Transport assessment checklist

Section / Topic / Essential / Included (Y/N) and notes
Introduction & Background / Site location / ●
Planning designations / ●
Full description of development proposals / ●
Details of any previous applications
Design Statement
Baseline Conditions – Land Uses / Existing land use with floor areas / ●
Car parking (including utilisation and electric vehicle and disabled parking) / ●
Cycle parking / ●
Delivery and servicing (including water/rail transport) / ●
Motorcycle parking / ●
Baseline Conditions – Local Area / Demographic information
Employment/economic information
Baseline Conditions – Road Network / Traffic flows including operational traffic flows / ●
Accident analysis
Pedestrian flows / ●
Junction capacities / ●
Footway capacities
On street loading provision / ●
Proximity to Congestion Charging Zone (CCZ)
On-street parking controls and usage
Baseline Conditions – Public Transport, Walking and Cycling / Bus Routes, frequencies , accessibility & stops / ●
LU/DLR network – stations, lines & frequencies / ●
LU/DLR passenger levels, train capacity & station capacity
National Rail network – stations, lines & frequencies / ●
National Rail passenger levels, train capacity & station capacity
Pedestrian network – existing routes & facilities (PERS audit/ Pedestrian Comfort assessment) / ●
Cycle network – existing routes & facilities / ●
Trams – existing routes & facilities / ●
Riverboat services – existing routes & facilities / ●
Taxis – existing ranks / ●
Trip Generation / Existing trips – total generated / ●
Existing trips – mode split / ●
Existing trips – trip distribution / ●
Existing trips – temporal breakdown / ●
Future trips – source data & methodology / ●
Future trips – mode, time, purpose & distribution / ●
Future trips – delivery & servicing, trip distribution/timing / ●
Construction / Construction trips generated
Construction routes / ●
Impacts on pedestrian routes/footway / ●
Impacts – Road Network / Traffic levels / ●
Junction analysis (PICADY/ARCADY or other as appropriate)
Construction traffic
Impacts – Parking / Car parking including for electric vehicles / ●
Loading and servicing / ●
Cycle parking / ●
Motorcycle parking / ●
Impacts – Bus Network / New demand by direction / ●
Bus priority
Junction capacity on major bus routes (PICADY/ARCADY)
Impacts – LU/DLR Network / Route capacity (RODS) / ●
Train capacity & station capacity (LUL Station Planning Standard (1-371) & SPSG – not applicable for DLR)
(Pedroute and/or Legion where dynamic modelling is required)
Impacts – National Rail Network / Route capacity (LTDS O&D data/PIXC data/Railplan) / ●
Station capacity & train capacity
Impacts – Walking and Cycling / Footway capacity (Fruin) / ●
Available footway width (Gehl) / ●
Impacts - Trams / New demand by direction / ●
Impacts - Taxis / Capacity of taxi ranks
Impacts – River Services / New demand by direction
Impacts on pier facilities
Impacts – PTAL Accessibility / PTAL / ●
CAPITAL
ATOS
Cumulative Impacts / Local additional development impacts / ●
Mitigation / Road network improvement measures
Bus network improvement measures
LU/DLR network improvement measures
Rail network improvement measures
Cycling/walking facilities including cycle parking
Travel Plan / ●
Delivery and Servicing Plan / ●
Construction Logistics Plan / ●
Planning obligations/278 discussions / ●