARDIN04- 190.00US-31WSP CONSTRUCTION$1,720,0002002

HARDIN04- 297.10KY-313STP RIGHT OF WAY$4,500,0002001

HARDIN04- 2001.00I-65IM CONSTRUCTION$1,800,0002002

HARDIN04- 2003.00US-31WSPDESIGN$100,0002002

HARDIN04- 2003.00US-31WSP CONSTRUCTION$4,400,0002004

HARDIN04- 2007.00 US-31WBSPDESIGN$85,0002003

HARDIN04- 5002.00US-31WSP CONSTRUCTION$750,0002002

HARDIN04- 5003.00BG-9002SPDESIGN$65,0002002

HARDIN04- 5003.00BG-9002SP CONSTRUCTION$500,0002003

HARDIN04- 5004.00BG-9002SPDESIGN$65,0002002

HARDIN04- 5004.00BG-9002SP RIGHT OF WAY$25,0002002

HARDIN04- 5004.00BG-9002SP CONSTRUCTION$750,0002003

HARDIN04- 5005.00I-65SPDESIGN$100,0002003

HARLAN11- 254.00US-421SPUTILITIES$500,0002001

HARLAN11- 254.00US-421SP CONSTRUCTION$21,000,0002002

HARLAN11- 264.20US-421SP CONSTRUCTION$14,200,0002001

HARLAN11- 264.30US-421SP CONSTRUCTION$10,000,0002001

HARLAN11- 264.31US-421SP CONSTRUCTION$19,000,0002002

HARLAN11- 267.11US-421SPDESIGN$500,0002003

HARLAN11- 269.00US-421SP RIGHT OF WAY$5,500,0002002

HARLAN11- 269.00US-421SPUTILITIES$300,0002004

HARLAN11- 1036.00KY-215BRX CONSTRUCTION$470,0002001

HARLAN11- 1038.00KY-215BRX CONSTRUCTION$700,0002001

HARLAN11- 1049.00KY-1601BRX RIGHT OF WAY$50,0002002

HARLAN11- 1049.00KY-1601BRXUTILITIES$50,0002002

HARLAN11- 5003.00KY-38SPDESIGN$180,0002002

HARLAN11- 5003.00KY-38SP RIGHT OF WAY$40,0002003

HARLAN11- 5003.00KY-38SPUTILITIES$15,0002003

HARLAN11- 5003.00KY-38SP CONSTRUCTION$1,500,0002004

HARLAN11- 5004.00KY-38SPDESIGN$180,0002002

HARLAN11- 5004.00KY-38SP RIGHT OF WAY$50,0002003

HARLAN11- 5004.00KY-38SPUTILITIES$20,0002003

HARLAN11- 7020.00-SPconstruction$500,0002002

HARRISON06- 119.02US-27SP RIGHT OF WAY$2,400,0002001

HARRISON06- 119.02US-27SPUTILITIES$1,000,0002002

HARRISON06- 1043.00CR-1062BRZDESIGN$200,0002002

HART04- 11.00I-65IM CONSTRUCTION$4,500,0002001

HART04- 11.10I-65IM CONSTRUCTION$4,500,0002001

HART04- 194.00US-31WSP RIGHT OF WAY$150,0002001

HART04- 194.00US-31WSPUTILITIES$100,0002002

HART04- 194.00US-31WSP CONSTRUCTION$600,0002004

HENDERSON02- 69.00I-69SPDESIGN$600,0002002

HENDERSON02- 79.10US-60SPDESIGN$1,200,0002002

HENDERSON02- 79.10US-60STP RIGHT OF WAY$2,500,0002003

HENDERSON02- 79.02US-60STP RIGHT OF WAY$4,000,0002002

HENDERSON02- 79.02US-60STPUTILITIES$2,000,0002003

HENDERSON02- 101.00US-60SAF CONSTRUCTION$3,500,0002002

HENDERSON02- 126.00US-60STPDESIGN$200,0002001

HENDERSON02- 126.00US-60STP RIGHT OF WAY$1,000,0002003

HENDERSON02- 380.00US-60SP CONSTRUCTION$600,0002001

HENDERSON02- 5000.00AU-9005SP CONSTRUCTION$285,5002001

HENDERSON02- 5001.00AU-9005SP CONSTRUCTION$350,0002001

HENDERSON02- 5004.00AU-9005SP RIGHT OF WAY$10,0002001

HENDERSON02- 5004.00AU-9005SP CONSTRUCTION$248,5002002

HENRY05- 2010.00I-71IM CONSTRUCTION$1,000,0002002

HENRY05- 5000.00KY-389SP CONSTRUCTION$628,7002002

HICKMAN01- 182.00US-51STPDESIGN$700,0002002

HICKMAN01- 1114.00KY-1698BRZ CONSTRUCTION$300,0002002

HOPKINS02- 215.00KY-70SP RIGHT OF WAY$2,800,0002001

HOPKINS02- 215.00KY-70SPUTILITIES$2,650,0002002

HOPKINS02- 2007.00PE-9004SPDESIGN$80,0002001

HOPKINS02- 2007.00PE-9004STP CONSTRUCTION$5,500,0002003

HOPKINS02- 2010.00PE-9004SPDESIGN$200,0002003

JACKSON11- 113.00US-421STPDESIGN$200,0002003

JEFFERSON05- 15.00I-264IM CONSTRUCTION$3,500,0002004

JEFFERSON05- 21.00I-265IMUTILITIES$1,000,0002002

JEFFERSON05- 21.00I-265IM CONSTRUCTION$20,000,0002003

JEFFERSON05- 23.00I-64IMDESIGN$1,500,0002001

JEFFERSON05- 23.00I-64IM CONSTRUCTION$7,000,0002003

JEFFERSON05- 41.00I-265IM RIGHT OF WAY$2,000,0002002

JEFFERSON05- 41.00I-265IMUTILITIES$1,000,0002003

JEFFERSON05- 52.00I-64IM RIGHT OF WAY$2,500,0002003

JEFFERSON05- 52.00I-64IMUTILITIES$300,0002003

JEFFERSON05- 52.00I-64IM CONSTRUCTION$8,000,0002004

JEFFERSON05- 48.01I-71NH RIGHT OF WAY$4,000,0002002

JEFFERSON05- 48.01I-71NHUTILITIES$2,000,0002004

JEFFERSON05- 76.01-STP CONSTRUCTION$1,500,0002002

JEFFERSON05- 76.02-SLO CONSTRUCTION$4,750,0002001

JEFFERSON05- 91.02-SLO CONSTRUCTION$4,000,0002003

JEFFERSON05- 110.00US-31NH CONSTRUCTION$2,500,0002004

JEFFERSON05- 118.02-SPDESIGN$3,000,0002001

JEFFERSON05- 118.10-SPDESIGN$6,000,0002002

JEFFERSON05- 118.11-SPDESIGN$6,000,0002003

JEFFERSON05- 118.20-SP RIGHT OF WAY$6,000,0002004

JEFFERSON05- 136.00I-265NH CONSTRUCTION$3,500,0002004

JEFFERSON05- 247.10KY-1450SPUTILITIES$3,700,0002003

JEFFERSON05- 247.20KY-1450SPDESIGN$300,0002002

JEFFERSON05- 322.00-SLO CONSTRUCTION$3,750,0002001

