/ Composite Request for Qualifications (RFQs)
Legal Notice(s)
QBS Selection Unit
Public Notice Date: March 01, 2006
State of Connecticut
Department of Public Works
Bureau of Design & Construction

State of Connecticut

Department of Public Works

165 Capitol Avenue, Hartford, CT 06106

General Statement: / In accordance with statutory requirements, the State of Connecticut, Department of Public Works is publishing these Legal Notices - Request(s for Qualifications (RFQs) - for the Contract(s) listed below:
Public Notice Date: /
March 01, 2006
State Contracting Portal: / Go to www.das.state.ct.us/busopp.asp to link to the DAS State Contracting Portal.
Selection Type(s): / On-Call only / Formal only / Formal & On-Call
DPW Contract Number: / Description of Required Consultant Services and Location:

BI-C-261&265-CA

/ Construction Administration Services:
New Adult Care Facility & Gen. Reno. (Water Main Distribution System)
@ Veterans’ Home, Rocky Hill, CT
BI-NN-627 / Sewer Plant Closure & Pump Station
@ Southbury Training School, Southbury, CT
BI-RD-233-CA / Construction Administration Services:
@ Western CT State University - Renovation of Fairfield Hall, Danbury, CT
CF-RC-350-ARC / Architect and Consultant Design Team:
@ Central CT State University - Renovations to Clarence Carroll Hall
CF-RS-262-Arc / Architect and Consultant Design Team:
@ Southern CT State University - Renovations to Farnham Hall
Oc-Dpw-CA0001-0006 / On-Call Construction Administration Services
Oc-Dpw-Engy007-010 / On-Call Energy Consultants
Oc-Dpw-Haz0005-0010 / On-Call Hazardous Materials Consultants
Web Advertisements: / For details on the requirements of this contract:
1.  Go to the DPW Website: www.ct.gov/dpw.
2.  Under Requests for Qualifications title, click on the Architecture / Engineering link.
3.  Under Open Requests for Qualifications (RFQs) title, click on DPW Contract Number(s) for the various contract(s) in which you have an interest.
Qualifications Submittals
Deadline
Delivery Location: / Deadline for the receipt of the QBS Submittal Booklets is:
3 p.m., Wednesday, March 22, 2006.
Above Deadline to be inserted by the Selection Unit.
State Office Building
Department of Public Works
Room 261
165 Capitol Avenue
Hartford, Connecticut 06106
Note: Failure to the submit properly formatted QBS Submittal Booklets with all of the required contents (including but not limited to Affidavits, Resolutions and Certificate of Authority) by the designated deadline and to the designated location may result in the Firm’s submittal being deemed deficient for consideration for this Contract.
Affidavit Submittals: / The Affidavit Requirements for Formal Contracts shall be determined from the Affidavits Button at the top left of the CT DPW home page: www.ct.gov/dpw .
As a minimum, the Submitter shall provide the Bid/Proposal Affidavit , Ethics Affidavit (s), Disclosure Affidavit and corollary Resolutions and Certificates of Authority .
The most accurate information concerning affidavits can be found by going directly to the DPW web page at www.ct.gov/dpw , clicking on the Affidavits link and then carefully reviewing all of the documentation presented (including but not limited to the Introduction link and General Advice for Filling Out Affidavits and Resolutions/Certificates of Authority link.
No forms, other than those posted on the DPW web page, shall be used by a consultant or design/builder.
Questions concerning affidavits shall be directed to the DPW Legal Services Division at 860-713-5680.
RFQ Contacts:
/ QBS Submittal Requirements Assistance:
CT DPW Selection Unit Supervisor
/
OR
/ CT DPW Selection Unit Secretary
Thomas C. Lowell, Architect
Room 261
165, Capitol Avenue
Hartford, Connecticut 06106 / Rose Mitchell
Room 261
165 Capitol Avenue
Hartford, Connecticut 06106
Fax: / 860 713-7272 / / Fax: / 860 713-7272
Email: / / Email: /
Note: Responses to requests for more specific contract information than is contained in these Legal Notices and Contract Web Advertisements shall be addressed only in the context of the scheduled Site Visit for Short-listed Firms.
Limited additional information, necessary to the completion of the CT DPW QBS Submission Process.
All requests for more specific contract information must be sent in writing (email acceptable).
(James T. Fleming - Commissioner Department of Public Works) / Date

The information below is for DPW Records only and is not to be included in the Legal Notice (do not remove the page break).

Make sure that the DPW Contract Number (ADV. No.) is on this pages header.

This original signature page, plus a hard copy of the front page should be put in the project file folder.

The information below is for DPW Records only and is not to be included in the Legal Notice (do not remove the page break).

Make sure that the DPW Contract Number (ADV. No.) is on this pages header.

This original signature page, plus a hard copy of the front page should be put in the project file folder.

DPW Contract Number: / Description of Required Consultant Services and Location:

BI-C-261&265-CA

/ Construction Administration Services:
New Adult Care Facility & Gen. Reno. (Water Main Distribution System)
@ Veterans’ Home, Rocky Hill, CT
BI-NN-627 / Sewer Plant Closure & Pump Station
@ Southbury Training School, Southbury, CT
BI-RD-233-CA / Construction Administration Services:
@ Western CT State University - Renovation of Fairfield Hall, Danbury, CT
CF-RC-350-ARC / Architect and Consultant Design Team:
@ Central CT State University - Renovations to Clarence Carroll Hall
CF-RS-262-ARC / Architect and Consultant Design Team:
@ Southern CT State University - Renovations to Farnham Hall
Oc-Dpw-CA0001-0006 / On-Call Construction Administration Services
Oc-Dpw-Engy007-010 / On-Call Energy Consultants
Oc-Dpw-Haz0005-0010 / On-Call Hazardous Materials Consultants

The information below is for DPW Records only and is not to be included in the Legal Notice (do not remove the page break).

Make sure that the DPW Contract Number (ADV. No.) is on this pages header.

This original signature page, plus a hard copy of the front page should be put in the project file folder.

Prior Approvals for the above referenced Contracts:

Scott Jellison
(Director of Project Management) / (DPM Signature) / (Date)
Bruce T. Bockstael
(Administrator of Client Teams) / (SPM Signature) / (Date)
Allen V. Herring
(Manager of Process Management) / (Signature) / (Date)
DPW Website Document / Page 3 of 3 / 116 021506-tcl