[Customer name] Systems Assurance Documentation Thunder 9200
System Assurance Objective:
The Systems Assurance (SA) process is designed to assist those involved in the sale, installation, and support of the 9200 to ensure that proper planning is done prior to installation by gathering the necessary information required for a successful installation of the HDS 9200 Disk Subsystem. The SA also facilitates the transfer of information between the customer and Hitachi Data Systems. With the information collected, HDS and the customer can better configure and tune the 9200.
Planned ProjectMilestones: / Start / Finish / Comments
Pre-Installation Plan
Install Phase
Testing Phases
Production Phases
Others
Customer Performance Expectations:
Documentation Questions / Action / Response / Verified date / Initials
Is Host to 9200 connectivity diagram / map completed?
Is Host to LUN map completed?
Have the necessary manuals been ordered?
Host to 9200 connection order chart completed?
SA documentation completed?
HDS / VAR Information: / Name / Phone # / Email
Project Leader
Customer project leader
VAR project leader
Assigned CS&S CE
Assigned CS&S SSE
Assigned SE / Sales Rep
CS&S Area/Country Manager / Skip Fitch /
Others:
General Customer Information:
Customer Address:
Customer Contacts:
(Name, Phone #, Email information)
Branch / Sub location:
HDS Sales Order #:
Order Request (OR) #:
Is this a new Install or an Upgrade?
Is the customer in Clarify database?
HDS Customer Site ID/Number?
Note: Check Feature Availability Report (FAR) for all appropriate levels. See useful links below.
9200 FAR: http://ntserv.hds.com/ssen/kb/storage/9200_far.zip
9200 Alerts: http://sanweb01.hds.com/support/Products/9200/technical/docs/alert/9200_alert.htm
Tech Aids: http://sanweb01.hds.com/support/Products/9200/technical/TechAids.htm
9200 Engineering Changes: http://sanweb01.hds.com/support/Products/9200/technical/EngineeringChanges.html
9200 Documentation: http://sanweb01.hds.com/support/Products/9200/technical/Documents.html
9200 ECN/FCB: http://hdsnet.hds.com/esd/IO/9200.htm
Storage Network Alerts: http://sanweb01.hds.com/support/storage/77X0/Ps-7700e/fibre/docmts/alerts/index.htm
Customer Physical Requirements: / Comments:Is there a loading dock available? / ¨ Yes / ¨ No
If yes, is the loading dock accessible by tractor-trailer? / ¨ Yes / ¨ No
Is a pallet jack required? / ¨ Yes / ¨ No
Is a truck with a lift-gate available? / ¨ Yes / ¨ No
Does the system need to be unpacked outside? / ¨ Yes / ¨ No
Is the outside area uncovered? / ¨ Yes / ¨ No
Are there any special flooring requirements and has the floor load requirements been checked? / ¨ Yes / ¨ No
Have the raised floor cutout arrangements been made?
See Appendix D for floor cutout diagrams / ¨ Yes / ¨ No
Have the HVAC requirements been reviewed? / ¨ Yes / ¨ No
Is any additional information required for inside delivery?
If Yes, please provide details: / ¨ Yes / ¨ No
Have the doorways and elevator clearances been checked along install route; are ramps provided to raised flooring (NO steps along route)? / ¨ Yes / ¨ No
For rack-mount 9200s, will its height fit through install routes doorways (It's a tall Rack, 38 EIA Units)? / ¨ Yes / ¨ No
Has the equipment location/arrangement been planned and diagrammed? / ¨ Yes / ¨ No
Hi-Track FTP and/or phone line available? / ¨ Yes / ¨ No / See Section 8 below
Has the Customer supplied the RM / Hi-Track PC / ¨ Yes / ¨ No
Order 9200 HiTrack Kit (HDS Part # = IP0826-1-P) / ¨ Yes / ¨ No
Hi-Track Telephone extension cable & coupler available? / ¨ Yes / ¨ No
Host SCSI/FC Cable Routes Identified? / ¨ Yes / ¨ No
Are the proper numbers of host attachment cables available or on order (SCSI or Fiber-Optic cables)? / ¨ Yes / ¨ No / See section 6 and 7d configuration tables
Is there a CE and/or spares storage space available? / ¨ Yes / ¨ No
9200 Electrical Requirements: (See 9200 Environmentals table and pages 5&6 for Details)
What type of 9200 installation is this? / ¨ 120VAC / ¨ 208VAC
Has the customer been provided with electrical requirements? / ¨ Yes / ¨ No
Locate and identify 9200 power source(s)? / ¨ Yes / ¨ No
Is there a backup power source available? (Generator, UPS, etc.) / ¨ Yes / ¨ No
Customer Power Distribution Unit(s) identified?