JEFFERSON05- 322.02-SLO CONSTRUCTION$10,087,0002002

JEFFERSON05- 323.01KY-1931SPUTILITIES$3,500,0002002

JEFFERSON05- 325.01KY-1447SPUTILITIES$6,500,0002001

JEFFERSON05- 325.01KY-1447STP CONSTRUCTION$15,000,0002002

JEFFERSON05- 342.02-CM CONSTRUCTION$1,800,0002002

JEFFERSON05- 344.00KY-1747SPDESIGN$1,500,0002003

JEFFERSON05- 381.00-SLO CONSTRUCTION$444,0002001

JEFFERSON05- 382.00-SLO CONSTRUCTION$511,0002002

JEFFERSON05- 383.00-SLO CONSTRUCTION$588,0002003

JEFFERSON05- 384.00-SLO CONSTRUCTION$676,0002004

JEFFERSON05- 385.00-SLO CONSTRUCTION$2,000,0002003

JEFFERSON05- 386.00-SLO RIGHT OF WAY$250,0002001

JEFFERSON05- 386.00-SLOUTILITIES$375,0002003

JEFFERSON05- 386.00-SLO CONSTRUCTION$1,500,0002004

JEFFERSON05- 387.00-SLO CONSTRUCTION$1,000,0002003

JEFFERSON05- 430.02KY-1020SLO CONSTRUCTION$4,300,0002003

JEFFERSON05- 430.03KY-1020SP CONSTRUCTION$1,000,0002001

JEFFERSON05- 435.10-SP CONSTRUCTION$5,000,0002001

JEFFERSON05- 965.08-SLO CONSTRUCTION$14,300,0002004

JEFFERSON05- 972.00KY-42SP RIGHT OF WAY$250,0002002

JEFFERSON05- 972.00KY-42SPUTILITIES$300,0002002

JEFFERSON05- 982.00-SLO RIGHT OF WAY$150,0002003

JEFFERSON05- 982.00-SLOUTILITIES$100,0002004

JEFFERSON05- 982.00-SLO CONSTRUCTION$400,0002004

JEFFERSON05- 1006.00CR-9999BRZ CONSTRUCTION$275,0002002

JEFFERSON05- 1012.05-CM CONSTRUCTION$5,000,0002001

JEFFERSON05- 1012.06-CM CONSTRUCTION$1,500,0002002

JEFFERSON05- 1012.07-CM CONSTRUCTION$5,000,0002003

JEFFERSON05- 1012.08-CM CONSTRUCTION$3,400,0002004

JEFFERSON05- 1018.00CR-9999BRZ RIGHT OF WAY$100,0002001

JEFFERSON05- 1018.00CR-9999BRZUTILITIES$75,0002001

JEFFERSON05- 2000.00I-264IMDESIGN$300,0002001

JEFFERSON05- 2000.00I-264IM CONSTRUCTION$10,000,0002002

JEFFERSON05- 2000.01I-264IM CONSTRUCTION$10,000,0002003

JEFFERSON05- 2001.00I-264IM CONSTRUCTION$8,700,0002001

JEFFERSON05- 2002.00I-265IMDESIGN$20,0002002

JEFFERSON05- 2002.00I-265IM CONSTRUCTION$6,200,0002004

JEFFERSON05- 2004.00I-265IM CONSTRUCTION$2,000,0002001

JEFFERSON05- 2007.00I-64IM CONSTRUCTION$5,000,0002001

JEFFERSON05- 2024.00KY-841SP CONSTRUCTION$1,820,0002001

JEFFERSON05- 2026.00US-31WSP CONSTRUCTION$350,0002001

JEFFERSON05- 2027.00KY-1020SP CONSTRUCTION$500,0002001

JESSAMINE07- 87.02-STP RIGHT OF WAY$2,500,0002001

JESSAMINE07- 87.02-STPUTILITIES$1,000,0002002

JESSAMINE07- 318.01US-68STP RIGHT OF WAY$2,500,0002003

JESSAMINE07- 318.01US-68STPUTILITIES$1,000,0002004

JESSAMINE07- 1078.00KY-29BRX CONSTRUCTION$850,0002001

JESSAMINE07- 5006.00US-68SPDESIGN$60,0002003

JOHNSON12- 294.00KY-40SP CONSTRUCTION$3,600,0002001

JOHNSON12- 1036.00KY-40BRO CONSTRUCTION$2,500,0002002

JOHNSON12- 5002.00KY-1100SP CONSTRUCTION$350,0002002

JOHNSON12- 5008.00KY-321SPDESIGN$220,0002002

JOHNSON12- 5008.00KY-321SP RIGHT OF WAY$60,0002003

KENTON06- 71.03KY-1303SNK RIGHT OF WAY$4,000,0002002

KENTON06- 71.03KY-1303SNKUTILITIES$1,000,0002004

KENTON06- 273.00KY-1120SNK CONSTRUCTION$4,500,0002001

KENTON06- 286.01-SP RIGHT OF WAY$250,0002001

KENTON06- 286.01-SPUTILITIES$200,0002002

KENTON06- 286.01-SP CONSTRUCTION$9,000,0002004

KENTON06- 300.00-STPDESIGN$2,100,0002001

KENTON06- 300.00-STP CONSTRUCTION$14,000,0002002

KENTON06- 313.10KY-17SPUTILITIES$1,000,0002001

KENTON06- 313.10KY-17SP CONSTRUCTION$10,000,0002002

KENTON06- 344.00KY-16SP RIGHT OF WAY$7,900,0002001

KENTON06- 344.00KY-16SNKUTILITIES$8,300,0002001

KENTON06- 1030.00KY-8BROUTILITIES$1,300,0002001

KENTON06- 1030.00KY-8BRO CONSTRUCTION$2,800,0002002

KENTON06- 2003.00I-275IM CONSTRUCTION$1,000,0002002

KENTON06- 5002.00KY-1072SP RIGHT OF WAY$20,0002001

KENTON06- 5002.00KY-1072SP CONSTRUCTION$450,0002002

KENTON06- 5007.00I-275SPDESIGN$150,0002002

KENTON06- 5007.00I-275SP CONSTRUCTION$1,500,0002004

KENTON06- 5008.00I-275SPDESIGN$175,0002002

KNOTT12- 2000.00KY-80SPDESIGN$25,0002004

KNOTT12- 5000.00KY-80SP CONSTRUCTION$417,0002001

KNOTT12- 5001.00KY-550SP RIGHT OF WAY$5,0002001

KNOTT12- 5001.00KY-550SP CONSTRUCTION$173,9002002

KNOTT12- 5006.00KY-80SPDESIGN$210,0002002

KNOTT12- 5006.00KY-80SP RIGHT OF WAY$30,0002003

KNOTT12- 5006.00KY-80SP CONSTRUCTION$1,750,0002004

KNOX11- 112.00-SPDESIGN$400,0002003

KNOX11- 218.00KY-11SP RIGHT OF WAY$150,0002001

KNOX11- 218.00KY-11SPUTILITIES$50,0002001

KNOX11- 218.00KY-11SP CONSTRUCTION$405,0002002

LARUE04- 121.01KY-210STP CONSTRUCTION$8,000,0002001

LARUE04- 121.02KY-210STP CONSTRUCTION$12,000,0002002

LARUE04- 1047.00KY-470BRX CONSTRUCTION$350,0002002

LARUE04- 5006.00KY-84SPDESIGN$60,0002004

