NEWBUILDCON
STANDARDNEWBUILDINGCONTRACT
PARTI
1.Placeanddate of Contract (Cl. 3,Cl.44(b),Cl. 47)
2.Builder’s name,fullstyle address andcontactdetails (Definitions)
Name: Address:
Country:Phone/Fax:E-mail:
Company registration No.
Additionalnames,addressesandcontactnumbers:
Name:Address:
Country:Phone/Fax:E-mail:
Company registration No. / 3.Buyer’sname,fullstyleaddressandcontactdetails (Definitions)
Name: Address:
Country:Phone/Fax:E-mail:
Company registration No.
Additionalnames,addressesandcontactnumbers:
Name:Address:
Country:Phone/Fax:E-mail:
Company registration No.
4.Vesseldescription/type(Definitions, Cl.2(b))Statevesseltype:
(i)Dry bulk carrier:
(ii)Tanker:
(iii)Containervessel:
(iv)Other(state type):
A.Maindimensions(Cl. 2(b)):B1. Cargocapacity(Cl. 2(b)(v)andCl.B2. TEUcarryingcapacity(only if
11):applicable)(statenumberofcontainers):
(i)Totalon deck
(i)LOA(m):(i) Cubic capacity:a. 20’/40’/45’’TEU:
(ii)Length between perpendiculars (m):b. No.ofreefers:
(iii) Deadweightcapacity DWT(mts):(ii) Bale capacity:(ii)Totalunderdeck
(iv) Mean draftin saltwater(m):(iii) Grain capacity:a. 20’/40’/45’’TEU:
b. No.ofreefers:
(iii) No.ofTEUhomogenousloaded at14 mts.
C.Mainengine(s): (Cl.2(b)(ii),Cl.2(b)(iv)andCl. 9)
(i)Maker/Type:
(ii)Max.Continuous Rating (MCR)(kilowatts atMCR):
(iii)RPM atMCR:
(iv)Specific FuelOilConsumptionatMCR:
(v)NormalContinuous Rating (NCR):
(vi)RPMatNCR:
(vii)Type offueland specification (including Calorific Value (kcal/kg)):
1
Thisdocumentisacomputer generatedNEWBUILDCONform printedby authorityofBIMCO.Anyinsertionordeletiontotheformmustbeclearlyvisible.Intheevent ofanymodificationmadetothepre-printedtextofthisdocumentwhichisnotclearlyvisible,thetextof theoriginalBIMCOapproveddocumentshallapply.BIMCO assumes noresponsibilityfor anyloss,damageor expenseas aresult ofdiscrepanciesbetweentheoriginalBIMCOapproveddocumentandthiscomputergenerateddocument.
D.Average speed(Cl.2(b)(i)andCl. 8)
(i)Service speed atdesign draft(m):
(ii)Min.numberofknots:
(iii)Engineoutput(kilowatts atMCR):
(iv)Percentage ofengine’s max.continuous power/sea margin:
(v)RPM: / E.Other matters(optional)(state any othertechnicalrequirements forthe particularvesseltype)(Cl.2(b)(vi)andCl. 12)
5.Shipyard(s)(ifdifferentfrom Box2)(Fullstyle address and contactdetails)(Definitions)
Name:Address:
Country:Phone/Fax:E-mail:
Additionalnames,addressesandcontactnumbers:
Name:Address:
Country:Phone/Fax:E-mail: / Name:Address:
Country:Phone/Fax:E-mail:
Additionalnames,addressesandcontactnumbers:
Name:Address:
Country:Phone/Fax:E-mail:
6.Builder’s HullNumber (Definitions,Cl.2(a)) / 7.FlagState(Definitions)
8.ClassificationSociety/Class Notation(Definitions,Cl. 3) / 9.Contract PriceandCurrency(Definitions,Cl. 7)
(a)Price
(b)Currency
10. ContractualDate of Delivery(Definitions,Cl. 14(c)(iii)(1)) / 11. Payment AmountsandTime Due(Definitions,Cl.7,Cl.15,Cl.39(c))1stInstalment(seeCl.15(a)(i))
2nd Instalmentand time due3rd Instalmentand time due4th Instalmentand time due
FinalInstalment(seeCl.15(a)(iv))
12. Builder’s Bank AccountDetalis(Cl.15(d))
Name:Address:
Country:Phone/Fax:E-mail:Sortcode:
Accountnumber:Accountname:
13.SpeedDeficiency(Cl. 8,Cl.39(a)(iv))
(i)ContractPrice reduction amount:
(ii)Maximum amount:(state monetarylimit):
14.ExcessiveFuel Consumption(Cl. 9,Cl.39(a)(v))
(i)ContractPrice reduction amount:
(ii)Maximum amount:(state monetary limit): / 15.DeadweightDeficiency(Cl. 10,Cl.39(a)(vi))
(i)Deadweighttolerance:
(ii)ContractPrice reduction amount:
(iii)Maximum amount:(state monetary limit):
2
Thisdocumentisacomputer generatedNEWBUILDCONform printedby authorityofBIMCO.Anyinsertionordeletiontotheformmustbeclearlyvisible.Intheevent ofanymodificationmadetothepre-printedtextofthisdocumentwhichisnotclearlyvisible,thetextof theoriginalBIMCOapproveddocumentshallapply.BIMCO assumes noresponsibilityfor anyloss,damageor expenseas aresult ofdiscrepanciesbetweentheoriginalBIMCOapproveddocumentandthiscomputergenerateddocument.
