Table3.11:Ourdecisions on the CP5output framework
Area / Outputs / Indicators / Enablers (thesesupportall outputareas)Trainservicereliability /
- PPM: for EnglandWales(annualwithaCP5exitof92.5%),Scotland(annual 92%andCP5exitof92.5%)andfranchisedTOCs in EnglandWales(rollingannualoutput JPIP,noTOCto exitCP5below90%,exceptEastCoastandVirginwhomust not exitCP5withPPMbelow88%orCaSLabove 4.2%and2.9% respectively.Additional88%minimumforFirstGreatWestern highspeedservicesattheendofCP5)
- CaSLfor EnglandWales(annualandCP5exitof2.2%)androllingannual outputJPIP
- FreightDeliveryMetric(Nationalannual92.5%)
- PPM:sectorand sub-operator
- Right-timeperformance:England
- Averagelateness:EnglandWales,Scotland,sectorandJPIP
- CaSL:sector andsub-operator
- Delayminutes,split bycategory (includingNetworkRail onTOC,TOC onselfandTOConTOC):forNational,EnglandWales,Scotland,sector,NetworkRailrouteand JPIP
- FDMbystrategicfreight corridor
- Freightdelayminutes(national)
- ScotlandKPI package
- Safetymanagementmaturity (RailwayManagementMaturityModel– RM3)
- Systemoperatorcapability
- Programmemanagementcapability(P3M3)
- Customerservicematurity
Enhancements /
- Enhancement schemedelivery milestones(set in anenhancementsdelivery plan)
- Developmentmilestonesfor earlystageprojects
- EnhancementfundKPIs(e.g. averageschemebenefit costratios)
- ImprovedgovernanceprocessesforHLOSfunds
- Projectactivities andmilestones
Health andsafety /
- A planofprojectsinCP5,toachieve themaximumpossiblereduction in riskofaccidentsatlevelcrossingsusing the
Area / Outputs / Indicators / Enablers (thesesupportall outputareas)
Networkavailability /
- PDI-P(NationalCP5exitof0.58
- PDI-F(NationalCP5exitof0.73)
Networkcapability /
- Baserequirement atstartofCP5intermsoftrackmileagelayout,linespeed,gauge, routeavailability,electrificationtype
Stations /
- SSMbystationcategoryforEngland
Depots /
- Light MaintenanceDepotStewardshipMeasure:EnglandWales,Scotland andNational
Assetmanagement /
- Asset managementexcellence(AMEM)capabilityfor eachcoregroup atNationallevel
- Assetdataqualityforeachasset type atNationallevel
- MilestonesforORBIS
- AssetconditionforrobustnessandsustainabilityatNationalandroutelevel
- AMEMlitecapabilityatroutelevel
- Renewalandmaintenancevolumesbyasset typeandspend at Nationalandroutelevel
Environment /
- Scope 1and2tractionandnon-tractioncarbon dioxideemissions:EnglandWalesandScotland
- Carbonembeddedinnewinfrastructure
- SustainabledevelopmentKPIs
Area / Outputs / Indicators / Enablers (thesesupportall outputareas)
Other /
- Passengersatisfaction
- Journeytime
- Cross-border serviceavailability