State of Tennessee Electrical Wiring Permits:

Wiring Permits can be obtained at the Erwin Utilities’ Office.

Inspection Fee Schedule:

Temporary Service (61-200 amp) $27.00

Rough-In$27.00

Footer Ground Permit$27.00

Service Release(fee is based on service size)

Service Change$27.00 & up

Re-Inspection, if necessary$27.00 & up

Permit / Fee / $ 5.00
Final: / 61-200 amp / $27.00
201-400 amp / $40.00
401-600 amp / $50.00
601-1000 amp / $90.00

1001 amp & higher negotiated with State Deputy Electrical Inspector

Electrical Inspections:Electrical services cannot be provided until an approved electrical inspection is complete. Inspections are made by the State of Tennessee Deputy Inspector. It is the responsibility of the Customer to call the Deputy Inspector to schedule an inspection.

Inspector:Gene Rutherford

(423) 282-6742

Town of Erwin Building Inspections:

A Certificate of Occupancy from the Town of Erwin Building Inspector is required for all new structures requiring Electric, Water, and Wastewater services inside the city.It is the responsibility of the Customer to call the Town of Erwin Building Inspector to schedule an inspection.

Town of Unicoi Building Inspections:

A building inspection is required by the town of Unicoi for all new structures. It is the responsibility of the Customer to call the Town of Unicoi Building Inspector to schedule an inspection.

SERVICES

* Electricity, Water, & Sewer

*Security Lights, Parking Lot Lights, and Floodlights

*Erwin Utilities' Incentive for Construction of an Electric New Home

*Heat Pump Financing for New and Existing Homes

*Electric Water Heater Rebate Program

*Paperless Billing/E-Bill

* Online Bill Pay

*Budget Billing

*Residential Meter Base Surge Protection

*Bank Draft

* Social Security RecipientDue Date Adjustment

*Green Power Switch

*Poles for Mobile Home/Camper & Other Services

* Underground Service

* Good Samaritan Program

* Convenient Drive-Thru/Drop Box Service

Scan Here With Your Smartphone

For More Information

CUSTOMER SERVICE GUIDE

ERWIN UTILITIES

244 Love Street

P. O. Box 817

Erwin, TN 37650-0817

Open Monday –Friday 8:00am-4:30pm

(Except on Holidays)

TELEPHONE NUMBERS

General Info/Power Outages(423) 743-1820

Past Due Accounts(423) 743-1821

Engineering(423) 743-1844

Fax(423) 743-1833

SERVICES AND FEES

Connection Fees:

Electric and/or Water$20.00

Deposits:A cash security deposit will be required of any Customer before electric or water/wastewater services are supplied.Deposit amounts are determined by payment history with Erwin Utilities and Customer’s credit history. A letter of credit from another utility is not acceptable in lieu of a cash deposit.A Customer’s deposit is transferable to a new location, provided all current charges are paid in full at the current location.If a customer is disconnected for non-payment, an additional deposit amount may be required. Deposits made after July 1, 2013 will be refunded upon disconnection of services.

Billing:Customers receive statements approximately 15 days prior to their due date. Failure to receive a bill does not excuse customer from payment. Each route has a specific due date. Please check with an Erwin Utilities' account representative for your route and monthly due date.

Paperless/E-Bill:Electronic statements are available by signing up online at

Budget (Levelized) Billing Plan:This plan is available upon request to all residential customers who have been receiving service at their present location for at least twelve consecutive months. This plan provides residential customers a method of paying their monthly electric bills based on the rolling average of their last twelve-month's billing, plus any adjustments for rate increases which have occurred during that twelve-month period. On this plan a customer’s payment will fluctuate. Late payment of bill may result in removal from this program. Sign up in person, by phone, or by mail.

Due Date Adjustment:Social Securityrecipients may have their due date changed to the 5th of the month. Proof of being a social security recipient must be presented at office of the Distributor. Late payment of bill may result in removal from this program.

Payment Options:

Payment may either be mailed to P. O. Box 817 or paid at Erwin Utilities’ office at 244 Love Street.

A payment drop box with envelopes, for checks or money orders only, is provided for your convenience.

Payments can be made by phone at

1-866-585-5274 or online at for a $2.50 - $4.50 service fee.

Payments also taken at these locations:

Bank of Tennessee

1230 N Main Street

Erwin, TN 37650

Mountain Commerce Bank

201 S Main Street

Erwin, TN 37650

Mountain Commerce Bank

4200 Unicoi Drive

Unicoi, TN 37692

Bank Draft is automatic monthly payments that are conveniently withdrawn from your savings or checking account for free. Customer must sign an authorization form prior to enrollment.

Collection Trip Charge for Nonpayment:$20.00

Reconnection Fees after Turn-off for Nonpayment:

Regular Hours$30.00

After Hours$75.00

Returned Check Charge:$30.00

Meter Test Charge:

Electric or Water$25.00

(Refundable if accuracy is not found to be within legal limit of + or - 2 %.)

Tennessee One Call:

For underground line locating, stop and call

1-800-351-1111 or dial 811at least 72 hours before you dig.

Meter Tampering: It is unlawful and dangerous for individuals other than authorized Erwin Utilities’ representatives to connect or disconnect electrical service or otherwise tamper with electrical meters. State law provides strict penalties for such infraction and legal action will be taken.

Electric and Water Rate Schedules: Please refer to Erwin Utilities website at or call (423)743-1820, for residential and commercial rates as they change monthly.

Disconnection/Reconnection requested by the customer for repairs or maintenance:

After hours:
By meter, weatherhead, or pole / $ 120.00

Temporary Service Charge:$150.00 + $0.50 per foot of service drop in excess of 100 feet. Includes the connection fee.

Water Tapping Fees:

Water: ¾” Meter Size / Inside- / $ 800.00
Outside- / $1,125.00
1” Meter Size / Inside- / $1,055.00
Outside- / $1,480.00
Wastewater:
¾”meter & 4” waste- / Inside- / $1,275.00
water service line / Outside- / $1,600.00

Tapping Fees vary due to size of water meter andwastewater service lines. Contact Erwin Utilities’ Engineering Department for tapping fees not shown.Tapping Fees for new residential subdivisions, commercial developments, and industrial facilities are determined after a pre-construction evaluation.