16.CubicDeficiency(Cl. 11,Cl.39(a)(vii))(i)Cubic capacity tolerance:
(ii)ContractPrice reduction amount:
(iii)Maximum amount:(state monetary limit): / 17. Other Deficiencies (Optional)(Cl. 12,Cl. 39(a)(viii))
18.Late Delivery Compensation(Cl. 13)
(i)Amountperday:
(ii)Maximum amount:(state monetary limit): / 19.Guarantees(Cl.14(a) and(b))
(a)Buyer’s guarantees
(i)Numberofdays after signing Contract:
(ii)Buyer’s Instalment/Performance Guarantee:
(b)Builder’s guarantees
(i)Numberofdays after signing Contract:
20. Guarantee Period(state numberofmonths.Ifleftblank 12 monthsshallapply) (Cl. 35(a)(i)) / 21. AdditionalGuarantee Period
(state numberofmonths) (Cl.35(e)) / 22.SuspensionandTermination(Cl. 39)
(i)Running period (state numberofdays):
(ii)Notice period (state numberofdays):
23.GoverninglawandDispute Resolution(Cl. 41andCl. 42)
(a)Governing law
(b)Place ofdispute resolution / 24. GuaranteeEngineer(state monthly lump sum) (Cl.36(b))
25. EffectiveDateof Contract(state conditionsto be fulfilled) (Cl.44(a)) / 26. State numberofdays withinwhichconditions have tobe satisfied(Cl.44(b))
27. Optionaladditionalvessels(state number)(Cl.46) / 28. Optionaladditionalvesselscontractpriceanddeliverydates(Cl.46)
29. Declaration ofOptions(state numberofmonths afterEffectivedate) (Cl.46) / 30. Interest (state rate ofinterest) (Cl. 18,Cl. 38(b)(ii)(2)(i),Cl.39(e)and39(f)(iv))
31. Buyer’sGuarantor (state name ofbank orparty as appropriate,fullstyleaddress and contactdetails( (Cl.14(a))
Name:Address:
Country:Phone/Fax:E-mail: / 32. Builder’s Guarantor (state nameofbankorparty as appropriate,fullstyle address andcontactdetails((Cl.14(b),Cl. 27(d)(iv)(3))
Name:Address:
Country:Phone/Fax:E-mail:
33. AdditionalAnnexes / 34. Numbers of Additional Clauses
This Contract consistsof PART I including additionalclauses, if anyagreed and stated inBox 34,and PART IIaswellasanyAnnexesagreedand attachedheretoand shallbeperformed subject to the conditionscontained herein. In the eventof a conflict of conditionsthe provisionsof PART I shallprevailover thoseof PARTII to the extentof such conflict, but no further.
The Specification, Maker’sList, Plans, and/orDrawingshereafterapprovedbythe Buyershallformpartof thisContract, butintheevent of conflict between theprovisionsof thisContract andthe Specification, Maker’sList, Plansand/ordrawings,the provisionsof thisContract shallprevail. In the event of inconsistencybetween the Specification and Maker’sList, on the one handand the Plansand/orDrawingsonthe other,the Specifications/Maker’sList shallprevail. In thecase of inconsistencybetweenanyofthe Plansand/orDrawings, the laterin date shallprevail.
3
Thisdocumentisacomputer generatedNEWBUILDCONform printedby authorityofBIMCO.Anyinsertionordeletiontotheformmustbeclearlyvisible.Intheevent ofanymodificationmadetothepre-printedtextofthisdocumentwhichisnotclearlyvisible,thetextof theoriginalBIMCOapproveddocumentshallapply.BIMCO assumes noresponsibilityfor anyloss,damageor expenseas aresult ofdiscrepanciesbetweentheoriginalBIMCOapproveddocumentandthiscomputergenerateddocument.
LISTOFCLAUSES
DEFINITIONSINTERPRETATION
1.Builder’sandBuyer’sobligations
2.Description
3.Classification,RulesandRegulations
4.IMO HazardousMaterialsInventory
5.Protective Coatings
6.Source of Origin
7.ContractPrice
8.Speed Deficiency
9.ExcessiveFuelConsumption
10.DeadweightDeficiency
11.CubicCapacityDeficiency
12.OtherDeficiencies(optional Clause)
13.Late Deliveryfor non-permissible delays
14.Guarantees
(a)Buyer’sInstalment/Performance Guarantee
(b)Builder’sRefund Guarantee
(c)GuaranteeComplianceandExpiry
15.Payments
(a)Instalments
(b)PaymentforModificationsand otheritems
(c)PaymentofLiquidated Damages
(d)PaymentProcedures
16.Taxes,duties,stamps,duesand fees
17.Righttoset-off
18.Interest
SECTION3–PRODUCTION
19.Sub-contracting
20.Approvals
21.Buyer’sSupplies
(a)Buyer
(b)Builder
22.Buyer’sRepresentative,Assistants,Officersand Crew
23.Inspections,TestsandTrials
24.ModificationsandChanges
25.Builder’sModificationsandSubstitutionofMaterials
26.Changes inRulesand Regulations
27.SeaTrials
(a)Notice
(b)WeatherConditions
(c)Conductof theSeaTrials
(d)MethodofAcceptance or Rejection
SECTION4– DELIVERY
28.Delivery
29.Documentson Delivery
30.Final Instalment
31.Title and Risk
32.Possession andRemoval ofthe Vessel
33.Vessel Registration
34.Permissible Delays
35.Builder’sGuarantee
36.GuaranteeEngineer
37.Responsibilitiesand exclusionsfromliabilities
Builder’sexclusion Clauses
(a)LiabilityforDefectsdiscovered beforeoratthetime ofdelivery.
