telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

PREQUALIFICATION QUESTIONNAIRE

For

TELECOM BLDG. HVAC UPGRADES

UCSD MEDICAL CENTER – HILLCREST

UNIVERSITY OF CALIFORNIA, SAN DIEGO

PROJECT NO. 4606/966193

C10 - ELECTRICAL CONTRACTOR

SUBMITTED BY:

please enter your company name here

UNIVERSITY OF CALIFORNIA, SAN DIEGO

FACILITIES DESIGN & CONSTRUCTION

10280 NORTH TORREY PINES ROAD

LA JOLLA, CA 92037

ISSUE DATE: AUGUST 7, 2014

MANDATORY PREQUALIFICATION MEETING: AUGUST 13, 2014

SUBMITTALS DUE: AUGUST 27, 2014

(Where a time period is given, such as the last ten [10] years, the period is to be measured backwards from the date this prequalification questionnaire is required to be submitted to the University of California at San Diego.)

Note: Submission of an incomplete or unclear Prequalification Questionnaire may result in the determination of the prospective Contractor as NON-PREQUALIFIED.

SUBMITTED BY:

(Name and Title) Printed or Typed

(Signature)

(Firm Name)

(Contact Name for all notices and correspondence)

(Address)

(City, State, Zip Code)

______

(Telephone Number)(Facsimile Number)

(E-mail Address)

Each prospective Contractor must havethe following California Specialty Contractor’s License, License Code: C10 – Electrical Contractor,current, active and in good standing with the California Contractor’s State License Board on the date and time of the Prequalification Questionnaire submittal is due and must submit this Prequalification Questionnaire with all portions completed, including required attachments.

Each prospective Contractor must answer all of the following questions and provide all requested information, where applicable. Any prospective Contractor failing to do so may be deemed to be not responsive and not responsible with respect to this Prequalification at the sole discretion of the University. Each prospective Contractor must submit four (4)printed sets andone (1) flashdrive with complete submittalof the questionnaire. All Contractors that have submitted a Prequalification Questionnaire will be notified in writing of either successfully or not successfully achieving prequalification status. The decision of the University is final and is not appealable within the University of California system.

All information submitted for Prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law.

It is critical that the prospective Contractor fills out all information required accurately, completely, truthfully and to the best of their knowledge. Ambiguous or incomplete information may lead to an unfavorable rating and subsequent status as non-prequalified.

WHERE NECESSARY, COPY THE FORMS IN THIS PACKAGE. USE ONLY THESE FORMS.

1.PREQUALIFICATION DECLARATION

I, ______, hereby declare that I am the

(Printed Name)

______of ______

(Title)(Name of Firm)

submitting this Prequalification Questionnaire; that I am duly authorized to sign this Prequalification Questionnaire on behalf of the above named firm; and that all information set forth in this Prequalification Questionnaire and all attachments hereto are, to the best of my knowledge, true, accurate and complete as of its submission date.

The undersigned declares under penalty of perjury that all of the prequalification information submitted with this form is true and correct and that this declaration was executed in

______(County), ______, (State)

on ______(Date).

______

(Signature)

2.ATTENDANCE AT MANDATORY PREQUALIFICATION CONFERENCE

Did a representative of your firm attend the Mandatory Prequalification Conference at the University of California, San Diego, La Jolla?

YES NO

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

Name/names of those attending: ______

Date of Meeting Attended:______

3.LICENSE

A.Does your firm hold the following California contractor's license, which is current, valid, and in good standing with the California Contractor's State License Board?

License Classification: Electrical Contractor

License Code: C10

YES0NO0

B.Provide the following information about your firm's contractor's license:

1.Name of license holder exactly as on file with the California Contractor's State License Board:

______

  1. License Classification: ______
  1. License Code: ______
  1. License Number: ______

5.Date Issued: ______

6.Expiration Date: ______

C.Can you truthfully state that your firm's contractor's license has not been suspended or revoked by the California Contractor's State License Board within the last five (5) years?

YES NO

If answer is “No,” explain on attached additional sheets.

D.Has a complaint ever been filed with the Contractor’s State License Board against your company that required a formal hearing or inquiry?

YES NO

E.Does your firm have experience utilizing CPM logic, Primavera Project Planner scheduling software on your projects and would you utilize this experience on this project?

YES NO

If“No,”name the software application(s) used or the software application you would propose for use on this project for scheduling.

4.SURETY

Prospective Contractor desiring to be prequalified are informed that they will be subject to and must fully comply with all bid conditions including 100% payment and 100% performance bonds.

Prospective Contractor shall submit the below form, signed by representative of surety and notarized. If firm has used current surety for less than ten years, list surety(ies) previously used and indicate number of years used to demonstrate ten (10) complete years of surety history.

A.Is the surety to be used listed in the latest published State of California Department of Insurance list of Insurance Organizations Authorized by the Insurance Commissioner to Transact Business of Insurance in the State of California?

YES NO

B.Is the prospective Contractor able to obtain bonding up to and including the cost of electrical portion for this construction contract estimated at $100,000 of which no more than 50% is currently committed to other projects?