LAUREL11- 8.00I-75NH CONSTRUCTION$14,000,0002003

LAUREL11- 9.01I-75NH CONSTRUCTION$10,000,0002003

LAUREL11- 9.02I-75NH CONSTRUCTION$5,000,0002004

LAUREL11- 15.00I-75STP CONSTRUCTION$16,000,0002003

LAUREL11- 15.01I-75SP CONSTRUCTION$7,500,0002003

LAUREL11- 15.02I-75SP CONSTRUCTION$13,500,0002004

LAUREL11- 278.10KY-30SP CONSTRUCTION$10,000,0002001

LAUREL11- 278.12KY-30SP CONSTRUCTION$7,000,0002003

LAUREL11- 278.20KY-30SPDESIGN$2,500,0002001

LAUREL11- 278.20KY-30SP RIGHT OF WAY$4,000,0002003

LAUREL11- 1047.00KY-1305BRX CONSTRUCTION$200,0002002

LAUREL11- 2004.00DB-9006SP CONSTRUCTION$7,500,0002002

LAUREL11- 2004.01DB-9006SP CONSTRUCTION$8,700,0002004

LAUREL11- 2007.00US-25ESPDESIGN$50,0002003

LAWRENCE12- 3.00US-23NH RIGHT OF WAY$1,700,0002001

LAWRENCE12- 3.00US-23NHUTILITIES$750,0002003

LAWRENCE12- 3.00US-23NH CONSTRUCTION$8,500,0002004

LAWRENCE12- 284.00KY-32STPDESIGN$600,0002004

LAWRENCE12- 1033.00KY-707BRZ CONSTRUCTION$250,0002002

LAWRENCE12- 1034.00KY-707BRZ CONSTRUCTION$250,0002002

LAWRENCE12- 1063.00CR-1124BRZ CONSTRUCTION$500,0002001

LEE10- 292.00KY-11SPDESIGN$1,200,0002002

LEE10- 1056.00CR-1147BRZDESIGN$75,0002002

LEE10- 1056.00CR-1147BRZ RIGHT OF WAY$50,0002004

LEE10- 1056.00CR-1147BRZUTILITIES$50,0002004

LESLIE11- 12.00US-421STPDESIGN$500,0002002

LESLIE11- 119.00DB-9006SPDESIGN$400,0002003

LETCHER12- 121.00KY-15SPDESIGN$150,0002003

LETCHER12- 311.10US-119APD CONSTRUCTION$10,000,0002001

LETCHER12- 311.11US-119APD CONSTRUCTION$15,000,0002003

LETCHER12- 311.12US-119APD CONSTRUCTION$21,000,0002004

LETCHER12- 314.00US-119APDDESIGN$3,500,0002001

LETCHER12- 314.00US-119APD RIGHT OF WAY$4,152,0002003

LETCHER12- 314.00US-119APDUTILITIES$1,725,0002004

LETCHER12- 1059.00CR-1371BRZ CONSTRUCTION$550,0002002

LETCHER12- 1061.00KY-113BRX CONSTRUCTION$600,0002002

LETCHER12- 5003.00KY-588SP CONSTRUCTION$400,0002002

LINCOLN08- 161.00US-150STPUTILITIES$200,0002001

LINCOLN08- 161.00US-150STP CONSTRUCTION$4,500,0002002

LINCOLN08- 163.00US-150SPDESIGN$1,500,0002001

LINCOLN08- 163.00US-150STP RIGHT OF WAY$3,000,0002003

LINCOLN08- 5006.00US-27SPDESIGN$60,0002003

LINCOLN08- 5006.00US-27SP RIGHT OF WAY$50,0002004

LINCOLN08- 5006.00US-27SPUTILITIES$60,0002004

LIVINGSTON01- 184.00US-60SPDESIGN$750,0002002

LIVINGSTON01- 184.00US-60STP RIGHT OF WAY$1,250,0002004

LIVINGSTON01- 330.00US-60SPDESIGN$850,0002003

LIVINGSTON01- 1123.00KY-952BRX CONSTRUCTION$750,0002001

LIVINGSTON01- 2003.00I-24IM CONSTRUCTION$800,0002002

LIVINGSTON01- 5001.00US-60SP RIGHT OF WAY$10,0002001

LIVINGSTON01- 5001.00US-60SP CONSTRUCTION$350,0002001

LOGAN03- 148.00-SP RIGHT OF WAY$1,500,0002002

LOGAN03- 148.00-SPUTILITIES$500,0002004

LYON01- 307.01US-62SP RIGHT OF WAY$4,000,0002002

LYON01- 307.01US-62SPUTILITIES$4,000,0002004

LYON01- 5002.00KY-295SP RIGHT OF WAY$20,0002001

LYON01- 5002.00KY-295SPUTILITIES$15,0002001

LYON01- 5002.00KY-295SP CONSTRUCTION$450,0002002

MADISON07- 28.10CR-1206SP RIGHT OF WAY$350,0002001

MADISON07- 28.10CR-1206SPUTILITIES$2,400,0002001

MADISON07- 28.10CR-1206SP CONSTRUCTION$3,000,0002002

MADISON07- 214.00KY-169SP RIGHT OF WAY$1,500,0002001

MADISON07- 214.00KY-169SPUTILITIES$1,500,0002003

MADISON07- 214.00KY-169SP CONSTRUCTION$6,500,0002004

MADISON07- 309.00KY-52STPUTILITIES$1,710,0002001

MADISON07- 309.00KY-52STP CONSTRUCTION$9,250,0002002

MADISON07- 5003.00KY-52SPDESIGN$150,0002001

MADISON07- 5003.00KY-52SP CONSTRUCTION$1,250,0002002

MAGOFFIN10- 121.00US-460SPDESIGN$1,000,0002003

MAGOFFIN10- 280.00US-460STP CONSTRUCTION$4,500,0002001

MAGOFFIN12- 1.10KY-114NH RIGHT OF WAY$2,000,0002001

MAGOFFIN12- 1.10KY-114NHUTILITIES$1,500,0002003

MAGOFFIN12- 1.10KY-114NH CONSTRUCTION$15,000,0002004

MARION04- 192.00US-68SPDESIGN$1,200,0002001

MARION04- 192.00US-68SP RIGHT OF WAY$2,000,0002003

MARION04- 309.00KY-49STP RIGHT OF WAY$300,0002001

MARION04- 309.00KY-49STPutilities$200,0002001

MARSHALL01- 180.70US-68BROUTILITIES$150,0002001

MARSHALL01- 180.70US-68BRO CONSTRUCTION$7,000,0002004

MARSHALL01- 1117.00KY-58BRO RIGHT OF WAY$250,0002001

MARSHALL01- 1117.00KY-58BROUTILITIES$1,275,0002001

MARSHALL01- 1117.00KY-58BRO CONSTRUCTION$2,000,0002003

MARSHALL01- 1121.00US-68BRO CONSTRUCTION$2,500,0002002

MARSHALL01- 1130.00KY-1824BRX RIGHT OF WAY$75,0002001

MARSHALL01- 1130.00KY-1824BRXUTILITIES$295,0002001

MARSHALL01- 1130.00KY-1824BRX CONSTRUCTION$500,0002003

MARSHALL01- 5000.00KY-80SP CONSTRUCTION$150,0002001