(b)LiabilityforDefectsdiscovered afterdelivery
(c)Liabilityforthird partyreplacementorrepair
(d)Implied terms
Mutual exclusion Clauses
(e)Liabilityfollowingtermination
ResponsibilityClauses
(f)Responsibilityfor death andpersonalinjury
(g)Responsibilityfordamageto or lossofproperty
38.Insurances
(a)Builder’sInsurances
(b)Allocation ofInsurance Proceeds
39.Suspension andTermination
(a)Buyer’sTermination
(b)Builder’sTermination
(c)Suspension ofWork
(d)Deemed Insolvency
(e)EffectofBuyer’sTermination
(f)EffectofBuilder’sTermination
40.Copyrights,TradeMarks andPatents
41.Governinglaw
42.Dispute Resolution
(a)Classification/RegulatoryAuthorities
(b)Expertdetermination
(c)Arbitration andMediation
SECTION6–SUNDRY
43.Notices
44.Effectivedate ofContract
45.Assignment
(a)Builder’sassignment
(b)Buyer’sassignment
46.Options
47.EntireAgreement
48.Thirdpartyrights
ANNEXES
ANNEX “A”–(GUARANTEES)ANNEX “B”– (SPECIFICATION)ANNEX “C”– (MAKER’S LIST)
DEFINITIONS1
InthisContract:2
“BankingDay”means adayonwhichbanksareopenin theplacesstatedinBox 2 andBox 33
and,where aremittanceisinUSdollars,inNewYork.4
“Builder” meansthecompanyorcompaniesstatedinBox 2,organisedandexistingunder5
the lawsofthecountryorcountriesstatedin Box 2 havingtheirprincipalofficeattheaddress6
statedinBox 2 andincludingtheirpersonnel.If morethanonecompanyisstatedinBox 27
thentheyshallbejointlyandseverallyliable.8
“Buyer” meansthecompanyorcompaniesstatedinBox 3,organisedandexistingunder the9
lawsofthe countryorcountriesstatedinBox 3 havingtheirprincipalofficeat theaddress10
statedinBox 3 andincludingtheirpersonnel.11
“Buyer’sRepresentative”meansthenamedrepresentativeofthe Buyerwhomaybepresent12
at the Shipyardthroughout the constructionoftheVessel.13
“Buyer’sSupplies”meansalloftheitems to be providedbythe Buyerinaccordance withthe14
Specificationat its ownrisk, costandexpense.15
“ClassificationSociety” meanstheclassificationsocietystatedinBox8.16
“Contract Price”meanstheamountstatedinBox9 asmaybeadjustedinaccordance with17
thetermsof thisContract.18
“Contract”meansthisBIMCOStandardNewbuildingContractconsistingofPart I including19
additionalClauses,ifanyagreed,andPartII aswellasany Annexes(including the Specification20
andMaker’sList)andPlansandDrawingsattachedhereto.21
“ContractualDateofDelivery”meansthe contractualdateofdeliverystatedinBox 10.22
“Defects”meansanydeficienciesordefectsinthedesign, construction, materialand/or23
workmanshiponthe partoftheBuilderor itssub-contractors.24
“DeliveryDate” meanstheContractualDateofDeliveryasmaybeadjustedinaccordance25
with theterms of thisContract.26
“FinalInstalment” meansthelastinstalmentpayableatdeliverycalculatedinaccordancewith27
Clause15(Payments).28
“FlagState”meansthe State oftheflagwhich theVesselwill fly whenregistered,asstated29
inBox 7.30
“Instalments”meanstheamounts payableinaccordancewithBox 11.31
“Inwriting” meansanymethodoflegiblecommunication.32
“Maker’sList” meansthelistofsuppliersforequipment, machineryand servicesapprovedby33
the PartiesandstatedinAnnexC.34
“Parties”meansthe BuilderandtheBuyer.35
“Party”meanstheBuilderorthe Buyer, asthe casemay be.36
“PermissibleDelays” meansdelays totheconstructionand/ordelivery oftheVesseland which37
entitle theBuilder to extend theDeliveryDateinaccordance withClause34(Permissible38
Delays).39
“Personnel”meansthe employees,agents, servants,suppliersand independentcontractors40
engagedbyeitherParty inorder to performwork ordutiesunderthisContractforwhichthat41
Partyisresponsible.42
“PlansandDrawings” means theplansanddrawingsattachedheretoorlistedand/ordescribed43
in the Specification.44
“RegulatoryAuthorities”meanstheregulatoryauthoritieswhoserulesandregulationsmust45
becompliedwithin theconstructionanddeliveryofthe Vessel.Suchbodiesshallinclude the46
FlagStatetogetherwiththeotherbodies listedintheSpecification.47
“Shipyard”meansthe placeorplacesstatedinBox 5where the Vesselwillbeassembled48
and/orconstructed.49
“Specification”meansthetechnicaldetailscontainedinAnnexB.50
“Sub-contractor” meansanyperson(notbeing aservantoremployeeoftheBuilder)orcompany51
withwhomtheBuilderhasenteredinto acontract for thedesign,construction, manufacture52
orsupply ofanyitem,equipment,workorservice for theVessel.53
“Vessel” meansthe vesseldescribedinBox 4(includingitsmachinery,equipmentand54
appurtenancesdescribedin theSpecification)withhullnumberasperBox 6,builtinaccordance55
withthisContract.56
INTERPRETATION57
Singular/Plural58
InthisContractthe singularincludes thepluralandviceversaasthe contextadmitsor59
requires.60
Headings61
Theindexandheadingstothe ClausesandAnnexesto thisContractareforconvenienceonly62
andwillnotaffectitsconstructionorinterpretation.63
Jointlyandseverally64
Allcovenants,agreements,undertakings,indemnities, representationsandwarrantiesbymore65
thanonepersonareenteredinto, givenormadebysuchpersonsjointlyandseverally.66
1.Builder’sand Buyer’sobligations67
It ismutuallyagreedbetween the Builderandthe Buyerthat:68
(a)the Buildershalldesign, construct, testand survey,launch,equip,complete,selland69
delivertheVessel tothe Buyerallinaccordancewithgood internationalshipbuildingand70
marineengineeringpractice;and71
(b)the Buyershallpurchase,take deliveryofandpayforthe Vessel.72
2.Description73
(a)TheVesselshallbeconstructedatthe Shipyardandshallhavethe Builder’sHull74
Number statedinBox 6.75
(b)TheVesselshallhavethedimensionsandcharacteristicsasstatedinBox4 andthe76
Specification. These shallbedefined,measuredandcalculatedinaccordancewiththe77
Specificationor,ifomittedfrom theSpecification, inaccordance with thefollowing:78
