FT/GN/68/01/23.01.16
SRI VENKATESWARA COLLEGE OF ENGINEERING
COURSE DELIVERY PLAN - THEORY Page 1 of 6
Department of Civil Engineerig / LP: Sub CodeCE 6304
Rev. No: 00
Date: 04.07.16
B.E/B.Tech/M.E/M.Tech :B.E (Civil Engineering) Regulation: 2013
PG Specialisation : NA
Sub. Code / Sub. Name : CE 6304 / SURVEYING I
Unit : 1
Unit Syllabus:FUNDAMENTALS AND CHAIN SURVEYING 9
Definition – Classifications – Basic principles –Equipment and accessories for ranging and chaining – Methods of ranging – well conditioned triangles .Errors in linear measurements and their corrections – obstacles – Traversing- plotting applications – enlarging the reducing the figures. Areas enclosed by straight line –irregular figures – digital planimetre.
Objective:To impart knowledge about Basic principles of surveying and Chain surveying
SessionNo * / Topics to be covered / Ref / Teaching Aids
01 / Definition and Basic principles, Classification of surveying / 1-Ch.1,P2-4 / PPT, BB
02 / Equipments for ranging and methods of ranging / 3-Ch.1,P8-9 / PPT, BB
03 / Linear measurements and errors, corrections / 1-Ch.3,P37,43-47 / PPT, BB
04 / Obstacles in measurements / 3-Ch.1,P14-18 / PPT, BB
05 / Chain traversing and plotting, applications / 3-Ch.1,P51- 57 / PPT, BB
06 / Scales – Enlarging reducing the figures / 3-Ch.1,P41-46 / PPT, BB
07 / Tutorial / PPT, BB
08 / Tutorial / PPT, BB
09 / Review / BB
Content beyond syllabus covered (if any):
Question bank of part A & part B and discussion of university questions.
* Session duration: 50 minutes
Sub. Code / Sub. Name: CE 6304 / SURVEYING IUnit : II
Unit Syllabus:COMPASS AND PLANE TABLE SURVEYING 9
Compass Basic principles – types- Bearing – systems and conversions- sources of errors- Local attraction – Magnetic declination –dip-traversing –plotting – Adjustment of closing error and applications – plane table and its accessories – Merits and demerits – Radiation-intersection – Resection – traversing – sources of errors applications..
Objective:To impart knowledge in traversing of a given area field with various survey instruments
SessionNo * / Topics to be covered / Ref / Teaching Aids
10 / Basic Principles of Compass survey and its types / 3-Ch.3,P74 / PPT, BB
11 / Bearing systems and conversions / 3-Ch.3,P75-77 / PPT, BB
12 / Local attraction in the bearing and Magnetic declination / 3-Ch.3,P78 / PPT, BB
13 / Plotting and adjustments of errors / 3-Ch.3,P88-103 / PPT, BB
14 / Plane table survey and its accessories / 1-Ch.10,P296-300 / PPT, BB
15 / Radiation and intersection Methods / 1-Ch.10,P303-304 / PPT, BB
16 / Traversing and Resecton methods / 1-Ch.10,P305, 307-317 / PPT, BB
17 / Review / PPT, BB
18 / Tutorial 2 / BB
Content beyond syllabus covered (if any):
Discussion of part A & part B questions and university questions.
Assignment I
* Session duration: 50 mins
Sub. Code / Sub. Name: CE 6304 / SURVEYING IUnit : III
Unit Syllabus : LEVELLING
Level line – Horizontal line- datum – Bench marks – levels and staffs – temporary and permanent adjustment methods of levelling – fly leveling – Check levelling – procedure in levelling –Booking- Reduction – curvature and refraction – reciprocal levelling –sources of errors in levelling – precise levelling – types of instruments – adjustments –Field procedure.