MARSHALL01- 5003.00PU-9003SPDESIGN$60,0002001

MARSHALL01- 5003.00PU-9003SP RIGHT OF WAY$10,0002002

MARSHALL01- 5003.00PU-9003SP CONSTRUCTION$450,0002004

MARTIN12- 154.01KY-40SP CONSTRUCTION$4,000,0002001

MARTIN12- 154.02KY-40STP CONSTRUCTION$11,000,0002001

MARTIN12- 154.03KY-40STP CONSTRUCTION$25,000,0002002

MARTIN12- 154.04KY-40STP CONSTRUCTION$15,000,0002003

MARTIN12- 154.10KY-40STP RIGHT OF WAY$3,000,0002001

MARTIN12- 154.10KY-40STPUTILITIES$3,000,0002003

MARTIN12- 285.00KY-40SPDESIGN$250,0002004

MARTIN12- 1052.00CR-9999BRZ CONSTRUCTION$450,0002002

MASON09- 108.00US-62STP CONSTRUCTION$6,000,0002002

MASON09- 124.01US-68NH RIGHT OF WAY$4,000,0002001

MASON09- 124.01US-68NHUTILITIES$3,500,0002001

MASON09- 124.01US-68NH CONSTRUCTION$17,000,0002002

MASON09- 145.00-SP CONSTRUCTION$1,150,0002001

MCCRACKEN01- 115.10US-60SPDESIGN$400,0002001

MCCRACKEN01- 115.10US-60SP RIGHT OF WAY$1,250,0002003

MCCRACKEN01- 186.00US-45STP CONSTRUCTION$2,500,0002004

MCCRACKEN01- 260.00US-62STPUTILITIES$3,400,0002001

MCCRACKEN01- 260.00US-62STP CONSTRUCTION$3,000,0002002

MCCRACKEN01- 310.01-SP RIGHT OF WAY$3,000,0002002

MCCRACKEN01- 310.01-SPUTILITIES$2,000,0002004

MCCRACKEN01- 1115.00US-60BRO RIGHT OF WAY$5,000,0002001

MCCRACKEN01- 1115.00US-60BROUTILITIES$3,000,0002003

MCCRACKEN01- 1124.00KY-998BRX RIGHT OF WAY$500,0002001

MCCRACKEN01- 1124.00KY-998BRXUTILITIES$1,000,0002001

MCCRACKEN01- 1124.00KY-998BRX CONSTRUCTION$2,000,0002002

MCCREARY08- 262.01US-27SP CONSTRUCTION$3,500,0002001

MCCREARY08- 1012.00CR-5236BRZ RIGHT OF WAY$200,0002001

MCCREARY08- 1012.00CR-5236BRZUTILITIES$150,0002001

MCLEAN02- 9.00US-431STP RIGHT OF WAY$600,0002002

MCLEAN02- 9.00US-431STPUTILITIES$400,0002004

MCLEAN02- 1049.00KY-136BRO RIGHT OF WAY$50,0002002

MCLEAN02- 1049.00KY-136BROUTILITIES$50,0002002

MCLEAN02- 1049.00KY-136BRO CONSTRUCTION$250,0002004

MEADE04- 53.00KY-313SPDESIGN$1,800,0002001

MEADE04- 53.01KY-313STP RIGHT OF WAY$6,500,0002003

MEADE04- 2006.00US-31WSPDESIGN$30,0002001

MEADE04- 2006.00US-31WSP CONSTRUCTION$1,200,0002003

MEADE04- 5001.00KY-230SP CONSTRUCTION$325,0002002

MENIFEE10- 117.01US-460STP RIGHT OF WAY$2,000,0002002

MENIFEE10- 117.01US-460STPUTILITIES$1,500,0002004

MENIFEE10- 1054.00KY-713BRX RIGHT OF WAY$600,0002001

MENIFEE10- 1054.00KY-713BRXUTILITIES$75,0002001

MENIFEE10- 1054.00KY-713BRX CONSTRUCTION$360,0002002

MENIFEE10- 5008.00KY-1274SPDESIGN$100,0002004

MERCER07- 1075.00KY-152BRO RIGHT OF WAY$150,0002001

MERCER07- 1075.00KY-152BROUTILITIES$75,0002001

MERCER07- 1089.00KY-1988BRX RIGHT OF WAY$50,0002002

MERCER07- 1089.00KY-1988BRXUTILITIES$30,0002003

MERCER07- 1089.00KY-1988BRX CONSTRUCTION$150,0002004

METCALFE03- 1050.00KY-640BRX CONSTRUCTION$350,0002002

MONROE03- 276.01KY-163SPDESIGN$800,0002001

MONROE03- 276.01KY-163STP RIGHT OF WAY$2,500,0002003

MONROE03- 7020.00-SP RIGHT OF WAY$1,500,0002001

MONROE03- 7020.00-SPutilities$500,0002002

MONTGOMERY 07- 83.00 US-60STP CONSTRUCTION$600,000 2001

MONTGOMERY 07- 124.00US-460SPright of way$500,000 2003

MONTGOMERY 07- 124.00US-460SPutilities$300,000 2003

MONTGOMERY 07- 317.00KY-11SPright of way$2,000,000 2002

MONTGOMERY 07- 317.00KY-11SPUTILITIES$1,500,000 2002

MONTGOMERY 07- 1079.00KY-599BRX CONSTRUCTION$350,000 2002

MONTGOMERY 07- 2000.00I-64IMDESIGN$250,000 2001

MONTGOMERY 07- 2000.00I-64IM CONSTRUCTION$10,000,000 2001

MONTGOMERY 07- 2000.01I-64IM CONSTRUCTION$7,000,000 2002

MORGAN10- 130.00US-460SP RIGHT OF WAY$650,0002002

MORGAN10- 130.00US-460SPUTILITIES$120,0002004

MORGAN10- 291.00KY-7SP CONSTRUCTION$7,000,0002001

MORGAN10- 1037.00US-460BRO CONSTRUCTION$425,0002002

MUHLENBERG 02- 313.00 KY-181SPDESIGN$800,000 2002

MUHLENBERG 02- 1015.00CR-1412BRZ CONSTRUCTION$225,000 2001

MUHLENBERG 02- 2005.00WK-9001SP CONSTRUCTION$4,000,000 2001

MUHLENBERG 02- 2006.00WK-9001SP CONSTRUCTION$3,500,000 2002

MUHLENBERG 02- 5006.00US-431SP RIGHT OF WAY$20,000 2001

MUHLENBERG 02- 5006.00US-431SPUTILITIES$10,000 2001

MUHLENBERG 02- 5006.00US-431SP CONSTRUCTION$120,000 2002

NELSON04- 184.00US-62STP RIGHT OF WAY$1,000,0002002

NELSON04- 184.00US-62STPUTILITIES$400,0002003

NELSON04- 191.00BG-9002NH CONSTRUCTION$590,0002002

NELSON04- 285.00US-31ESP RIGHT OF WAY$750,0002002

NELSON04- 285.00US-31ESPUTILITIES$500,0002002

NELSON04- 287.00US-31ESPUTILITIES$1,950,0002001

NELSON04- 287.00US-31ESP CONSTRUCTION$23,000,0002002

NELSON04- 295.10KY-245SPUTILITIES$200,0002001

