SUMMARY OF REQUIREMENTS

The following is a brief summary of the new Outline of Investigation for Multioutlet Assemblies, UL 111, which has a future Effective Date of July 30, 2015 and the action that may be required to determine compliance.

UL 111 First Edition

The following requirements were published by Underwriters Laboratories inc. and will require a review of currently Listed products.

Reference
(Clause/Par) / General comments
Scope 1 / The Outline addresses 50 – 400Hz Assemblies and DC assemblies.
400Hz is used in the airline Industry and is also addressed in UL 498 Attachment Plugs and Receptacles. The scope provides guidance on when to evaluate a Multioutlet Assembly with GFCI’s under the Standard For Ground Fault Circuit Interrupters, UL 943 or under UL 111. The scope also clarifies that cord and plug connected products are not covered by the Outline.
Glossary / Other than the standard terminology used within the Outline the glossary introduces new terminology specific to defining the type of Multioutlet Assembly as it relates to factory and field wiring. The purpose is to make it readily identifiable to the inspection authority what was provided as part of the factory assembly and what was added in the field.
Reference
(Clause/Par) / General comments

Construction

/ The basic requirements were derived from UL 5 and 5A with the intent of limiting the changes. Requirements were added
addressing Multioulet Assemblies that are shipped in sections due to size and the common practice of making the reassembly simple by use of modular connectors.
New requirements were added addressing Multioulet Assemblies that are not directly attached to the building surface and in some instances also support utilization equipment.
Requirements addressing the wiring and installation of devices have been included in the Outline. Supply conductor and grounding and bonding requirements have been included.

Performance

/ Tests to address product features that were not anticipated by UL 5 or 5A have been added and may be required:
Accessory Support
Suspended Load Test
Strain Relief
Cable Strain Relief
Strain Relief for Field Wiring Leads Test
Spill Test
Gaskets and Seals
Part II – Motor operated product
Markings and
Instructions / Requirements have been added that will require markings and installation instructions for Multioutlet Assemblies.
PART II –Motor Operated Multioutlet Assemblies / The requirements for motor operated Multioutlet Assemblies were placed in a Part II of the Outline for ease of use. The majority of the users of the document will not need to access the motor operated requirements.

A complete review of all products is anticipated.

CCNs:

PVGT, PVGT3 - Multioutlet Assemblies

PVUR, PVUR3 - Multioutlet Assembly Fittings