Sub : APPLICATION FOR THE POST OF PRODUCTION OPERATOR (OPERATION)

Respected Sir,

I am a B.Sc Industrial Chemistry degree holder and have totally 7 years of very good experience in process field oil/gas treatment plant. I have started my career from SOUTHERN PETROCHEMICAL INDUSTRIES CORPORATION LTD.,(SPIC), and involved commissioning in NATIONAL IRANIAN OIL COMPANY(THROUGH GS E&C) PHASES 9&10. Presently I m working in QATAR FERTILISER COMPANY (QAFCO).

I have good experience in operations of various types of pumps, High capacity compressors, columns, 2 Phase & 3 Phase separators, Steam Driven Turbines. Also well versed with all safety procedures and fire fighting systems, permit to work systems, on-Site, off-site Emergency preparedness plan of oil – gas plant.

I herewith enclosed two sets of my complete C.V for your kind perusal. If I will be given a chance for interview, I can prove my ability and knowledge. I hope you will consider my application favorably.

Thanking you

Place:Doha Yours faithfully,

Date:15.04.2011

(A.VIJAYA KUMAR)

POSITIONS HELD

Name of the employer

First Employer :SOUTHERN PETROCHEMICAL

INDUSTRIES CORPORATION LTD

(SPIC).

SPIC (09.06.04 to 11.05.05) : Rigorous Training in SPIC–Tuticorin

SPIC (12.05.05 to 10.05.08):Process plant panel Operator in On-shore

oil/gas treatment Plant – SPIC(Ammonia

Plant).

Second Employer (25.06.08 to 27.01.09): NATIONAL IRANIAN OIL COMPANY

IN IRAN PHASES 9&10

(On commissioning and operation)Commissioning DCS&FIELD Operator in

(i)Gas Sweetening Unit (GSU)

(ii)Gas Dehydration Unit (GDU)

(iii)MERCURY GUARD UNIT

(iv) DEMETHANISER AND DEETHANISER SECTION

(v)PROPANEREFRIGERATION UNIT

Present employer :QATAR FERTILISER COMPANY

From April 2009(11.04.09) : As a PROCESS OPERATORin

(i)GAS SWEETENIG UNIT

(ii)NATURAL GAS COMPRESSION

(iii) ROLLS ROYCE GG AVON UNIT

(iv) DRY SEAL GAS SYSTEM

EXPERIENCE IN TECHNICAL
  • Oil Storage – Tank Farm. Storage and Maintenance of FLOATING ROOF – Pantoon type tanks.
  • Reforming Section : HYDROCARBON cracking
  • CO2 Removal Section : Using potassium carbonate
  • Experience in 17 Stage axial compression ROLLS ROYCE GG AVON unit.
  • Well versed in the operations of Turbines, Compressors, Fans, Blowers, High Capacity Pumps, Vessels and Columns and other related Equipments.
  • Instrument cascading valve operations and Unit operations.
  • Experience in Standard Operations in oil and Gas Commission, NIOC,IRAN (Pig receiving, Gas Sweetening unit, Gas Dehydration unit).
NATURE OF JOB
  • Routine observation of process variables and maintaining process parameters.
  • Logging the process variables.
  • Raise PTW/work orders for maintenance to respective department.
  • Monitoring the condition of rotary equipments.
  • Isolating and handing over of Equipments for major maintenance.
  • Initiating and taking corrective actions during emergencies.
  • Minimizing the downtime for any maintenance work to avoid production loss.
  • Preparing procedures for major shutdowns, procedures writing.
  • Start up, Shutdown and trouble shooting operation and House Keeping.
PRE COMMISSIONING AND COMMISSIONIG
  • Work in deep integration with the construction team for optimizing the construction mechanical completion and pre-comm. Activities in parallel.
  • Ensuring the quality of constructionas per isometric diagrams–mechanical, electrical and instruments.
  • Preparing the final punch list after reinstatement of test packages.
  • Final P&ID checkup for commissioning.
OIL STORAGE (TANK FARM)FLOATING ROOF -Pantoon type tanks

This section consists of 5 tanks for storing naphtha and 2 tanks for storing furnace oil.

I am well versed with all safety aspects (Foam pourer, water sprinklers) and fire fighting technologies in the area

REFORMER UNIT
  • Catalytic Steam reforming section is designed to produce a mixture of gases containing H2, CO2, CO, CH4 and H2O at the rate of 26.818 T/Hr. There are 264 tubes (8 rows of 33 tubes) and 90 burners in 9 rows in reformer. Furnace is a top fire furnace, operated at –1.85mmwc. ID/FD fans are used to giving combustion air to reformer and maintaining –ve pressure. Metallic Nickel is the catalyst for reforming.
COMPRESSOR UNIT

Our Ammonia Plant is housed with three centrifugal compressors which together handles various gases catering to the needs of the plant. The prime mover for these compressors is steam and gas turbines.