(i)Speed –TheVessel’saveragespeedon aseatrialundertakeninbothdirections79
overa measureddistanceofone(1)nautical mile,withcleanhull,inweatherwith80
windspeedandseastatenotexceedingBeaufortWind ForceScale3 andDouglas81
Sea StateScale 2respectivelyon a draftasstatedinBox4D(i)shallbeatleast the82
numberof knotsstated inBox 4D(ii).Duringsucha seatrial theengine’soutputin83
kilowattsshallbeasstatedinBox 4D(iii)corresponding tothe percentage ofthe84
engine’smaximumcontinuouspoweroutputstatedinBox 4D(iv)at theapproximate85
revolutionsper minutestatedinBox4D(v).86
(ii)FuelConsumption-Thefuelconsumptionofthemainengineonthetest bedusing87
fuelofthetypeandspecificationstatedinBox4C(vii)shallnotexceed thenumberof88
gramsperkilowatt/hourstatedinBox 4C(iv)when theenginedevelopsthenumber89
ofkilowattswithaneffectivecalorificvalueofthenumberof kilocaloriesper kilogram90
statedinBox 4C(ii)andBox4C(vii)respectively.91
(iii)Deadweight -The Vessel’sdeadweightshallbethenumberof metrictonsstated92
inBox4A(iii)oninternationalsummerfreeboard, corresponding toameandraftin93
saltwater(specificgravity1.025)asstatedinBox4A(iv).Thespecifieddeadweight94
shallincludefuel,provisions,stores,freshwater,crewandpassengersinaddition to95
sparepartsnotlessthantherequirementsoftheClassificationSociety.96
(iv)Propulsion -TheVessel’spropulsionmachinery shallbeofthetypeandwith maximum97
continuouspowerinkilowattsat thenumberofrevolutionsperminuteasstatedin98
Box4C(i),4C(ii)and4C(iii).99
(v)CargoCapacity–The Vessel’scargocapacity shallbe thecapacitiesstatedinBox100
4B1and4B2.101
(vi)Other matters –The Vesselshallmeet thetechnicalrequirementsstatedinBox102
4E.103
3.Classification,Rules andRegulations104
(a)TheVesselshallbedesigned,constructed,surveyed,testedanddeliveredin105
compliancewith the applicablelaws,rules, regulationsandrequirements of the106
ClassificationSociety statedinBox 8,andtheRegulatoryAuthorities:107
(i)inforceas ofthedate of thisContractstatedinBox 1,or108
(ii)ifnotinforceasofthedateof thisContract,whichareratifiedandpromulgatedon109
orbeforethedate ofthisContractand whichwillbecompulsoryfor theVesselonor110
beforethedeliveryoftheVesselinaccordancewithClause28 (Delivery).111
Allsuchlaws,rules,regulationsandrequirements oftheClassificationSocietyand112
the RegulatoryAuthoritiesshallbecompliedwithwithout qualification(see Clause26113
(ChangesinRulesandRegulations)).114
(b)ThefinaldecisionsoftheClassificationSocietyorRegulatoryAuthoritiesshallbe115
bindingonthePartiesastotheVessel’scompliancewiththeir respectiveapplicablelaws,116
rules, regulationsandrequirements.117
(c)Allcosts,feesandchargesincidental toandinrespectof compliancewith the118
applicablelaws,rules,regulationsandrequirementsof the ClassificationSocietyor119
RegulatoryAuthoritiesreferredto aboveshallbefor the Builder’scostand expense.120
4.IMOHazardous MaterialsInventory121
TheBuildershall,inaccordancewith theIMO GuidelinesonShipRecycling,Resolution122
A.962(23),withamendmentsinforceas ofthedateofthisContract:123
(a)Endeavourtotake due accountoftheVessel’sultimatedisposalwhendesigningand124
constructing the Vessel by:125
(i)usingmaterialswhichcanberecycledsafelyandinanenvironmentallysoundmanner;126
and127
(ii)byminimising the useof materialsknown to bepotentiallyhazardous to healthand128
the environment.129
(b)Inconsultationwithequipmentmanufacturersprovide the Buyerwith aGreenPassport130
StatementofComplianceissuedbytheClassificationSocietycontaininginformation131
includingtheVessel’shullnumber andmainparticularsandlistinganyandallmaterials132
known tobepotentiallyhazardousutilisedin theconstructionofthe Vessel,itsequipment133
andsystems.134
Thelistofthematerials known to bepotentiallyhazardousshallcontainthelocationand135
the approximatequantity/volumeofeachidentifiedmaterialonboardtheVessel.136
5.ProtectiveCoatings137
TheVessel’sdouble-sideskinspacesanddedicatedseawaterballast tanksshallbecoated138
inaccordancewith the Specification. Inany eventtheminimum coatingstandardshall139
beinaccordancewiththerequirementsoftheIMOPerformanceStandardforProtective140
Coatingsfordedicatedseawaterballasttanksinalltypesofshipsanddouble-sideskin141
spacesofbulkcarriers (IMOPSPC,ResolutionMSC.215(82)) and,whereapplicable,in142
accordance with theIACSCommonStructuralRules for BulkCarriersandfor OilTankers143
orsubsequentmodificationsorreplacementapplicableinaccordancewithClause3(a)144
(Classification,Rules andRegulations).145
6.SourceofOrigin146
Ifsorequestedbythe Buyer,theBuildershallidentifythecountry oforiginofall themain147
componentslistedin theMaker’sList andSpecification.148
7.ContractPrice149
TheContractPriceshallbe theamount statedinBox 9(a)asmaybeadjustedin150
accordance with thetermsof thisContract.151
TheContractPriceand any otherpaymentsto bemadetothe Builderpursuant tothis152
Contractshallbepaidinthe currencystatedinBox 9(b)andinaccordance withthe153
paymenttermsstatedinBox 11andClause15 (Payments).154
8.SpeedDeficiency155
Ifthespeedofthe VesselasstatedinBox 4D(ii)isnotachievedin themannerstated156
in the SpecificationorClause2(b)(i)thefollowingshallapply:157
(a)ThereshallbenoadjustmentoftheContract Priceexcepttothe extentprovidedin158
Sub-clause8(b).159
(b)Ifthereductioninspeedisgreater than2/10thsof aknot, theContractPriceshallbe160
reducedbytheamountstatedinBox 13(i)foreachwhole1/10thofaknotreductionin161
speedinexcessof2/10thsofaknotasliquidateddamagesuptothemaximumamount162
statedinBox 13(ii).163
(c)Ifthereductioninspeedwouldentitle the Buyer to areductionintheContract164