NELSON04- 295.10KY-245SP CONSTRUCTION$1,000,0002002

NELSON04- 311.00US-31ESTP CONSTRUCTION$3,000,0002002

NELSON04- 1049.00KY-509BRX CONSTRUCTION$400,0002003

NELSON04- 2004.00BG-9002NHDESIGN$60,0002002

NELSON04- 2004.00BG-9002NH CONSTRUCTION$5,250,0002002

OHIO02- 5003.00WN-9007SP CONSTRUCTION$82,3002002

OLDHAM05- 230.00KY-393STP CONSTRUCTION$4,000,0002001

OLDHAM05- 230.01KY-393STP CONSTRUCTION$6,300,0002002

OLDHAM05- 304.01KY-22STP RIGHT OF WAY$3,300,0002001

OLDHAM05- 304.01KY-22STPUTILITIES$1,600,0002002

OLDHAM05- 367.00-STPUTILITIES$3,000,0002003

OLDHAM05- 5005.00KY-1793SPDESIGN$75,0002002

OWSLEY10- 279.50KY-30SPDESIGN$500,0002001

OWSLEY10- 1034.00KY-30BRO CONSTRUCTION$2,800,0002001

OWSLEY10- 5003.00KY-847SP CONSTRUCTION$265,6002001

OWSLEY10- 5004.00KY-28SPDESIGN$180,0002001

OWSLEY10- 5004.00KY-28SP RIGHT OF WAY$25,0002002

OWSLEY10- 5004.00KY-28SP CONSTRUCTION$1,500,0002003

PENDLETON06- 276.00US-27STP CONSTRUCTION$4,500,0002001

PENDLETON06- 1042.00CR-1117BRZ RIGHT OF WAY$160,0002001

PENDLETON06- 1042.00CR-1117BRZUTILITIES$100,0002001

PENDLETON06- 1042.00CR-1117BRZ CONSTRUCTION$1,000,0002002

PERRY10- 114.00KY-7STP RIGHT OF WAY$1,000,0002001

PERRY10- 114.00KY-7STPUTILITIES$750,0002002

PERRY10- 114.00KY-7STP CONSTRUCTION$13,100,0002003

PERRY10- 114.02KY-7STP CONSTRUCTION$6,000,0002004

PERRY10- 122.00DB-9006SPDESIGN$500,0002003

PERRY10- 269.01KY-15STP CONSTRUCTION$11,500,0002002

PERRY10- 269.02KY-15NH CONSTRUCTION$17,000,0002001

PERRY10- 1021.00-BRZ RIGHT OF WAY$696,0002002

PERRY10- 1021.00-BRZUTILITIES$250,0002002

PERRY10- 5000.00KY-476SP CONSTRUCTION$307,6002001

PERRY10- 5002.00KY-476SP CONSTRUCTION$63,4002001

PERRY10- 5005.00KY-7SP RIGHT OF WAY$50,0002001

PERRY10- 5005.00KY-7SP CONSTRUCTION$1,750,0002003

PERRY10- 5006.00KY-80SPDESIGN$210,0002002

PERRY10- 5006.00KY-80SP RIGHT OF WAY$30,0002003

PERRY10- 5006.00KY-80SP CONSTRUCTION$1,750,0002004

PIKE12- 131.00US-23NHDESIGN$400,0002001

PIKE12- 131.00US-23NH RIGHT OF WAY$1,000,0002003

PIKE12- 131.00US-23NHUTILITIES$1,000,0002004

PIKE12- 131.01US-23NHDESIGN$400,0002002

PIKE12- 263.10US-460SP CONSTRUCTION$13,500,0002002

PIKE12- 263.11US-460SP CONSTRUCTION$10,000,0002003

PIKE12- 263.15US-460SP RIGHT OF WAY$4,000,0002001

PIKE12- 263.15US-460APDUTILITIES$2,000,0002003

PIKE12- 263.22US-460APDDESIGN$1,000,0002001

PIKE12- 263.22US-460APD RIGHT OF WAY$5,000,0002003

PIKE12- 263.24US-460APDDESIGN$1,000,0002003

PIKE12- 264.21US-119NH CONSTRUCTION$11,000,0002002

PIKE12- 264.22US-119NH CONSTRUCTION$4,000,0002003

PIKE12- 281.00KY-194SPDESIGN$200,0002003

PIKE12- 298.00KY-199SP RIGHT OF WAY$2,500,0002002

PIKE12- 298.00KY-199SPUTILITIES$300,0002002

PIKE12- 308.12US-119NH CONSTRUCTION$11,000,0002001

PIKE12- 308.21US-119APD CONSTRUCTION$11,000,0002002

PIKE12- 308.30US-119APD CONSTRUCTION$7,000,0002001

PIKE12- 308.31US-119APD CONSTRUCTION$13,000,0002002

PIKE12- 308.32US-119APD CONSTRUCTION$14,000,0002003

PIKE12- 308.33US-119STP CONSTRUCTION$20,000,0002004

PIKE12- 308.40US-119APD CONSTRUCTION$20,000,0002004

PIKE12- 1037.00KY-1499BRO CONSTRUCTION$700,0002003

PIKE12- 1042.00KY-2061BRX CONSTRUCTION$425,0002002

PIKE12- 1043.00KY-3419BRX CONSTRUCTION$350,0002002

PIKE12- 1050.00CR-1559BRZ CONSTRUCTION$300,0002001

PIKE12- 1051.00CR-5116BRZ RIGHT OF WAY$50,0002001

PIKE12- 1051.00CR-5116BRZUTILITIES$100,0002001

PIKE12- 1057.00KY-292BRO RIGHT OF WAY$200,0002002

PIKE12- 1057.00KY-292BROUTILITIES$300,0002002

PIKE12- 1057.00KY-292BRO CONSTRUCTION$1,400,0002004

PIKE12- 1062.00KY-199BRX CONSTRUCTION$375,0002002

PIKE12- 5005.00US-23SPDESIGN$250,0002001

PIKE12- 5005.00US-23SP RIGHT OF WAY$80,0002002

PIKE12- 5005.00US-23SP CONSTRUCTION$2,500,0002003

PIKE12- 5010.00KY-1426SPDESIGN$300,0002001

POWELL10- 118.01KY-213STPUTILITIES$750,0002001

POWELL10- 118.01KY-213STP CONSTRUCTION$1,720,0002002

POWELL10- 1055.00KY-1639BRX CONSTRUCTION$363,0002002

PULASKI08- 55.10US-27NHUTILITIES$3,000,0002001

PULASKI08- 55.10US-27NH CONSTRUCTION$10,000,0002002

PULASKI08- 55.11US-27NH CONSTRUCTION$10,000,0002003

PULASKI08- 138.03US-27BRO CONSTRUCTION$9,000,0002001

PULASKI08- 259.01-STP RIGHT OF WAY$5,500,0002001

PULASKI08- 259.01-STPUTILITIES$2,500,0002003

PULASKI08- 268.01-SP CONSTRUCTION$2,500,0002001

PULASKI08- 270.00KY-1247SP RIGHT OF WAY$3,750,0002002

PULASKI08- 270.00KY-1247SPUTILITIES$970,0002004

PULASKI08- 1009.01KY-90BRO CONSTRUCTION$5,000,0002001

PULASKI08- 1009.02KY-90BRO CONSTRUCTION$12,000,0002002

