SECTION 37 :RATES

ELEMENT A :GENERAL

SUB-ELEMENT : MODULAR BUILDINGS

SUPPLY AND FIX

1. NOMINEES

ROLLALONG LIMITED Contact: Steve Chivers- General Manager

Woolsbridge Industrial Park Tel: 01202 812522

Three Legged Cross Mob: 07825 130577

Wimborne E-mail:

Dorset

BH21 6SF

2. WERNICK BUILDINGS LIMITED Contact: Kerry Jones – Senior Estimator

Nidum Works

Neath Abbey Tel: 01792 321222

Neath Fax:

West Glamorgan

SA10 7DS

3. CONSULTANCY LIAISON

Pillar Consultancy, Contact: Mr K A Frewin

Kestrel Court, E-mail:

Waterwells Drive, Tel: 01242 525241

Waterwells Business Park, Fax: 01242 303909

Quedgeley, GL2 2AT Mob: 07703314766

4. RATES BASIS

(a) The rates scheduled are Basic RATES current at March 2011. They are subject to the Variation of Price surcharge clause 4.

(b)  The rates include the SCOLA levy refundable to Pillar Consultancy.

(c)  The rates do not include the main contractor’s discount if appointed as a sub-contractor in which case 1/39th is to be added

(d)  The rates exclude Value Added Tax.

(e)  To ensure the benefits and rates applicable to this programme agreement are obtained it is imperative that the initial enquiry states the quotation is to be in accordance with the Pillar/Scola Consultancy Programme Agreement for Modular Buildings; Rollalong Limited - Contract No. 111; Wernick Buildings Limited - Contract No. 211

5. VARIATION OF PRICE SURCHARGE

The basic rates are subject to a surcharge to update the rates to current prices, according to the date of commencement of sub-contract work on site as follows:

The surcharges are calculated by the following formula, which allows for movement in the Department for Business, Innovation & Skills (BIS) (formerly known as the BERR) index Table 1 Construction Material Prices Category “B”

Surcharge = 100 x index for preceding month less index for March 2011(138.8)

Index for March 2011(138.8)

expressed to two decimal places.

PILLAR : 0711 37:A:001

6. RATES SCHEDULE

The rates schedule contain the detailed specification notes for each standard unit together with an overall price and elemental breakdown. Detailed quotations must be sought from the Nominee for each project. Pillar Consultancy can check that any quotation is in accordance with the Programme Agreement, upon request from a user.

7. QUANTITY DISCOUNTS

If the total value of an individual order is a) between £1million and £2million pounds there will be a 1% discount and b) over £2million the discount will be 2% .

8. SECTIONAL WORKING

If sub-contract work on site has to be carried out either discontinuously or in sections with different starting dates (even if work is continuous), for any reason outside the Nominees control, each section of work shall be treated separately when ascertaining the relevant commencement dates and the appropriate variation of price surcharge.

9. DAYWORK RATES

Daywork, when authorised, shall be charged at the following rates in accordance with the "Definition of Prime Cost of Daywork carried out under a Building Contract, Second Edition (1/12/75)" (subject to cash discount but not subject to surcharge or SCOLA levy).

Rollalong Wernick Rollalong Wernick Rollalong Wernick

Labour + 175% +150% Materials + 20% +25% Plant + 20% +15%

10 MINIMUM NOTICE PERIODS

The following minimum notice will be required from placement of order and/ or final confirmation of details (whichever is the later), for delivery and commencement covered by this arrangement.;-

Rollalong 8 weeks Wernick ? weeks

11. SPECIFICATION FOR STANDARD UNITS

Before the costs for each of the standard units there is a detailed list of exactly what items have been included, followed by a comprehensive schedule of rates for alternatives and external works.

12. NOMINEE ACTING AS MAIN CONTRACTOR

If a principal contractor has not been appointed the nominee is willing to operate as the main contractor, in which case the following will apply:-

In respect of any prime cost sums to be incorporated in the contract an addition of 10% will be made to cover profit and general attendance. Any special attendance will be quoted on each individual project for which it is required.

37:A:002 PILLAR: 0711

13. AUTHORITIES NAMED IN TENDER DOCUMENT

Authority / Contact / Title
Medway Council / Cathy Arnold / Capital Programme Manager
East Sussex CC / Philip Tucker / Head of Service Major Projects
Gloucestershire CC / Neil Corbett / Head of Building Services
Cambridge Education & Islington / David Asquith / Head of Education Capital & Asst Management
Bracknell Forest Borough Council / Tony Chadwick / Head of Building Surveyors
Cheshire East Council / Debra Wrench / Head of Property Development & Projects
Calderdale MBC / Alan Winstanley / Principal Officer School Organisation & Planning
L B of Waltham Forest / Michael Rush
Windsor & maidenhead / Ann Pfeiffer / School Accommodation Officer
Haringey Council / David Mulford / Corporate Procurement Group
Cambridgeshire County Council / Steve Alderton / Head of Property (Commissioning)
Worcestershire CC / John Burton / CS Property Services
Poole / Hugh Lambourne / Senior Property Manager
Kent CC / Peter Binnie
Essex CC / Peter Geall / Head of Infrastructure Strategy
Coventry City Council / John Insley / Surveying Manager
LB of Islington / Claudia Newman / Procurement Assistant
East Riding of Yorkshire Council / Jocelyn Watson / Assistant Construction Officer
NPS South West Ltd (Devon CC) / Chris Jay / Director of Maintenance & Minor Works
Solihull / Neil Aldridge / Capital Development Manager
Stoke / Barrie Morgan / Premises Manager
Warwickshire / Dahlia Harrison / Asset Management Officer
Milton Keynes Council / John Tweed / Framework Manager
Sough Borough Council / Tony Madden

14 SURCHARGES FOR AREAS COVERED

Rollalong;

Basic rates apply to:-

Bracknell Forest Borough Council, Cambridge Education @ Islington, Cambridgeshire CC, Cornwall CC, Coventry City Council, Devon CC, Dorset CC, East Sussex CC, Essex CC, Gloucestershire CC, Hampshire CC, Haringey Council, Herefordshire CC, Kent CC, Leicestershire CC, London Boroughs (all), Medway Council, Milton Keynes Council, Northamptonshire CC, Oxfordshire CC, Poole Borough Council, Royal Borough of Windsor & Maidenhead, Shropshire CC, Slough Borough Council, Solihull MBC, Somerset CC, Southampton City Council, South Gloucestershire CC, Telford & Wrekin Council, West Sussex CC, Warwickshire CC, Wiltshire CC, Wokingham District Council, Wolverhampton MBC, Worcestershire CC.

Basic rates plus 10% apply to:

Cheshire CC, Cheshire East Council, Lincolnshire CC, Stoke City Council.

Basic rates plus 15% apply to:

Barnsley MBC, City of Bradford, East Riding of Yorkshire Council, Leeds City Council, MB of Calderdale, Sheffield City Council, Tameside MBC, Trafford MBC.

Basic rates plus 20% apply to:

Cleveland CC, Newcastle upon Tyne, Northumberland CC, North Tyneside MBC.

PILLAR : 0711 37:A:003