YES NO

C.Is it true that the surety has not paid out any monies for the construction activities of the prospective Contractor whatsoever within the last ten (10) years?

YES NO

If answer is “No,” explain on attached additional sheets.

D.How long has the Prospective Contractor been with this surety? years

E.Surety Declaration:

Provide this Declaration of your surety(ies) for completion. Do not have the surety submit this information directly to the University.

The undersigned declares under penalty of perjury that all of the above surety information is true and correct and that this declaration was executed in

County, California, on (date).

(Signature)

(Name and Title - Printed or Typed)

(Representing [Surety Name])

(Surety License Number)

(Firm Name)

(Address)(City, State, Zip Code)

______

(Telephone Number)(Facsimile Number)

(Email Address)

(ATTACH NOTARIZATION of SURETY REPRESENTATIVE’S SIGNATURE)

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

5.INSURER

Prospective Contractor desiring to be prequalified is informed that they will be subject to and must fully comply with all bid conditions including the following insurance coverage and associated limits.

Prospective Contractor shall submit the below form, signed by representative of insurer and notarized. If firm has used current insurer for less than ten years, list insurer(s) previously used and indicate number of years used to demonstrate ten (10) complete years of insurer history.

A.Is the insurer to be used listed by Best with a rating of A- or better and a financial classification of VIII or better (or an equivalent rating by Standard & Poor’s or Moody's)?

YES NO

Indicate Best Rating:

Indicate Best Financial Classification:

B.Is the prospective Contractor able to obtain insurance in the following limits for each of these construction contracts?

YES NO

Minimum

Comprehensive or Commercial Form General Liability Insurance - Limits of LiabilityRequirement

Each Occurrence - Combined Single Limit for Bodily Injury and Property Damage $1,000,000

Products - Completed Operations Aggregate $2,000,000

Personal and Advertising Injury $1,000,000

General Aggregate - Not Applicable to Comprehensive Form $2,000,000

Business Automobile Liability Insurance - Limits of Liability

Each Accident - Combined Single Limit for Bodily Injury and Property Damage $1,000,000

C.How long has the Prospective Contractor been with this insurer? years

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

  1. Insurance Declaration:

Provide this Declaration to your insurance carrier for completion. Do not have the carrier submit this information to the University.

The undersigned declares under penalty of perjury that all of the above insurer information is true and correct and that this declaration was executed in

County, California, on (date).

(Signature)

(Name and Title - Printed or Typed)

(Representing [Insurer Name])

(Insurer’s License Number)

(Firm Name)

(Address)(City, State, Zip Code)

(Telephone Number)(Facsimile Telephone Number)

(Email Address)

(ATTACH NOTARIZATION of INSURER REPRESENTATIVE’S SIGNATURE)

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

6.CONSTRUCTION EXPERIENCE

Submit Project Data on a minimum of three (3) and a maximum of five (5)comparable projects successfully completed within the last ten (10) years constructed in the United States of America all of which were constructed in the State of California.

A comparable project is defined as having a construction cost at the bid date of at least $100,000 or a total of $500,000for the projects submitted, and the following example building types:

  • Electrical work associated with hospital renovation.
  • Mechanical infrastructure upgrade within an operational acute care large hospital.
  • Mechanical infrastructure upgrade to an existing telecommunication control hub for a large institution,and

Such projects should have possessed the following construction challenges:

  • Urban site work with limited construction and staging areas.
  • Infection control requirements.
  • Complex phasing plan development and execution.
  • Construction activity protection for sensitive telecommunication equipment.
  • Repair of facilities requiring proactive and innovative solutions due to noise, dust, and pedestrian traffic while the hospital is in operation.
  • Renovations/expansions requiring proactive and innovative solutions due to unknown and/or unforeseen field conditions.
  • Project complexity requiring tracking of multiple functions and phases to accommodate the operation of the hospital.
  • Project complexity requiring critical path construction scheduling to complete on time.

Such projects should include these specific components:

  • Electrical work associated with replacement of existing air handler unit, ducting, and controls in an operatingtelecommunications hub for an acute care hospital.
  • Modification of existing feeders, panels, or distribution boards in an operational acute care hospital

A.Listed projects must have been managed and constructed under the business name submitted for prequalification. Projects completed by employees for former employers are not acceptable.

B.Submit the following Project Data Sheets for each project submitted as evidence of your firm's Contractor expertise.

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

PROJECT DATA SHEET

(A separate sheet must be prepared for each project submitted.)

1.Project Name:______

2.Project Location:______

3.Project Description:______

4.Constr. Type:

5. Size (gross square feet): ______

  1. What was your company’s role on this project?

Prime (General) Contractor

Subcontractor to GC

3rd Tier Subcontractor

Prime to Owner

Other: ______

List the Business Entity (name) your company used to perform work for this project: ______

7.How is this project comparable to the TELECOM BLDG. HVAC UPGRADESproject? ______

______

______

______

8.Was the project completed within budget?