PULASKI08- 1009.03KY-90BRO CONSTRUCTION$13,000,0002003

PULASKI08- 5003.00US-27SPDESIGN$70,0002001

PULASKI08- 5003.00US-27SP RIGHT OF WAY$200,0002002

PULASKI08- 5003.00US-27SPUTILITIES$75,0002002

PULASKI08- 5003.00US-27SP CONSTRUCTION$1,600,0002003

PULASKI08- 5004.00CU-9008SPDESIGN$50,0002001

PULASKI08- 5004.00CU-9008SP RIGHT OF WAY$20,0002002

PULASKI08- 5004.00CU-9008SP CONSTRUCTION$2,350,0002004

ROBERTSON06- 121.00KY-165SP RIGHT OF WAY$500,0002001

ROBERTSON06- 121.00KY-165SPUTILITIES$300,0002001

ROBERTSON06- 348.00CR-1302BRZ RIGHT OF WAY$35,0002001

ROBERTSON06- 348.00CR-1302BRZUTILITIES$30,0002001

ROCKCASTLE08- 4.00I-75IM CONSTRUCTION$4,000,0002002

ROCKCASTLE08- 4.01I-75NH CONSTRUCTION$10,000,0002002

ROCKCASTLE08- 163.10US-150STPDESIGN$1,000,0002002

ROCKCASTLE08- 163.10US-150STP RIGHT OF WAY$3,000,0002004

ROWAN09- 142.00KY-32SP CONSTRUCTION$2,500,0002001

ROWAN09- 156.01KY-519STP RIGHT OF WAY$2,000,0002001

ROWAN09- 156.01KY-519STPUTILITIES$1,500,0002002

ROWAN09- 156.01KY-519STP CONSTRUCTION$12,500,0002004

ROWAN09- 300.00I-64STPDESIGN$280,0002001

ROWAN09- 300.00I-64STP CONSTRUCTION$7,000,0002001

ROWAN09- 301.00-STP RIGHT OF WAY$1,000,0002001

ROWAN09- 301.00-STPUTILITIES$1,000,0002001

ROWAN09- 301.00-STP CONSTRUCTION$4,400,0002004

ROWAN09- 1026.00KY-32BRO CONSTRUCTION$500,0002002

ROWAN09- 1040.00CR-1222BRZ CONSTRUCTION$1,000,0002004

ROWAN09- 5007.00I-64SPDESIGN$60,0002004

ROWAN09- 7010.00-SP CONSTRUCTION$1,100,0002001

ROWAN09-7030.00KY-519SP RIGHT OF WAY$100,0002002

ROWAN09-7030.00KY-519SPUTILITIES$100,0002002

ROWAN09-7030.00KY-519SP CONSTRUCTION$3,000,0002004

RUSSELL08- 54.01US-127SPDESIGN$300,0002001

RUSSELL08- 54.01US-127STP RIGHT OF WAY$5,500,0002003

RUSSELL08- 5007.00US-127SPDESIGN$35,0002004

SCOTT06- 72.21I-75NHUTILITIES$500,0002001

SCOTT07- 86.00US-460STPUTILITIES$700,0002001

SCOTT07- 86.00US-460STP CONSTRUCTION$5,000,0002002

SCOTT07- 102.01-STP RIGHT OF WAY$6,000,0002004

SCOTT07- 209.20-SP CONSTRUCTION$3,675,0002001

SCOTT07- 212.00US-460SPDESIGN$300,0002001

SCOTT07- 212.00US-460STP RIGHT OF WAY$750,0002003

SCOTT07- 298.00US-62SPUTILITIES$750,0002001

SCOTT07- 298.00US-62STP CONSTRUCTION$9,000,0002002

SCOTT07- 1042.00CR-1218BRZ CONSTRUCTION$500,0002001

SCOTT07- 1076.00KY-32BROUTILITIES$75,0002001

SCOTT07- 1076.00KY-32BRO CONSTRUCTION$200,0002002

SCOTT07- 5000.00KY-620SP CONSTRUCTION$342,0002001

SHELBY05- 172.00KY-395STP RIGHT OF WAY$4,000,0002002

SHELBY05- 172.00KY-395STPUTILITIES$800,0002003

SHELBY05- 326.01-SP RIGHT OF WAY$5,000,0002002

SHELBY05- 326.01-SPUTILITIES$2,000,0002003

SHELBY05- 326.01-SP CONSTRUCTION$18,000,0002004

SHELBY05- 1021.00US-60BRO RIGHT OF WAY$50,0002002

SHELBY05- 1021.00US-60BROUTILITIES$50,0002002

SHELBY05- 1021.00US-60BRO CONSTRUCTION$200,0002004

SHELBY05- 2006.00I-64IMDESIGN$150,0002002

SHELBY05- 2011.00KY-53SP CONSTRUCTION$4,000,0002001

SHELBY05- 2012.00US-60SP CONSTRUCTION$100,0002001

SIMPSON03- 8.00US-31WSTP RIGHT OF WAY$5,500,0002001

SIMPSON03- 8.00US-31WSTPUTILITIES$2,500,0002001

SIMPSON03- 197.00KY-100SP CONSTRUCTION$1,000,0002001

SIMPSON03- 1052.00KY-73BRO RIGHT OF WAY$75,0002002

SIMPSON03- 1052.00KY-73BROUTILITIES$50,0002002

SIMPSON03- 1052.00KY-73BRO CONSTRUCTION$300,0002004

SPENCER05- 307.00KY-2450SP CONSTRUCTION$2,500,0002001

SPENCER05- 347.00KY-44STPDESIGN$1,000,0002003

SPENCER05- 5001.00KY-44SP CONSTRUCTION$250,0002002

SPENCER05- 5006.00KY-55SPDESIGN$45,0002003

TAYLOR04- 114.00KY-210SPDESIGN$350,0002004

TAYLOR04- 1037.00CR-1210BRZ CONSTRUCTION$200,0002002

TAYLOR04- 1053.00KY-70BRO RIGHT OF WAY$50,0002002

TAYLOR04- 1053.00KY-70BROUTILITIES$50,0002002

TAYLOR04- 1053.00KY-70BRO CONSTRUCTION$500,0002004

TAYLOR04- 5000.00US-68SP CONSTRUCTION$550,0002001

TODD03- 2003.00US-79SP CONSTRUCTION$3,000,0002002

TODD03- 2004.00KY-346SP CONSTRUCTION$1,400,0002001

TRIGG01- 180.51US-68STP RIGHT OF WAY$4,900,0002001

TRIGG01- 180.51US-68STPUTILITIES$7,745,0002002

TRIGG01- 180.51US-68STP CONSTRUCTION$8,000,0002004

TRIGG01- 180.52US-68SP RIGHT OF WAY$50,0002001

TRIGG01- 180.52US-68SPUTILITIES$1,250,0002001

TRIGG01- 180.52US-68SP CONSTRUCTION$14,000,0002003

TRIGG01- 180.53US-68SP RIGHT OF WAY$50,0002001

TRIGG01- 180.53US-68SPUTILITIES$500,0002001

TRIGG01- 180.53US-68SP CONSTRUCTION$10,500,0002003

TRIGG01- 180.60US-68BROUTILITIES$150,0002001

TRIGG01- 180.60US-68BRO CONSTRUCTION$8,000,0002003

TRIGG01- 180.61US-68STP CONSTRUCTION$11,000,0002004

