DZero RUN IIb FY03 SOW version 3.0

Statement of Work

by the

DZero Group at the University of Arizona

for Activities Related to the

DZero Run IIb Level 1 Calorimeter-Track Trigger Subsystem

During Fiscal Year 2003

March 4, 2003

1  Introduction

This Statement of Work (SOW) is made to provide the yearly details of the work agreed to between the DZero Run IIb Project and the DZero group at the University of Arizona. It covers the specific period of performance from October 1, 2002 through September 30, 2003. The Level 1 Calorimeter-Track Trigger system is shortened to L1 CalTrack below.

2  Collaborator Responsibilities

Describe the technical responsibilities being assumed for the DZero Run IIb Project a<Institution> t the University of Arizona. Please include commitments to (1) the design and associated development, (2) prototyping, (3) production, and (4) installation, commissioning, and integration being taken on by the University of Arizona over the next year:

3  Personnel

3.1  List of Scientific Personnel

Participating scientists with anticipated fraction of their research time committed to DZero during this period of performance are listed below. No support for these individuals comes from project funds.

Name / DZero Run IIb
Fraction / Other Research
Commitments/Comments
Kenneth Johns / 40% / DZero Run IIa
Erich Varnes / 40% / DZero Run IIa, BaBar

3.2  List of Technical Personnel

Participating technical personnel with the anticipated fraction of their time (time fractions are estimates) committed to DZero Run IIb during this period of performance and their source(s) of support are indicated below. The possible sources are DD0 = DOE, DZero Run IIb Project; DBG = DOE base grant, ND0 = NSF, DZero-specific MRI or other NSF non-base grant; NBG = NSF base grant, UID = university infrastructure, DOE-supported group; and UIN = university infrastructure, NSF-supported group as shown in the WBS.

3.2.1  Engineers

Name / DZero
Run IIb
Fraction (%) / Cost on DZero Run IIb Project this
FY (k$) / Source(s) of Support / WBS #’s / Salary fraction
Joel Steinberg / 80 / 10.179 in fy03k$ / UID, DD0 / 1.2.2.1.2
1.2.2.4.1
1.2.2.4.2
1.2.2.5.1
1.2.2.5.2
1.2.2.5.3
1.2.2.6.1
1.2.2.6.2
1.2.2.6.3
1.2.2.7.3.1
1.2.2.7.3.2
1.2.2.7.3.4
1.2.2.8.1.1
1.2.2.8.1.3
1.2.2.8.1.4
1.2.2.8.1.5
1.2.2.8.1.6
1.2.2.8.1.9
/ UID: 92%
DD0: 8%

3.2.2  Designers

Name / DZero
Run IIb
Fraction (%) / Cost on DZero Run IIb Project this
FY (k$) / Source of Support / WBS #’s / Salary fraction

3.2.3  Technical Specialists

Name / DZero
Run IIb
Fraction (%) / Cost on DZero Run IIb Project this
FY (k$) / Source of Support / WBS #’s / Salary fraction
Chris Leeman / 90 / 5.022 in fy03k$ / DD0 / 1.2.2.7.3.4
1.2.2.8.1.2
1.2.2.8.1.7
1.2.2.8.1.8
1.2.2.8.1.9 / DD0: 19%

3.2.4  Programmers

Name / DZero
Run IIb
Fraction (%) / Cost on DZero Run IIb Project this
FY (k$) / Source of Support / WBS #’s / Salary fraction
None

3.2.5  Others

Name / DZero
Run IIb
Fraction (%) / Cost on DZero Run IIb Project this
FY (k$) / Source of Support / WBS #’s / Salary fraction
None

4  Responsibilities for this Period of Performance

4.1  WBS Items, Estimated Cost and Deliverables

During this period of performance the DZero group at the University of Arizona agrees to supply the following deliverables at a cost not to exceed the estimated base cost given in the DZero Run IIb WBS. The following itemized list describes the items (or partial completion of items) provided in this period (Statements of Work).

WBS / Task - Deliverable / WBS Base Cost (FY02$) / FY03 Cost
(FY03$) / FNAL MPO / Other Sources
1.2.2.1.2
1.2.2.4.1
1.2.2.4.2
1.2.2.5.1
1.2.2.5.2
1.2.2.5.3
1.2.2.6.1
1.2.2.6.2
1.2.2.6.3
1.2.2.7.3.1
1.2.2.7.3.2
1.2.2.7.3.4
1.2.2.8.1.1
1.2.2.8.1.2
1.2.2.8.1.3
1.2.2.8.1.4
1.2.2.8.1.5
1.2.2.8.1.6
1.2.2.8.1.7
1.2.2.8.1.8
1.2.2.8.1.9
/ D0 production readiness review
Procure SLDB parts
Fabricate and assemble SLDBs
(Small) design changes to MTCxx
Procure MTCxx parts
Fabricate and assemble preprod MTCxx
(Small) design changes to MTCM
Procure MTCM parts
Fabricate and assemble MTCMs
Procure MTFB parts
Fabricate and assemble MTFB
Test MTFB
Procure cables and connectors
Assemble cables
Procure VME crates
Procure VME processors
Procure power supplies
Assemble and test power supplies
Procure MSPLIT crates, backplanes, and power supplies
Procure MSPLIT card parts
Fabricate and assemble MSPLIT cards
/ 2000.03
29153.22
11419.14
2296.32
23325.38
4005.04
1148.16
8626.08
4511.04
8623.09
6546.04
2787.52
16639.36
601.20
8973.15
8492.38
13689.58
4304.38
809.60
7507.80
12808.44
/ 2046.0352
29823.744
11681.784
2349.1354
23861.864
4097.1559
1174.5677
8824.4798
4614.7939
8821.419
6696.5989
2851.633
17022.063
615.0276
9179.5345
8687.7088
14004.444
4403.3848
828.2208
7680.4794
13103.034
/ 2046.0352
29823.744
11681.784
2349.1354
23861.864
4097.1559
1174.5677
8824.4798
4614.7939
8821.419
6696.5989
2851.633
17022.063
615.0276
9179.5345
8687.7088
14004.444
4403.3848
828.2208
7680.4794
13103.034
Total / Requested FY03 funds ($) / 182367.11 / 182367.11

