/ Module B KDHE COST PROPOSAL

attachment b3

disposal

Disposal costs associated with water and soil collected during monitor well drilling, well development, well purging, aquifer testing, soil boring, excavation and ground water screening, and soil gas testing will be determined prior to actual disposal. The method and location must meet all applicable regulations and will require the approval of the KDHE Project Manager. Disposal costs will be based on cost plus applicable surcharge for subcontract or disposal facility pricing. Vendor costs will be in accordance with the following schedule.

Surcharge Rate Table

Surcharge Description / Surcharge %
Surcharge on Non-Standard Items (less than $5,000) / 10 %
Surcharge on Non-Standard Items ($5,000 to $25,000) / 8 %
Surcharge on Non-Standard Items (greater than $25,000) / 6 %

attachment b4

investigative components

1. DRILLING

Proposed rates are identical to those shown in Attachment A4.

2. GROUND WATER SCREENING/SOIL GAS SURVEY

Proposed rates are identical to those shown in Attachment A4.

3. GEOPHYSICAL SURVEYS

Proposed rates are identical to those shown in Attachment A4.

4. AQUIFER TESTING

Proposed rates are identical to those shown in Attachment A4.

5. GEOPHYSICAL LOGGING

Proposed rates are identical to those shown in Attachment A4.

6. LEAD/LEAD PAINT AND ASBESTOS INSPECTIONS

6a. ASBESTOS INSPECTION

INTEGRATED SOLUTIONS
Task / Cost/Hour / Cost/Day
Site Reconnaissance / $121.00 / $968.00
Inspection / $121.00 / $968.00
Vehicle / NA / $27.50
LUMP SUM
Inspection Report
< 5,000 Sq Feet / $1,375.00
Inspection Report
5,001 – 10,000 Sq Feet / $1,375.00
Inspection Report
10,001 – 25,000 Sq Feet / $1,375.00
Inspection Report
> 25,000 Sq Feet / $1,375.00
PER SAMPLE
Bulk Sample Asbestos Analysis / $7.70 each + Shipping

6b. LEAD INSPECTION

INTEGRATED SOLUTIONS
Task / Cost/Hour / Cost/Day
Inspection / $121.00 per hour / $968.00 per day
Inspection Report / $1,375.00 lump sum / -

7. SURVEYING

Proposed rates are identical to those shown in Attachment A4.