TRIGG01- 1120.00KY-139BRO RIGHT OF WAY$250,0002001

TRIGG01- 1120.00KY-139BROUTILITIES$260,0002001

TRIGG01- 1120.00KY-139BRO CONSTRUCTION$1,780,0002003

TRIGG01- 1131.00KY-272BRX RIGHT OF WAY$300,0002002

TRIGG01- 1131.00KY-272BRXUTILITIES$300,0002002

TRIMBLE05- 5003.00US-42SPDESIGN$65,0002001

TRIMBLE05- 5003.00US-42SP CONSTRUCTION$500,0002002

UNION02- 79.20US-60SPDESIGN$1,800,0002004

UNION02- 102.00KY-56STP CONSTRUCTION$2,500,0002002

UNION02- 122.01US-60STP RIGHT OF WAY$1,500,0002001

UNION02- 122.01US-60STPUTILITIES$1,000,0002002

UNION02- 122.01US-60STP CONSTRUCTION$15,000,0002003

UNION02- 123.01US-60STP RIGHT OF WAY$1,000,0002001

UNION02- 123.01US-60STPUTILITIES$750,0002003

UNION02- 123.01US-60STP CONSTRUCTION$10,500,0002004

UNION02- 294.01US-60STP CONSTRUCTION$4,750,0002001

UNION02- 1048.00KY-948BRX CONSTRUCTION$130,0002002

UNION02- 2023.00KY-109SP CONSTRUCTION$1,210,0002001

WARREN03- 5.00I-65IM CONSTRUCTION$12,000,0002004

WARREN03- 6.00I-65NH CONSTRUCTION$5,000,0002004

WARREN03- 6.01I-65IM CONSTRUCTION$4,000,0002004

WARREN03- 11.00I-65STP CONSTRUCTION$15,000,0002004

WARREN03- 11.01I-65SP CONSTRUCTION$14,000,0002004

WARREN03- 53.00-NH CONSTRUCTION$7,000,0002002

WARREN03- 53.01-NH CONSTRUCTION$10,000,0002003

WARREN03- 146.31US-231STP CONSTRUCTION$5,000,0002001

WARREN03- 252.10KY-234STP CONSTRUCTION$6,000,0002001

WARREN03- 290.01KY-880SP RIGHT OF WAY$4,500,0002001

WARREN03- 290.01KY-880SPUTILITIES$2,500,0002003

WARREN03- 310.00-SPUTILITIES$750,0002002

WARREN03- 310.00-SP CONSTRUCTION$3,200,0002004

WARREN03- 312.00US-31WSTP RIGHT OF WAY$2,500,0002001

WARREN03- 312.00US-31WSTPUTILITIES$2,000,0002003

WARREN03- 316.00KY-2158SP RIGHT OF WAY$2,000,0002001

WARREN03- 316.00KY-2158SPUTILITIES$2,500,0002003

WARREN03- 317.00US-31WSTPDESIGN$500,0002003

WASHINGTON 04- 103.05 US-150STP CONSTRUCTION$4,200,000 2001

WASHINGTON 04- 284.01 KY-555STPUTILITIES$1,000,000 2001

WASHINGTON 04- 284.01 KY-555STP CONSTRUCTION$19,600,000 2003

WASHINGTON 04- 307.00 US-150STPDESIGN$500,000 2001

WASHINGTON 04- 307.00 US-150STP RIGHT OF WAY$2,000,000 2003

WEBSTER02- 128.00US-41ASPDESIGN$250,0002003

WEBSTER02- 5007.00PE-9004SP CONSTRUCTION$650,0002001

WHITLEY11- 14.00I-75NHDESIGN$3,000,0002001

WHITLEY11- 14.01I-75IMDESIGN$3,000,0002001

WHITLEY11- 120.00US-25WSPUTILITIES$450,0002001

WHITLEY11- 120.00US-25WSP CONSTRUCTION$4,000,0002002

WHITLEY08- 261.10KY-92SP RIGHT OF WAY$3,000,0002001

WHITLEY08- 261.10KY-92SPUTILITIES$2,000,0002003

WHITLEY11- 1042.00KY-628BRXUTILITIES$25,0002001

WHITLEY11- 1042.00KY-628BRX CONSTRUCTION$300,0002002

WHITLEY11- 1048.00KY-779BRX RIGHT OF WAY$40,0002002

WHITLEY11- 1048.00KY-779BRXUTILITIES$60,0002002

WHITLEY11- 5001.00US-25WSP CONSTRUCTION$125,0002002

WHITLEY11- 5002.00US-25WSP RIGHT OF WAY$30,0002001

WHITLEY11- 5002.00US-25WSPUTILITIES$20,0002001

WHITLEY11- 5002.00US-25WSP CONSTRUCTION$1,500,0002002

WHITLEY11- 5007.00US-25WSPDESIGN$50,0002004

WOLFE10- 11.00KY-15SPDESIGN$2,000,0002003

WOLFE10- 126.10KY-9009SPDESIGN$600,0002001

WOLFE10- 126.10KY-9009NH RIGHT OF WAY$2,000,0002003

WOLFE10- 126.20KY-9009SPDESIGN$600,0002003

WOODFORD07- 347.00-SP CONSTRUCTION$7,948,0002001

WOODFORD07- 5005.00KY-1964SPDESIGN$80,0002002

WOODFORD07- 5005.00KY-1964SP CONSTRUCTION$750,0002003

ZVARIOUS99- 24.00I-64IM CONSTRUCTION$3,500,0002002

ZVARIOUS99- 41.00I-24IM CONSTRUCTION$2,500,0002002

ZVARIOUS99- 42.00-IM CONSTRUCTION$3,500,0002003

ZVARIOUS99- 86.05-SP CONSTRUCTION$35,000,0002001

ZVARIOUS99- 86.06-SP CONSTRUCTION$35,000,0002002

ZVARIOUS99- 86.07-SP CONSTRUCTION$35,000,0002003

ZVARIOUS99- 86.08-SP CONSTRUCTION$35,000,0002004

ZVARIOUS99- 121.00-NH CONSTRUCTION$1,000,0002002

ZVARIOUS99- 124.00-BRZ CONSTRUCTION$875,0002001

ZVARIOUS99- 195.03-TE CONSTRUCTION$12,700,0002001

ZVARIOUS99- 195.04-TE CONSTRUCTION$12,700,0002002

ZVARIOUS99- 195.05-TE CONSTRUCTION$12,700,0002003

ZVARIOUS99- 195.06-TE CONSTRUCTION$12,700,0002004

ZVARIOUS99- 206.10-SAF CONSTRUCTION$5,000,0002001

ZVARIOUS99- 206.20-SAF CONSTRUCTION$5,000,0002002

ZVARIOUS99- 207.00-NH CONSTRUCTION$2,000,0002003

ZVARIOUS99- 208.00-NH CONSTRUCTION$1,000,0002004

ZVARIOUS99- 209.00-SP CONSTRUCTION$5,000,0002003

ZVARIOUS99- 212.05I-75SP CONSTRUCTION$200,0002001

ZVARIOUS99- 212.06I-75SP CONSTRUCTION$200,0002002

ZVARIOUS99- 212.07I-75SP CONSTRUCTION$200,0002003

ZVARIOUS99- 212.08I-75SP CONSTRUCTION$200,0002004

ZVARIOUS99- 219.01-CM CONSTRUCTION$4,200,0002001

ZVARIOUS99- 219.02-CM CONSTRUCTION$6,200,0002002