Objective:To impart the knowledge in various types of levelling
SessionNo * / Topics to be covered / Ref / Teaching Aids
19 / Definition and introduction / 1-Ch.6,P123 / PPT, BB
20 / Level line and horizontal line, spirit level line and sensitiveness / 1-Ch.6,P123-125 / PPT, BB
21 / Temporary and permanent adjustments / 3-Ch.5,P142,183-185 / PPT, BB
22 / Fly leveling – concept and procedure / 3-Ch.5,P144 / PPT, BB
23 / Check leveling – Booking the field datas / 3-Ch.5,P145,159-169 / PPT, BB
24 / Reduction Curvature and refraction / 3-Ch.5,P147-151 / PPT, BB
25 / Reciprocal leveling and errors in levelling / 3-Ch.5,P155 / PPT, BB
26 / Precise leveling and types of instruments / 2-Ch.7,P232 / PPT, BB
27 / Adjustments in leveling and field procedure / 3-Ch.5,P145,170-176 / BB
Content beyond syllabus covered (if any):
Discussion of part A & part B questions and university questions
Sub. Code / Sub. Name: CE 6304 / SURVEYING I
Unit : IV
Unit Syllabus : LEVELLING APPLICATIONS
Longitudinal and Cross section- Plotting- contouring – Methods – Characteristics and uses of Contours. Plotting methods of interpolating contours. Computations of Cross sectional areas and Volumes- Earthwork Calculations – capacity of reservoirs – Mass haul diagrams.
Objective: To impart the knowledge on the Levelling applications
SessionNo * / Topics to be covered / Ref / Teaching Aids
28 / Details about Longitudinal and cross section and plotting / 1-Ch.6,P155-156 / PPT, BB
29 / Methods and characteristics of contours / 1-Ch.7,P191-194 / PPT, BB
30 / Plotting methods of interpolating contours / 1-Ch.7,P195-202 / PPT, BB
31 / Computations of Cross sectional areas and volumes / 1-Ch.11,P334-346 / PPT, BB
32 / Earth work calculations / 3-Ch.8,P240 / PPT, BB
33 / Earth work calculations and problems / 3-Ch.8,P241-42 / PPT, BB
34 / Capacity of reservoirs / 3-Ch.8,P245 / PPT, BB
35 / Mass haul diagrams / 2-Ch.11,P324 / PPT, BB
36 / Applications of levelling / 1-Ch.6,P155 / BB
37 / Review / BB
38 / Review / BB
39 / Tutorial 4 / BB
Content beyond syllabus covered (if any):
Discussion of part A & part B questions and university questions.
Assignment II
Sub Code / Sub Name: CE 6304 / SURVEYING I
Unit : V
Unit Syllabus:THEODOLITE SURVEYING
Theodolite – Types- Description – Horizontal and vertical angles – Temporary and permanent adjustments, heights and distances.Tangential and Stadia Tacheometry.Subtense method – stadia constants – Analictic lens.
Objective: To impart the knowledge on the Theodolite surveying and its applications
SessionNo * / Topics to be covered / Ref / Teaching Aids
40 / Theodolite and its different types / 3-Ch.9,P263-267 / PPT, BB
41 / Measurement of horizontal and vertical angles / 3-Ch.9,P268-275 / PPT, BB
42 / Temporary and permanent adjustments / 3-Ch.9,P265, 314-317 / PPT, BB
43 / Measurement of heights and distances / 3-Ch.11,P401 / PPT, BB
44 / Tangential Tacheometry / 3-Ch.11,P423-425 / PPT, BB
45 / Stadia tacheometry / 3-Ch.11,P409-412 / PPT, BB
46 / Problems in stadia tacheometry / 3-Ch.11,P413-421 / PPT, BB
47 / Determination of Stadia Constants / 3-Ch.11,P404 / PPT, BB
48 / Anallactic lens concepts / 3-Ch.11,P406-408 / PPT, BB
49 / Review / BB
50 / Tutorial 5 / BB
Content beyond syllabus covered (if any):
Discussion of part A & part B questions and university questions.
Assignment III
Sub Code / Sub Name: CE 6304 / SURVEYING I
REFERENCES:
- Chandra AM, Plane surveying, New age publishers, 2002.
- Alak de, Plane surveying, S.Chand Company ltd., 2000.
- NN Basak, Surveying and leveling, Tata McGraw- Hill Publishing Co;Ltd, 2005.
4. James M. Anderson and Edward, “ Surveying, Theory and practice”, 7th Edition, McGraw hill, 2001.
5. Bannister A. Raymond S, Surveying, ELBS, Sixth edition, 1992
6. .Roy S.K, “Fundamentals of surveying, 2nd edition, Prentice hall of India.2004.
7. Arora K.R., “Surveying Vol I & II”, Standard Book house, 10th Edition, 2008.
Prepared by / Approved bySignature
Name /
Mr.R.Gopalakrishnan.
/ Dr.E.RavindranathDesignation /
Assistant Professor
/ Professor & HODDate / 05.07.16 / 05.07.16
Remarks *:
Remarks *:
* If the same lesson plan is followed in the subsequent semester/year it should be mentioned and signed by the Faculty and the HOD