Cost At Bid:$

Cost At Completion:$

Explanation: ______

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

9.For any differing amount between cost at completion and cost at bid, distribute the sources or causes of these changes into the following categories:

Document Problems:$

Unforeseen Conditions:$

Owner Generated Scope:$

Regulatory Agency:$

Other:$

10.Was construction begun and completed within the last ten (10) years?

YES NO

11.Was the project completed within the original contract time or the adjusted contract time?

YES NO

If completion did not occur within the original or the adjusted contract time, indicate elapsed time in whole calendar days between original or adjusted contract time and actual final completion. For projects that have not reached final completion, indicate current status with respect to contract time:

______

12.Did the project include occupied facilities?

YES NO

13.Did the project include replacement of existing air handleror other mechanical equipment in an operational acute care large hospital?

YES NO

14.Did the project include modification of existing feeders, panels, or distributionboards inan operational acute care hospital?

YES NO

15.Did the project include construction phasing to accommodate the operation of patient care areas?

YES NO

16.What communications strategies were used by your firm to assist the project team in mitigating the impacts of construction on the occupied facilities? ______

17.What Infection Control measures were carried out on the project? Describe Infection Control means and methods, types of containment barriers, ICRA Permit process, monitoring and maintenance of containment barriers for the project. Include whether infection control specialty subcontractor was used, or whether in-house personnel performed infection control.

______

______

______

18.Was the project for a university or public institution?

YES NO

19.What strategic decisions did your firm contribute to the project which supported the project’s success (e.g. value engineering, phasing, innovation, new technology, etc.)? ______

20.Did the project include adherence to critical path scheduling?

YES NO

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

21.Did the project include a quality control/quality assurance program?

YES NO

If “Yes,” explain: ______

22.Did the project include OSHPD Fire Life Safety Officer review and approval (planning, scheduling and obtaining OSHPD Fire Life Safety Officer approval of materials, shop drawings, and systems testing)?

YES NO

23.Did the Owner assess any back-charges?

YES NO

If answer is “Yes,” explain: ______

24.Did the Owner assess any liquidated damages?

YES NO

If answer is “Yes,” explain: ______

25.Name of Project Executive:______

Qualifications of this Project Executive:______

______

26.Name of Project Manager: ______

Qualifications of this Project Manager: ______

______

27.Name of Project Superintendent: ______

Qualifications of this Project Superintendent: ______

______

28.Name of Project Engineer: ______

Qualifications of this Project Engineer: ______

______

29.Did your firm self-perform any of the work?

YES NO

If “Yes,” please specify the trades you self-performed or have the capability to self-perform:

______

______

______

30.Did an independent agency or firm hired by the owner prepare commissioning procedures for the installed equipment?

YES NO

If “Yes,” please name the firm.

______

______

______

If “No,” did you hire a commissioning agent as part of contractual obligations and subcontract out the work or self-perform?

______

______

______

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

Client Firm Name:
Client Contact: / Title:
Client Address: / City, State Zip
Client Phone: / Client Fax:
Client E-mail Address:
Architect/Engineer/
Consultants:
Architect/Engineer
Contact Name: / Phone:
Architect/Engineer
E-mail Address:

(Attach additional pages with other pertinent project information as necessary.)

General ContractorPage 1 of 23Prequalification Questionnaire

GC P/Q Quest

(UCSD Rev. 10/2012)

telecom bldg. hvac upgradesPROJECT NO.: 4606/A4S-024/966193

UCSD MEDICAL CENTER – HILLCREST

university of california, san diego

7.STAFF EXPERIENCE AND PROJECT SAFETY

The Project Manager and Project Superintendent listed will be considered qualified only if he/she has successfully completed at least three (3) comparable projects.

A.Contractor hereby commits as a minimum to assignment of the specific field staff as outlined below. Contractor to submit a complete staffing chart as part of this package.

  • One Project Executive(part-time) during construction.

The Project Executive will be on site part-time during construction and on site for construction meetings.

  • One Project Manager (part-time) during construction

Contractor shall assign one Project Manager to oversee, manage and coordinate the project. The magnitude and complexity of the project will necessitate that this position manage the entire construction process. This position will need to be involved with all aspects of the project including but not limited to all scheduling and budgeting meetings, overall construction process development and execution, multi-staff operation management and coordination. The project manager will take the lead position in all Architect and University issues including overall contract administration, RFI, RFP and contract change order negotiations, campus and community relations. The project manager will be the main contact on behalf of the contractor and will be responsible for guiding the construction development process to successful completion. The project manager will be responsible for budget, quality and schedule.

  • One Project Superintendent (full-time on site) during construction

The Contractor will assign one Project Superintendentto manage, coordinate and facilitate the field supervision staff for each of the various components of the project construction process. The major function of this position will be in addition to the normal superintendent’s daily workload, subcontractor interaction and production, and various field related coordination issues.

B. At the time of bid, the successful Contractor will be required to reconfirm staff assignments to the project based on this submittal. If any of the named staff submitted are no longer employed by the firm at the time the project starts, or are otherwise unavailable, the firm's bid may be considered non-responsive. Substitution of other individuals with equivalent experience may be considered by the University, however resumes, comparable project history and other relevant information must be submitted to the University prior to the determination of the bid results.