Pricegreaterthanthemaximumamount statedinBox13(ii),the Buyershallhavethe165
option toterminatethisContractinaccordancewithClause39(a)(iv)(Suspensionand166
Termination).167
9.ExcessiveFuelConsumption168
Ifthefuelconsumptionofthe Vessel’smainengineonthetestbedusingthefuel specified169
inBox 4C(vii)exceedsthefigurestatedinBox 4C(iv)the followingshallapply:170
(a)ThereshallbenoadjustmentoftheContractPriceexceptto theextentprovidedin171
Sub-clause9(b).172
(b)Ifthe excess fuelconsumptionisgreaterthan 2%(twopercent)ofthespecifiedfuel173
consumption theContractPriceshallbereducedbythe amountstatedin Box 14(i)for174
eachwholepercentageinexcessof2% asliquidateddamagesupto a maximumamount175
asstatedinBox14(ii).176
(c)Ifthe excess fuelconsumptionwouldentitlethe Buyerto areductionintheContract177
Pricegreaterthanthemaximumamount statedinBox 14(ii), the Buyershallhavethe178
optionto:179
(i)accept themainengineatareductioninthe ContractPricecorresponding tothe180
maximumamountstatedinBox 14(ii)or181
(ii)reject themainengine andeither182
(1)requirethe Builder torectifythe deficiencyandrepeat thetrialorreplacethemain183
enginewithonethatconformstotherequirements oftheContract. (Thetimetaken184
torectifythe deficiencyandrepeat thetrialor replace themainengineinaccordance185
withthisSub-Clauseshallnotbe aPermissibleDelay)or186
(2)terminatethisContract forthwithinaccordancewithClause39(a)(v)(Suspension187
andTermination).188
10.DeadweightDeficiency189
Iftheactualdeadweight ofthe Vesseldeterminedinaccordancewith theSpecification190
islessthanthe deadweightstatedinBox 4A(iii)thefollowingshallapply:191
(a)ThereshallbenoadjustmentoftheContract Priceexcepttothe extentprovidedin192
Sub-clause10(b)193
(b)Ifthereductionindeadweightisgreater thanthenumberofmetrictonnesstatedin194
Box 15(i)thenforeachwholemetrictonnein excessofthefigurein Box 15(i)belowthe195
deadweightstatedinBox 4A(iii)the ContractPriceshallbereducedbytheamountstated196
inBox 15(ii)asliquidateddamagesuptoamaximumamountasstatedinBox 15(iii).197
(c)Ifthereductionindeadweightwouldentitle the Buyerto areductionintheContract198
Pricegreaterthanthemaximumamount statedinBox 15(iii)the Buyershallhavethe199
option toterminatethisContractinaccordancewithClause39(a)(vi)(Suspensionand200
Termination).201
11.CubicCapacityDeficiency202
Iftheactualcubiccapacity ofthe VesseldeterminedinaccordancewiththeSpecification203
islessthanthecubiccapacityspecifiedinBox 4B1(i)thefollowingshallapply:204
(a)ThereshallbenoadjustmentoftheContract Priceexcepttothe extentprovidedin205
Sub-clause11(b)206
(b)Ifthereductionincubiccapacityisgreater thanthenumberofcubicmetresstatedin207
Box 16(i)thenforeachfullcubicmetreinexcessofthefigureinBox 16(i)belowthe cubic208
capacity statedinBox 4B1(i)the ContractPriceshallbereducedbytheamountstatedin209
Box 16(ii)asliquidateddamagesuptoa maximumamountasstatedin Box 16(iii).210
(c)Ifthereductionincubiccapacity wouldentitle theBuyerto areductionintheContract211
Pricegreaterthanthemaximumamount statedinBox 16(iii)the Buyershallhavethe212
option toterminatethisContractinaccordancewithClause39(a)(vii)(Suspensionand213
Termination).214
12.OtherDeficiencies(optionalClause)215
NOTE:ThisClausehasbeenleft blankintentionally to allow thepartiestoinsert,where216
appropriate,aliquidateddamagesprovisioncoveringdeficiencies in any specialtechnical217
requirementsforaparticularvesseltypeandspecifiedbythe partiesinBox4EandBox218
17.(SeealsoClause39(a)(viii)).219
13.LateDeliveryfornon-permissible delays220
Ifdeliverytakesplacemorethan30 daysaftertheDeliveryDatethenforeachday221
thereafter the ContractPriceshallbereducedbytheamountstatedinBox18perday222
asliquidateddamagesup toamaximumdelay of180days(comprising a30daygrace223
periodplus150days).224
Ifthedelay exceeds180 days the Buyershallhave theoptiontoterminatethisContract225
inaccordance withClause39(a)(iii)(SuspensionandTermination).226
14.Guarantees227
(a)Buyer’sInstalment/PerformanceGuarantee228
Tosecurethe Buyer’sobligationto paytheinstalments oftheContractPricepriorto229
deliverythe Buyershall, within the numberofdaysstatedin Box 19(a)(i)after the signing230
ofthisContract,deliverto theBuilderanirrevocableandunconditionalguaranteeissued231
bythe bankorpartystatedin Box 31substantiallyin theformand substancesetoutin232
AnnexesA(i)(Instalments)orA(ii)(Performance) asstatedinBox 19(a)(ii),failingwhich233
the Buildershallhave theoptiontoterminatethisContractinaccordancewithClause234
39(b)(iv) (Suspensionand Termination).235
(b)Builder’sRefundGuarantee236
TosecuretheBuilder’sobligationtorefundthe Buyer’spre-deliveryinstalmentspursuant237
tothisContractthe Buildershall,within the numberofdaysstatedinBox19(b)(i)after238
the signingof thisContractandbeforethe dateforpaymentofthefirstinstalmentin239
accordance withClause15(a)(i)(Payments–Instalments),provide the Buyerwith a240
RefundGuaranteeissuedbythe bankorpartynamedinBox 32substantiallyin theform241
andsubstancesetoutinANNEXA(iii)(RefundGuarantee),failingwhich the Buyershall242
Have the optiontoterminatethisContractinaccordancewithClause39(a)(ix)(Suspension243
andTermination).244
(c)GuaranteeComplianceandExpiry245
ThePartiesshallensurethatanyguarantee issuedontheirbehalfshall:246
(i)comply with the laws,regulations,constitutionandproceduresoftheguarantorand247
its country ofissue,includingbutnotlimitedto, itsregistration withanynecessary248
authorities;and249
(ii)onexpirybereturnedtotheguarantor;and250
(iii)in the caseofthe RefundGuarantee (sub-Clause14(b)),remaininforceuntileither251