4.2  Coordination and Reporting

The DZero Run IIb Level 2 Manager for the L1 CalTrack subsystem is Kenneth Johns. The institution contact person for L1 CalTrack activities at the University of Arizona is Kenneth Johns. The task managers for L1 CalTrack activities carried out by the DZero group at the University of Arizona are as follows:

Task / Task Manager
L1 CalTrack subsystem / Kenneth Johns

4.3  Procurement Authorization

Item purchases exceeding the delegated limit (currently $10k) must be authorized in advance of obligation by the DZero Run IIb Level 2 Manager. Major procurements (currently $50k) must in addition have the written authorization of the DZero Run IIb Project Manager.

4.4  Reporting to DZero Run IIb Project Management

The DZero group at the University of Arizona will report all DZero Run IIb-related expenditures and labor charges together with associated technical progress in each item of work by Work Breakdown Structure (WBS) category.

Technical progress will be reported by WBS element at the appropriate level to the Level2 Manager and the DZero Run IIb Project Manager on a monthly basis and will cover all items covered in this Statement of Work regardless of the specific nature of the funding support.

The DZero group at the University of Arizona agrees to furnish complete documentation of the quality control and performance checks which are carried out for the DZero Run IIb upgrade in the performance of this work.

4.5  Collaboration with Other Groups and Institutions

Design, construction and installation related to the L1 CalTrack subsystem will be carried out in close communication and collaboration with other groups working on this and related subsystems.

WBS/Task / Collaborating
Group / Responsibility with DZero group at the University of Arizona
None

5  Contribution of Effort, Services and Equipment

Subject to adequate funding by DOE or NSF, the DZero group at the University of Arizona will provide support for the scientific and technical personnel as indicated in section 2 during this period of performance. This contribution refers only to support provided outside the DZero Run IIb Project.

6  Fermilab Effort, Services and Facilities

Tracking of Fermilab DZero Run IIb support, whether provided by Fermilab or paid by the DZero Run IIb Project, will be done using appropriate effort reporting codes. The costs incurred will be reported to the Fermilab Director.

Contributing Fermilab personnel with the anticipated fraction of their time committed to DZero Run IIb during this period of performance and their source(s) of support are:

6.1  Administrative Staff

Name / DZero Run IIb
Fraction / Source of Support
None
6.2  Engineers
Name / DZero Run IIb
Fraction / Source of Support
None

6.3  Designers

Name / DZero Run IIb
Fraction / Source of Support
None

6.4  Technical Specialists

Name / DZero Run IIb
Fraction / Source of Support
None

6.5  Programmers

Name / DZero Run IIb
Fraction / Source of Support
None

6.6  Others

Name / DZero Run IIb
Fraction / Source of Support
None

7  Costs and Funding

A total amount of $182367.11 is detailed above for the full fiscal year. The MPO (Memorandum Purchase Order) portion will be paid by the DZero Run IIb Project Office upon receipt and approval of invoices for the work. Management control requires the review and concurrence of the Level 2 Manager and the Project Office, as needed, for major expenditures, as defined above. The release of funds above the given thresholds will be contingent upon this concurrence.

8  Schedules and Milestones

The DZero group at the University of Arizona will make every effort to carry out their institutional responsibilities consistent with the overall DZero Run IIb schedule. This Statement of Work contains a list of the program milestones for this period of performance.

The DZero Run IIb program milestones for this period of performance relevant to the DZero group at the University of Arizona are listed here:

Program Milestones / Baseline
Milestone
Date / Current
Milestone
Date
1.2.2.5.4
Fabrication and Assembly of L1 Trigger Cal-Trk Match Preproduction MTCxx Complete / 8/22/03 / 9/30/03
1.2.2.6.4
Fabrication and Assembly of L1 Trigger Cal-Trk Match MTCM's Complete / 10/20/03 / 9/30/03
1.2.2.7.2.4
Fabrication and Assembly of L1 Trigger Cal-Trk Match Prototype MTFB Complete / 5/14/03 / 5/30/03
1.2.2.7.3.3
Fabrication and Assembly of L1 Trigger Cal-Trk Match MTFB's Complete / 9/8/03 / 9/23/03

9  Makers and Concurrence

The following persons concur in the terms of this Statement of Work. These terms will be updated as appropriate in later Statements.

Makers of this Memorandum:

G. Blazey, J. Womersley (date) Kenneth Johns 3/4/03

Co-Spokespersons, DZero Experiment DZero Group Principal Investigator

University of Arizona

J. Kotcher (date) Dan Stein 3/4/03

Project Manager Department Head, Physics

DZero Run IIb Detector Project University of Arizona

R. Partridge (date)

Deputy Project Manager

DZero Run IIb Detector Project

V. O’Dell (date)

Associate Project Manager

DZero Run IIb Detector Project

Darien Wood (date)

DZero Run IIb Level 2 Manager

L1 CalTrack Subsystem

Hal Evans (date)

DZero Run IIb Level 2 Manager

L1 CalTrack Subsystem

Concurrence:

John Cooper (date)

Head, Particle Physics Division

Fermilab

Hugh Montgomery (date)

Associate Director for Research

Fermilab

XXX