Process air Compressor (PAC) of capacity 44, 800 Nm3/Hr

Loop refrigeration Compressor (LRC) of capacity 56,724 Nm3/Hr

Synthesis gas Compressor (SGC) of capacity 1,30,522 Nm3/Hr and a re-circulator of capacity 5,30,000 Nm3/Hr

PAC is meant for supplying process air to the system. LRC takes care of Refrigeration Jobs in the synthesis area. SGC Handles synthesis gas for ammonia production.

PAC and LRC is of horizontal split casing type while the SGC is of vertical split type. The syngas LP/IP and loop refrigeration Compressors have seal oil system to effect perfect shaft sealing. Syngas HP/CIRCULATOR hasDRY GAS SEALS. The auxiliary units of these Compressors like lube oil pump and seal oil pump are also turbine driven.

NIOC – IRAN, PHASES 9&10

GAS SWEETENING UNIT

Treating sour gas from slug catcher to remove H2S from 0.69mole% to less than 3 ppm. Capacity of 535 MMSCFD.The process involves Absorbtion at 85 KSC (1220 psi) pressure and Regeneration at 2.0 KSC (29 psi) Absorbent – Methyl Di Ethanol Amine (MDEA). The Solution (Absorbent ) used for absorbing H2S is MDEA (Methyl Diethanol Amine). In this unit Absorber, Regenerator, Reboilers, flash drum are mainly used to sweetening of gas. I have good experience in solution handling and safe operations.

GAS DEHYDRATION UNIT

The removal of moisture from 0.146 mole% present insweet gas to less than 0.1 ppm to reduce dehydrated sweet gas for further process (CI and C2 for downstream process). The hygroscopic medium is MOLECULAR SIEVE.

DEMETHANISER AND DEETHANISER

The two columns is a STRIPPER-ABSORBER columns, gives

Methane cut, Ethane cut and NGLs cut. Operating temp. of

Demethaniser is -92.50c and pressure is 30bar. Cold box unit and

JOULE THOMSONvalves are using to attain this operating

Conditions.

SAFETY

  • HAZOP STUDY TEAM - Member of Hazop Study Team. Identified all the hazard potentials in the plant and make suggestions to rectify the conditions. Carrying out planned inspections and safety tours.
  • TRIP DRILL – Once in two months trip drill is conducted to ensure the efficiency of the operator to act fast in emergency.
  • MOCK DRILL – Once in three months safety mock drill is conducted. Officials will inform a dangerous condition in our are and they will declare emergency. All the personnel will handle the situation efficiently, quickly and properly.
  • SAFETY PROCEDURES – Well experienced in handing over any equipment for maintenance in a SAFE WAY knowing all procedures like ELECTRICAL CLEARANCE, CABLE Disconnection / Connection, isolation, flushing, purging etc.
  • Good experience in following all safety procedures to be followed during Vessel Entry, Hot work like welding, cutting, high elevation job, excavation jobs etc.
  • Having good knowledge about LEL & HEL of various chemicals.
  • Well trained in using H2S detectors, Gas monitors.
  • PTW SYSTEM – Experienced in preparation, issuing and following up of permit systems for Hot work, Cold work, Vessel Entry, Road closer, Excavation, work etc.
  • PPEs – Well trained in wearing and using all Personal Protective Equipments (PPE), Self Contained Breathing Apparatus (SCBA) etc.

CONTROL AND SAFETY SYSTEMS

Well versed in safety systems consist of,

  • Process control system (PCS)-YOKOGAWA CENTUM CS-3000.
  • Emergency shutdown system (ESD)-HIMA H51Q-PLC.
  • Fire &Gas system (FGS) - HIMA H51Q-PLC.
  • High integrity pressure protection system (HIPPS)-HIMA H51Q PLC.

PERSONAL INFORMATION

POST APPLIED FOR / PRODUCTION OPERATOR (OPERATION)
Name
Age: 26 years
Address
Email / A.VIJAYA KUMAR
Date of Birth: 05.05.1984
29 OLD NO 11A,PUDHUMANAI FOURTH STREET,
SANKARAN KOVIL–627 756.
TAMIL NADU,
INDIA,
PH: 00974-33289047.
IND:0091-9944198452

MARITAL STATUS / Married
PASSPORT DETAILS / Passport No:G 5290598
Date of Issue:01.10.2007
Valid up to:30.09.2017

ACADEMIC QUALIFICATION

Bachelor Degree in Science (Industrial Chemistry) from MaduraikamarajarUniversity – Madurai, India.
EXPERIENCE / 7 Years in On-shore oil/gas treatment plant.
Languages Known / ENGLISH– Read, Write & Speak
TAMIL – Read, Write & Speak

FIRE FIGHTING

  • Well trained in operating all types of fire extinguishers.
  • Attended intensive fire fighting training.
  • Experienced in Fire protection and put-off procedures in Tank forms.
  • Well versed in On-site and Off-Site Emergency Preparedness Plan.
DECLARATION

With an experience of about 7years and has qualification as a Process Plant Operator (field and control room), I can work excellently to your entire satisfaction in any plant.

I hereby declare that all my operations and activities are aiming towards the modern concepts of industrial growth to obtain best on stream efficiently / capacity utilization, improved working environment with maximum pollution control / effluent control.

Thanking You,

Yours faithfully,

(A.VIJAYA KUMAR)