(1)a dateatleast300days after the ContractualDateofDeliverystatedinBox 10or252
30daysafter thefinalresolutionofanydisputeunderClause42 (DisputeResolution),253
whicheveris the later;or254
(2)deliveryoftheVesselto, andacceptance ofthe Vesselby,the Buyer255
whicheveris the sooner.256
15.Payments257
(a)Instalments258
TheContractPriceshallbepaidbythe BuyertotheBuilderbyInstalments,whendue259
andpayableinaccordancewithBox 11andthisClause,thepre-deliveryInstalments260
beingpaidasadvances andnotdepositsasfollows:261
(i)UnlessotherwisestatedinBox 11thefirstInstalmentshallbedueand payableby262
the Buyer five(5)BankingDaysafter the RefundGuaranteehasbeen providedin263
accordance withClause14(b)(Builder’sRefundGuarantee).264
(ii)TheBuildershallgivetheBuyerinvoices foreachInstalmentunder thisContract.265
Withthe exceptionofthefirstandFinalInstalment the BuildershallgivetheBuyer266
aninvoice to coverthe sumduetoitnotlessthan ten(10)BankingDays prior tothe267
duedate ofeachInstalment.268
(iii)AllInstalmentsotherthan thefirst andFinalInstalment shallbepayablewithinfour269
(4)BankingDaysoftheduedatethereof.270
(iv)TheFinalInstalmentshallbedueand payableupondeliveryofthe Vesselin271
accordance withBox 11andClause28 (Delivery).272
(b)Payment forModificationsandotheritems273
(i)Thesumsdueorrefundableas aresultof modificationsandchanges,andchanges274
inRulesandRegulationsunderClause24 (ModificationsandChanges)andClause275
26(ChangesinRulesandRegulations) shallbeadded toordeductedfrom the Final276
Instalment.277
(ii)Allexpensespayableinaccordance withClause27(c)(iii)(ConductoftheSeaTrial)278
andClause22(b)shallbepaidtogetherwith theFinalInstalment.279
(iii)Sumsdueforotheritemsshallbepaidwithin fifteen(15)BankingDaysafterreceipt280
bythe BuyeroftheBuilder’sinvoice.281
(c)PaymentofLiquidatedDamages282
Anyamountsfor liquidateddamagesunderClause8(SpeedDeficiency),Clause9283
(ExcessiveFuelConsumption),Clause10 (DeadweightDeficiency),Clause11 (Cubic284
CapacityDeficiency),Clause12 (OtherDeficiencies)andClause13 (LateDeliveryfor285
non-permissibledelays)shallbecalculatedanddeterminedbeforedeliveryandmaybe286
deductedfrom theFinalInstalment.287
(d)PaymentProcedures288
(i)Ifthedateonwhichanypaymentisdueinaccordancewith the provisionsofthis289
Contractdoesnotfall ona BankingDay,paymentshallbemadeonthe nextBanking290
Day.291
(ii)Paymentofsumsdueinaccordance with the provisionsofthisContractshallbemade,292
in the caseofpaymentsto theBuilder,byelectronictransfer tothe Builder’saccount293
stipulatedinBox 12and,in thecase ofpaymentstothe Buyerbyelectronictransfer294
to such bankasthe BuyerbynoticetotheBuildernominatestoreceivepayments295
on its behalf.296
(iii)Thecostof remittingpaymentsshallbeforthe accountofthe payer.297
(iv)PaymentsbyeitherPartyto theotherunderthisContract,andtheir receipt,shallnot298
bedeemeda waiverofany rightorclaimeitherPartymay haveagainsttheother.299
(v)Inthe eventoflatepaymentof InstalmentsbytheBuyer, the Builder shallhave the right300
to suspend workunder thisContractinaccordancewithClause39(c)(Suspension301
ofWork).302
16.Taxes,duties,stamps, duesandfees303
(a)TheBuildershallbearandpayalltaxes,duties, stamps,duesandfeesimposedin304
the placestatedinBox 2inconnectionwith the executionand/orperformanceofthis305
Contract,excludingany taxes,duties,stamps,duesandfeesimposedintheplacestated306
inBox 2 upon the Buyer’sSupplieswhichshallbeforthe Buyer’scostandexpense.307
(b)The Buyershallbearandpayalltaxes,duties, stamps,duesandfeesimposed308
outside theplacestatedinBox 2 inconnectionwith theexecutionand/orperformance309
ofthisContract,except for taxes,duties, stamps,duesandfeesimposeduponthose310
itemsandservicesprocuredbytheBuilder for constructionofthe Vessel.311
(c)IfeitherParty paysany taxes,duties,stamps,duesandfeesforwhich theotherParty312
isresponsibleunderthisClause,theotherParty shallreimbursethe payingParty within313
fifteen(15)BankingDaysofreceiptofnoticetothateffect,togetherwith evidenceofthe314
amountpaid.315
17.Right to set-off316
The Buyershallnothave theright toretainorset-offanyamountagainstany payment317
due totheBuilderunderthisContractexceptinrelation totheFinalInstalmentas318
specificallyprovidedinthisContract (seeClause15(Payments)andClause30 (Final319
Instalment)).320
18.Interest321
IfeitherPartyfails topayanysumdueinaccordancewith theterms ofthisContract, the322
otherPartyshallhavetheright tochargeinterestfrom the duedate attheratestatedinBox323
30onsuchoutstandingsums(seealsoClause39 (SuspensionandTermination)).324
19.Sub-contracting325
TheBuildershallemploythesub-contractorsassetoutinthe SpecificationorMaker’s326
List.Except for minorwork, theBuildershallnotemployothersub-contractorswithout327
the Buyer’sapproval,whichshallnotbe unreasonablywithheld.328
Notwithstandinganysub-contracting, the Builder shallremainfullyresponsiblefor the329
dueperformanceof such workasifundertakenbytheBuilderat theShipyard.330
20.Approvals331
ThetimesandnumbersspecifiedinthisClauseshallapplyunlessotherwisestatedin332
the Specification.333
(a)Assoonaspossibleandnotlater thansixty(60) runningdaysafter the effectivedate334
ofthe Contract (seeClause44 (Effectivedate of Contract))the Buildershallprovidethe335
Buyerwithproposeddetailedbuildingandtestingschedules.The Buyershallcomment336
on theschedulesassoonaspossibleandatthelatestwithinfourteen(14)runningdays337
after receiptoftheproposals. TheBuildershallthereafterprepareand issueinwriting338
amendedbuildingandtestingschedulesincorporating the Buyer’scommentswithin339
fourteen(14)runningdaysthereafter.340
