1.
/ Draft AgendaAgenda ERMTGSRR(12)013002r1 was approved, no changes
- Meeting Participants:
Wöste, Christoph, BNetzA
Dr. Clark, Stephan, NAVTECH
Dr. Ehrhardt Klaus- Dieter, DFS for TC AERO
Frank, Ernst, RB
Dr. John Andreas, Hella
Long, Nicholas, Great Circle Design
Dr. Michael Mahler, RB, Secretary
Dr. Rudolf, Thomas, Valeo
Schuermann, Josef, JSConsulting, Chairman
Waanders, Tim, Eurocopter
Hildebrandt, Jürgen, RB
Dr. Gruson, Frank, Continental, Vice Chairman
Kempe, Ingo, Scheidt Bachmann GmbH Guest
Dr. Dominik, Hans, Autoliv
Registered but absent
Dr. Blöcher, Hans–Ludwig
- Mr. Wöste gave a brief introduction
- An introduction round of participants was given
- ETSI IPR Policy information /reminder was given by the chairman, see also end of the agenda.
No IPR was claimed from the participants of the meeting /
002
2. / Minutes update from Meeting #12Minutes were approved
Proposal: Issue Minutes directly after the meeting to ERM TGSRR and approve by
remote consensus
Reason: Approval is more close to the meeting, and will support timely start of
agreed actions
è This was agreed
/ 003
3. / Reports: FM #75 Minsk related docs;
- Doc 004a: FM minutes excerpt and LS to ETSI concerning a SRDoc request for
infrastructure application.
è Note from MM: Presently there are discrepancies between Annex 5 of ERC/REC 70-03 (only ground based vehicle radar; see Doc 13004b) and EC DEC for SRD (automotive and fixed road infrastructure.
- Doc 004c: LS to ETSI requesting SRDoc, studies for 76 GHz infrastructure
- Doc 004c: LS to SE, ETSI for Helicopters: studies & SRDoc request
- Doc 004d: Eurocopter presentation
- Doc 004e: Prelim. RSCOM proposal for 5th update of EC SRD Decision
Reports: ITU-R Issues:
- Doc 004c: ITU-R Resolution #654 to close the Radio Location gap of 77.5-81 GHz providing a contiguous range 76 to 81 GHz for Radio Location Service
- Doc 004c latest version of the ITU-R M.1452-2, mmWave Radars for ITS / 004r2
4. / Report: ERM # 48 (Nov 19th, 2012)
- Doc 005 TGSRR Report to ERM #48, and ERM executive summary decisions (Executive Summary was not presented but results were highlighted as part of the TGSRR report) / 005r1
5. / WI: 24 GHz: EN 302 858 (to include WLAM)
- Doc 006r1 was commented and edited during the meeting and is uploaded as
doc 006r2
- Further editing is necessary to complete part 1.
- Part 2: to be completed upon a stable draft of part 1,
- General: continue editing with the new template
(Note: The new template was already requested from ERM support after the meeting from Chairman)
Some editing details:
1. Amend scope explaining WLAM and EN concept
2. new chapter 7.X for OOB measurement/limits, (see EN 301 091 concept)
3. check OOB necessity by TGSRR technical experts, actually there is no OOB chapter
4. draft / proposal from Mr. John for NB part
5. new OOB section will become 7.7:
6. spurious will be 7.8
7. In Chapter B.2.1, Table B.1 for WLAM à All limits should be in dBm
8. All four operation modes have to be measured (see note below table B.1)
9. Correct Table B.2 à first edits in working draft.
10. Within Annex B: OOB measurements for WLAM in NB mode and the four
WLAM modes
11. Within Annex B: make a new chapter for spurious emissions
è There should be no reference between NB (chapter 7 and 8) of the main document and WLAM devices (Annex B) is preferred by the participants.
12. Annex D is only valid for WLAM, therefore transfer to Annex B.
Time Schedules
- 8.2.2013: GoTo Meeting; 10:00 – 12:00 (action MM to arrange)
- TG SRR approval via Remote Consensus (R.C.)
- ERM approval of agreed part 1 & 2 during ERM #49 (March 2013)
- MM will update the ETSI time schedules on the WI
- Final draft until 21. 2 2013 by Valeo & Chairman
/ 006r1
6. / 76 GHz EN 301 091 issues
MM gave a summary on the history of this topic
6.1 / WI: EN 301 091: WI Status amending EN 301 091 (007)
- TGSRR approved to change the WI (see 007r1) to eliminate the planned normative Annex B for Railway Crossing Applications which was discussed in ERM #48
- First stable draft available for SRR #14 (21st / Feb, MM)
- - After some discussions, it was agreed to have a new standard for the Railway
Crossings Applications according to ERC REC 70-03 Annex 4.