ZVARIOUS99- 219.03-CM CONSTRUCTION$4,300,0002003

ZVARIOUS99- 219.04-CM CONSTRUCTION$4,400,0002004

ZVARIOUS99- 228.00-BRZ CONSTRUCTION$875,0002002

ZVARIOUS99- 233.00-BRO CONSTRUCTION$550,0002001

ZVARIOUS99- 234.00-BRO CONSTRUCTION$775,0002002

ZVARIOUS99- 235.40-SP CONSTRUCTION$300,0002001

ZVARIOUS99- 235.50-SP CONSTRUCTION$300,0002002

ZVARIOUS99- 235.60-SP CONSTRUCTION$300,0002003

ZVARIOUS99- 235.70-SP CONSTRUCTION$300,0002004

ZVARIOUS99- 242.00-STP CONSTRUCTION$2,000,0002001

ZVARIOUS99- 243.00-STP CONSTRUCTION$750,0002002

ZVARIOUS99- 243.01-STP CONSTRUCTION$2,000,0002003

ZVARIOUS99- 243.02-STP CONSTRUCTION$500,0002004

ZVARIOUS99- 246.00-NH CONSTRUCTION$1,500,0002001

ZVARIOUS99- 252.00-SP CONSTRUCTION$1,500,0002001

ZVARIOUS99- 253.00-SP CONSTRUCTION$1,500,0002002

ZVARIOUS99- 253.01-SP CONSTRUCTION$1,500,0002003

ZVARIOUS99- 253.02-SP CONSTRUCTION$1,500,0002004

ZVARIOUS99- 258.00-SP CONSTRUCTION$500,0002001

ZVARIOUS99- 259.01-SP CONSTRUCTION$500,0002003

ZVARIOUS99- 268.00-BRO CONSTRUCTION$1,500,0002001

ZVARIOUS99- 269.00-BRO CONSTRUCTION$1,500,0002002

ZVARIOUS99- 275.00-SAF CONSTRUCTION$2,000,0002001

ZVARIOUS99- 276.00-SAF CONSTRUCTION$2,000,0002002

ZVARIOUS99- 277.00-SP CONSTRUCTION$5,000,0002001

ZVARIOUS99- 278.00-SP CONSTRUCTION$9,000,0002002

ZVARIOUS99- 278.10-SP CONSTRUCTION$5,000,0002004

ZVARIOUS99- 282.00-SPDESIGN$500,0002001

ZVARIOUS99- 283.00-SPDESIGN$500,0002002

ZVARIOUS99- 287.00-SPDESIGN$300,0002001

ZVARIOUS99- 288.00-SPDESIGN$300,0002002

ZVARIOUS99- 290.00-STP CONSTRUCTION$300,0002001

ZVARIOUS99- 300.00-IM CONSTRUCTION$4,000,0002001

ZVARIOUS99- 301.00-IM CONSTRUCTION$18,000,0002002

ZVARIOUS99- 302.01-STPDESIGN$100,0002001

ZVARIOUS99- 302.01-STP CONSTRUCTION$1,000,0002002

ZVARIOUS99- 302.02-STPDESIGN$50,0002003

ZVARIOUS99- 302.02-STP CONSTRUCTION$500,0002003

ZVARIOUS99- 319.00-SP CONSTRUCTION$2,000,0002001

ZVARIOUS99- 320.00-SP CONSTRUCTION$2,000,0002002

ZVARIOUS99- 324.00-BRO CONSTRUCTION$550,0002003

ZVARIOUS99- 325.00-BRO CONSTRUCTION$500,0002004

ZVARIOUS99- 326.00-BRO CONSTRUCTION$1,500,0002003

ZVARIOUS99- 327.00-BRO CONSTRUCTION$1,500,0002004

ZVARIOUS99- 330.00-FH CONSTRUCTION$300,0002001

ZVARIOUS99- 331.00-FH CONSTRUCTION$300,0002002

ZVARIOUS99- 332.00-FH CONSTRUCTION$300,0002003

ZVARIOUS99- 333.00-FH CONSTRUCTION$300,0002004

ZVARIOUS99- 334.00-SP CONSTRUCTION$2,000,0002003

ZVARIOUS99- 335.00-SP CONSTRUCTION$2,000,0002004

ZVARIOUS99- 336.00-IM CONSTRUCTION$9,000,0002003

ZVARIOUS99- 337.00-IM CONSTRUCTION$15,000,0002004

ZVARIOUS99- 338.00-SPDESIGN$500,0002003

ZVARIOUS99- 339.00-SPDESIGN$500,0002004

ZVARIOUS99- 340.00-SPDESIGN$300,0002003

ZVARIOUS99- 341.00-SPDESIGN$300,0002004

ZVARIOUS99- 342.00-BRODESIGN$1,000,0002002

ZVARIOUS99- 343.00-BRODESIGN$1,200,0002003

ZVARIOUS99- 344.00-BRODESIGN$2,000,0002004

ZVARIOUS99- 345.00-BRZ CONSTRUCTION$875,0002003

ZVARIOUS99- 346.00-BRZ CONSTRUCTION$875,0002004

ZVARIOUS99- 347.00-BRZDESIGN$400,0002002

ZVARIOUS99- 348.00-BRZDESIGN$500,0002003

ZVARIOUS99- 349.00-BRZDESIGN$500,0002004

ZVARIOUS99- 350.00-NHDESIGN$2,000,0002003

ZVARIOUS99- 351.00-SAFconstruction$2,000,0002003

ZVARIOUS99- 352.00-SAF CONSTRUCTION$2,000,0002004

ZVARIOUS99- 353.00-SAF CONSTRUCTION$7,000,0002003

ZVARIOUS99- 354.00-SAF CONSTRUCTION$7,000,0002004

ZVARIOUS99- 355.00-SAF CONSTRUCTION$2,000,0002003

ZVARIOUS99- 356.00-SAF CONSTRUCTION$2,000,0002004

ZVARIOUS99- 357.02-SPDESIGN$200,0002001

ZVARIOUS99- 357.03-SPDESIGN$200,0002002

ZVARIOUS99- 357.04-SPDESIGN$200,0002003

ZVARIOUS99- 357.05-SPDESIGN$200,0002004

ZVARIOUS99- 360.00-BRODESIGN$1,500,0002001

ZVARIOUS99- 1051.00-SP CONSTRUCTION$450,0002001

ZVARIOUS99- 1052.00-SP CONSTRUCTION$450,0002002

ZVARIOUS99- 1060.00-BRX CONSTRUCTION$250,0002001

ZVARIOUS99- 1061.00-BRX CONSTRUCTION$250,0002002

ZVARIOUS99- 1062.00-BRX CONSTRUCTION$250,0002003

ZVARIOUS99- 1063.00-BRX CONSTRUCTION$250,0002004

ZVARIOUS99- 1064.00-SP CONSTRUCTION$450,0002003

ZVARIOUS99- 1065.00-SP CONSTRUCTION$450,0002004

ZVARIOUS99- 1066.00-BRXDESIGN$500,0002003

ZVARIOUS99- 1067.00-BRXDESIGN$1,000,0002004

ZVARIOUS99- 1068.00-BRX CONSTRUCTION$4,000,0002004

ZVARIOUS99- 1069.00-BRZ CONSTRUCTION$3,700,0002004

ZVARIOUS99- 5002.00-SP CONSTRUCTION$1,000,0002001

ZVARIOUS99- 5003.00-SP CONSTRUCTION$1,000,0002002

ZVARIOUS99- 5004.00-SP CONSTRUCTION$1,000,0002003

ZVARIOUS99- 5006.00-SP CONSTRUCTION$1,000,0002004

Page 1 of 42

BR222400.100-2224