(b)TheBuildershalldespatch tothe Buyeratotalof three(3) fullsets ofthePlansand341
Drawingsforthe Buyer’sapprovalandshallalsosubmitsuchothertechnicalinformation342
as the Buyermayreasonablyrequire,notlessthanthirty(30)runningdaysbeforeany343
constructionworkscommence.The Buildershallgivenotice tothe Buyeradvisingthe344
dateofdespatch ofthe PlansandDrawingsandtheBuyershallgivenotice totheBuilder345
confirmingreceipt thereof.The Buyershallwithinfourteen(14)runningdaysofreceipt346
send totheBuilderone(1)setofthe PlansandDrawingswith the Buyer’s approvalor347
approvalwithcomments,amendmentsor reservations.348
Inthe event that the Buyerneedsadditionaltimeto considerthe PlansandDrawings349
submittedpursuant tothisClause,itshallrequest thesameinwritingoftheBuilderwhose350
agreementshallnotbeunreasonablywithheld.Inthe event thatthe Buyer’scomments,351
amendmentsorreservationsareunclear,unspecifiedorillegible, the Builder maygive352
noticerequestingclarification. Ifthe Buyer fails torespondtotherequesttoprovide353
clarificationwithin five(5)runningdaysofreceipt ofthe Builder’snotice,theBuilder354
shalldeterminewhether and to whatextentitcanadopt the comments,amendmentsor355
reservations.356
Ifrequestedbythe Buyerinwriting, the Plans andDrawingsshallalsobesentinan357
agreedelectronicformat.358
(c)TheBuildershall take duenote ofthe Buyer’scomments,amendmentsorreservations359
(ifany)onPlansandDrawingssubmittedpursuanttothisClauseand,ifsuchcomments,360
amendmentsorreservationsarenotofsucha natureorextentastoconstitutea361
modificationor changeofthe Specificationwithin themeaningofClause24(Modifications362
andChanges), thentheBuildershallcommenceorcontinueconstruction ofthe Vessel363
inaccordance with thecorrectedoramendedPlansandDrawings.364
(d)IftheBuilderconsidersthecomments,amendmentsor reservationstothePlans365
andDrawingsareofanatureorextentthatconstitutes amodificationor changeunder366
Clause24(ModificationsandChanges), theBuildershallnotifythe Buyer accordingly367
andproceedinaccordancewithClause24(ModificationsandChanges).If the Buyer368
disagreesthemattershallberesolvedinaccordancewithClause24(e).369
(e)Inthe event that the Buyer fails toreturnanyPlansandDrawingstothe Builderwith370
approvalorapprovalwithcomments,amendmentsor reservations,ifany,within the time371
limitstatedabove,suchPlansandDrawingsshallbedeemedtohavebeenapprovedby372
the Buyer.373
(f)The Buyer’sapprovalor deemedapprovalofanyPlansandDrawingsshallnot374
affect the obligations oftheBuildertodesign,constructanddeliver,ortheobligations375
ofthe Buyertotakedeliveryof, andpayfor, the Vesselinaccordancewith theother376
provisionsofthisContract;norshallitdiminishtheBuilder’sresponsibilityinrespectof377
its obligationsunder thisContractnorshallitconstituteanyacceptancebythe Buyerof378
anyresponsibilityfor anydefectintheVessel.379
(g)TheBuildershallgivetheBuyer,assoonaspracticable,copies ofallrelevant380
correspondence relatingtothe Vesseltoandfrom theClassificationSocietyandthe381
RegulatoryAuthorities, togetherwithallplansapprovedbythe ClassificationSociety.382
21.Buyer’sSupplies383
(a) / Buyer / 384(i) / The Buyershall,atitsownrisk,costand expense,supplyanddelivertotheBuilder / 385
allofthe Buyer’sSupplies.Suchitemsshallbedeliveredat a warehouseorother / 386
storagefacilityat theShipyardoras otherwisedirectedbythe Builderin aproper / 387
conditionreadyforinstallationbytheBuilderorSub-contractorinorontheVessel / 388
(hereinafter“Installation”),inaccordancewith thebuildingandtestingschedulesin / 389
Clause20(a)(Approvals)orasmayreasonably berequiredbytheBuilder. / 390
(ii) / ToassistInstallation, the Buyershallprovide theBuilderwith the necessary / 391
documentationincludingspecifications,plans,drawings,instructionbooks,manuals, / 392
testreportsandcertificatesrequiredtocomplywithallapplicablerulesandregulations. / 393
IfsorequestedbytheBuilder,the Buyershall,if reasonablypossibleandatno cost / 394
tothe Builder,arrangefor therepresentativesofthemanufacturersofthe Buyer’s / 395
Supplies to assistthe BuilderinInstallationand/or tocarryout theInstallationofthe / 396
Buyer’sSuppliesbythemselvesor tomakenecessaryadjustmentsat theShipyard / 397
inaccordance with themanufacturer’sinstructions,includingcommissioning. / 398
(iii) / TheBuildermayrejectany andallofthe Buyer’s Supplieswhenandif foundon / 399
reasonablegroundsto beunsuitableorinimproperconditionfor Installationornotin / 400
compliancewith the ClassificationSocietyorRegulatoryAuthorities’requirements. / 401
(iv) / Ifdelayindeliveryofany ofthe Buyer’sSuppliesinaccordancewithSub-Clause(a) / 402
(i)exceeds thirty(30)daysandwillcauseactualdelayto thedeliveryoftheVessel, / 403
the Buildershallhave theright toproceedwiththeconstructionoftheVesselwithout / 404
Installationofthe delayeditems.The Buyershallacceptandtake delivery ofthe / 405
Vesselsoconstructed. / 406
(b) / Builder / 407
(i) / TheBuildershallsafelystoreandhandlethe Buyer’sSuppliesafterdeliverythereof / 408
ata warehouseorother storagefacilityat theShipyardorelsewhereasdetermined / 409
bythe Builderandshall, atits owncost,expense andresponsibility,installthemin / 410
orontheVesselinaccordancewith the Specification,providedthat the Buildershall / 411
notberesponsibleforthequality,efficiency and/orperformance ofany ofthe Buyer’s / 412
Supplies. / 413
(ii) / The Buyer’sSuppliesshallbeatalltimestheproperty ofthe Buyerbutshallbeat / 414
the Builder’sriskfrom thetime oftheirdeliveryto theShipyarduntil thetimeoftheir / 415
redeliveryto the Buyerwhetherornotaspart of theVessel. / 416
22.Buyer’sRepresentative,Assistants, Officers andCrew417