- Three options were discussed:
1: a new part 3 of the EN 301 091 (In addition to parts 1 and 2),
2. a complete new HEN 303 xxx
3. a new two part of EN 303 xxx
The agreement was to go for the preferred option of #1 if clarified with ETSI.
ACTIONs - JS to clarify with ETSI if the preferred option #1 can be realized.
If option 1 is possible, a new NWI for a part 3 of the EN 301 091,
will be created for the Railway Crossing application. A draft NWI
was presented during the meeting (doc 010).
The following action is to approve by TG SRR via R.C. where the
supporters –as given in doc 010- can confirm their support.
Post meeting Note. ETSI (Igor Minaev) was contacted on 2012-12-07. The option
(by JS) #1 was seen in principle as feasible.
A draft proposal of an EN 301 091 part 3 structure is to
forward to ETSI for verification of the concept.
Action: - JS send draft proposal to Igor Minaev by e.o. week 50 or 51.
Reconfirm the part 3 approach by ETSI Igor Minaev
- Create a TGSRR NWI for the part 3 as HEN / 007, 010
6.2 / Other requests: - NWI’s for SRDs for Eurocopter, Navtec applications
NWI on 76 to 77 GHz on fixed road infrastructure (009r1)
- After reviewing the outcome of the WGFM meeting and LS to ETSI, the draft NWI for fixed road infrastructure doc 009r1 was discussed.
- Robert Bosch GmbH, Continental and BNetzA are only supporting the
proposed SRDoc & studies on fixed road infrastructure equipment and
vehicular equipment according to LS from WGFM.
There will be no support for a general request for 76 to 77 GHz e.g. for this band for Annex 6 (generic type application Radiolocation equipment).
- The doc 009 was amended and is uploaded as doc 009r1
The Doc was uploaded as 009r1 because the meeting version 009r2 has not been uploaded before to the docbox.
Note: in case the meeting version 009r2 will be changed, the supporters
should be informed and verified (OFCOM, EADS, Navtech,Great Circle
Design)
Action: JS to create a TGSRR NWI from the meeting version 009r2.
NWI for Helicopter (008r2)
- Tim Wanders gave a presentation of the proposed helicopter application.
- The NWI proposal of 8r1 proposal was edited & will be uploaded as 008r3
- Mr Ehrhardt: TC AERO would like to be strongly involved in the preparation
(including changes in the remark section of NWI)
The next meeting of TC AERO meeting is 26 to 27 of February
- The meeting version (doc 008r3) will be uploaded with the NWI process. / 004a
008r2, 009r1, 009r2
7. / Others, next meeting, LS
- LS docs to be sent:
To ECC WG SE and WGFM / in copy to be sent to TC AERO
Action: - J.S / M.M. provide draft/proposal till 12th
- To inform that ETSI ERM has start the preparation of two SRDoc
for fixed road infrastructure and Helicopter application to be
approved by ERM via R.C.
- G2M on HEN 302 858 Date: 8th February; Time: 10:00 -12:00
- Next TG SRR meeting #14; Date: 19 Febr. ! Timing: 10:00 - 16:00
Location: Mainz BNetzA
Close of Meeting 14:40 by Josef Schuermann / Chairman
ETSI IPR Policy
“The attention of the members of this Technical Body is drawn to the fact that ETSI Members shall use reasonable endeavours under clause 4.1 of the ETSI IPR Policy, Annex 6 of the Rules of Procedure, to inform ETSI of Essential
IPRs in a timely fashion. This section covers the obligation to notify its own IPRs but also other companies’ IPRs.
The members take note that they are hereby invited:
· to investigate in their company whether their company does own IPRs which are, or are likely to become Essential in respect of the work of the Technical Body,
· to notify to the Chairman or to the ETSI Director-General all potential IPRs that their company may own, by means of the IPR Information Statement and the Licensing Declaration forms that they can obtain from the ETSI Technical Officer or http://www.etsi.org/legal/IPR-Forms.
IPR declarations can also be made online using http://webapp.etsi.org/IPR_online_declaration
Members are encouraged to make general IPR undertakings/declarations that they will make licenses available for all their IPRs under FRAND terms and conditions related to a specific standardization area and then, as soon as feasible, provide (or refine) detailed disclosures.