(a)The Buyermay, at its owncostand expense,haveonerepresentativepresentat the418
Shipyardthroughout theconstructiontogetherwith areasonablenumberofassistants419
and,asappropriate,officersand crew.The BuyershallnotifytheBuilderin advancein420
writingof:421
(i)the namesofthe Buyer’sRepresentative,assistantsand,asappropriate, officers422
andcrew;and423
(ii)the scope ofthe Buyer’s Representative’sauthoritywhich,inparticular, shallinclude424
the extent to which the Buyer’sRepresentativehasauthoritytoapproveplans,425
drawingsandcalculations,agreemodifications andinvoicesandattendanceatand426
approvaloftests, trialsandinspectionsrelating totheVesselatthe Shipyardand/or427
premises ofSub-contractors;and428
(iii)anyotherinformationreasonablyrequiredbytheBuildertofacilitateaccesstothe429
Shipyardand/orpremisesofSub-contractors.430
(b)TheBuildershall,atitsowncostandexpense,provide the Buyer’sRepresentativeand431
assistants withreasonableofficeaccommodationandfacilities(includingcommunication432
equipment, suchastelephone, faxandappropriateinternetaccess,andprintersora433
connectiontothe Builder’sprinters)asthe Buyer mayreasonablyrequire. The Buyer434
shallbear the costs ofallcommunication expensesarisingfrom the usebythe Buyer’s435
Representativeandassistants ofthe communicationsequipmentprovidedbythe Builder.436
Suchexpensesshallbe payablebythe Buyeronreceiptofan invoice fromthe Builder437
inaccordance withClause15(b)(Payments-PaymentforModifications andother438
items).439
(c)TheBuildershallhavetheright torequest the Buyertoreplacethe Buyer’s440
Representativeoranyassistantsbutonlyifthe Buildershowsthattheyarecarrying441
outtheirdutiesinanunreasonablemannerdetrimentaltotheproperprogressof the442
constructionof the Vessel,inwhichcase the Buyershallmakeproperreplacementas443
soonaspossible.444
(d)The Buyer’sRepresentativeshallhave the right tocommunicatedirectlywiththe445
ClassificationSociety,providedsuchcommunicationdoesnotunreasonablyinterfere446
with theBuilder’scommunicationwith the ClassificationSociety.447
(e)TheBuildershallrender reasonableassistancetothe Buyerinhelping to provide448
suitableaccommodation,obtainnecessary visas, residenceand workpermitsandany449
otheradministrativeassistanceas the case maybeforthe Buyer’sRepresentative,450
assistantsand,asappropriate,officersand crew.451
23.Inspections,TestsandTrials452
(a)Toenable the Buyer’sRepresentativeandassistantsto carry out theirdutiesand453
inspect the workbeingdone,the Buyer’sRepresentativeand/orassistantsshallhave454
theright to inspect theVesselthroughout the periodoftheconstructionof the Vesseland455
until its deliveryandacceptance.456
(b)The Buyer’sRepresentativeand/orassistants shallhave the right toattendalltests,457
trialsandinspections,includingthosesupervisedbythe ClassificationSocietyandRegulatory458
Authorities,onanypartsofthe Vesselwhetherornotinstalled.The Buildershallgivethe459
Buyerreasonablenoticeinadvanceofallsuchtests,trialsandinspections toenablethe460
Buyer’sRepresentativeand/orassistantstoattend. Ifthe Buyer’sRepresentativeand/or461
assistantsbecomesawareofnon-conformity ofany aspectofthe design, construction,material462orworkmanshiparisingoutofsuch tests, trialsandinspectionshe/theyshallnotifythe Builder 463assoonaspossible. 464
(c)For the purposes ofattendingsuchinspections,testsandtrialstheBuildershall,at465
Anytimeduringworkinghoursoratanyothertimewhenworkisbeingperformed,provide 466
The Buyer’sRepresentativeand/orassistants withunimpededaccess totheShipyard,467
Vessel,workshops,and anywhereelsewhereworkonorstorage ofitemsconnectedwith468
Theconstructionofthe Vesselisbeingperformed. TheBuildershalluseitsbestefforts469
to arrangesimilaraccessforinspectionpurposesto sub-contractor’spremisesduring470
workinghoursoratanytimewhenworkisbeingperformed.471
(d)Neither the Buyer’sRepresentative’sand/orassistants’inspectionand/orattendance472
atanyinspection, testortrial,northe Buyer’sRepresentative’sand/or assistants’failureto 473
notifytheBuilderofanynon-conformityshallrelieve the Builder fromitsobligationsunder474
thisContractorbedeemed tobeorconstruedasa waiverofanyobjectionto,orany475
acceptanceof, faultydesign,construction,materialand/orworkmanship,oranyadmission 476
thatanymaterialsorworkmanshipareofthestandardrequiredfor dueperformanceof477
thisContract.478
24.ModificationsandChanges479
(a)The Buyershallhave therightatanytimetorequest reasonablemodificationsor480
changesinthe Specificationand/orPlansandDrawings.The Buyershallrequestsuch481
modificationsand/orchangesinwriting, givingsufficientparticulars,documentationand482
detailsfullyto describethemodificationsand/orchangesrequested.483
(b)TheBuildershall,as soonaspossibleafterreceiptofthe writtenrequestfor484
modificationsorchanges, give the Buyera writtenproposaloftheconsequencesof485
implementingsuch modificationsand/orchanges.Theseconsequencesmayinclude486
changesinthe Contract Price,DeliveryDate,capacity,draft,speed, fuelconsumption,487
oranyotherprovisionsof thisContract.Ifinthe Builder’sreasonablejudgement,such488
modificationsand/orchanges willadverselyaffect theBuilder’splanningor programme489
inrelationtothe Builder’sothercommitments, theBuildershallnotifythe Buyerthat it490
declines togivesucha proposalfortherequestedmodificationsand/orchangesorpart491
thereof.492
(c)TheBuildershallusereasonableeffortstominimise theextracosts,delayorother493
negativeimpactonthe Vessel’scapacity,performanceorother factorscausedbythe494
Buyer’srequest. TheBuilder’sproposalshallbereasonablefor suchwork.495