Primary PDU ID:______Secondary PDU ID:______ / ¨ Yes / ¨ No
Has the customer provided the proper number of receptacles? / ¨ Yes / ¨ No
Is there a UPS option package as part of this sub-system? / ¨ Yes / ¨ No
Is there a “Remote Power controller” as part of this sub-system? / ¨ Yes / ¨ No
¨ 208VAC - Customer provided (2) NEMA L620R (20 amp 208V AC Receptacles) for each pair of Rack Frame PDU (Power Distribution Units, HDS Part # 122234)
Notes for 220V: There are only 5 RK/RKAs allowed for a pair of PDUs if using 220V.
Therefore a full rack of 9200s will require 4 (2 pairs) of PDUs with 4 corresponding NEMA L620R receptacles.
¨ 120VAC - Customer provided (2) NEMA L520R (20 amp 120V AC Receptacles) for each pair of Rack Frame PDU (Power Distribution Units, HDS Part # 122234-110)
Notes for 110V: There are only 3 RK/RKAs allowed for a pair of PDUs if using 110V.
Therefore a full rack of 9200s will require 8 (4 pairs) of PDUs with 8 corresponding L520R receptacles.
¨ ??VAC - Customer provided (2) NEMA L630R (30 amp ??V AC Receptacles) for each pair of Rack Frame PDU (Power Distribution Units, HDS Part # ????)
Notes: What are the number of rack frame PDU required for 30Amp???
9200 Subsystem Environmentals (All 9200 Models)
Reference Chapter 3 of 9200 User & Reference Guide -- (MK-90DF504-4 or later)
Temperature 9200 / Humidity
Operating
Not operating
Transporting/storing
Temperature change rate
Max. wet bulb temperature / 10 -– 40 C
-10 –- 50 C
-30 -- 60 C
10 C/h
29 C / Operating humidity
Not operating Humidity
Operating vibration
Non-operating vibration
Transporting vibration / 8-80%
8-90%
2.5 G or less
5.0 G or less
5.0 G or less
Power Requirements / 9200 RK (base Unit) / 9200 RKA (expansion unit)
Voltage (V) / 89-127 V AC 178-254 VAC / 89-127 V AC 178-254 VAC
Frequency (Hz) / 50/60 ± 1 Hz / 50/60 ± 1 Hz
Nominal current (A) / 6.6/3.3 / 5.0/2.5
Breaking current (A) / 20 / 15
Required power in steady state (VA) / 660 / 500
Required power at start (VA) / 770 / 600
Power Notes for RK, RKA or RKL:
- the default cables for the 9200 (2 per unit) are DF-500-J2F types.
- if the 9200 is mounted in an HDS 19” rack, use DF-500-J2F types.
- if the 9200 is mounted in a non-HDS rack, contact the vendor for the connector type.
- if power recepticles in the rack are 110V, the cables required are DF-F500-J1F
Cable name
Part No.
Name
Quantity
Model
Applicable safety standard / rating
DF-F500-J1F
Power cable
1
Cable
¾
PVC code
UL and CSA
AC 125 V (13 A)
For standard use
2
Connector A
1
NEMA Standard 5-15P
3
Connector B
1
EN60324-C13
- if power recepticles in the rack are 220V, the cables required are DF-F500-J2F
Cable name
Part No.
Name
Quantity
Model
Applicable safety standard / rating
DF-F500-J2F
Power cable
1
Cable
¾
PVC code
UL and CSA
AC250 V(10 A)
For rack frame
2
Connector A
1
EN60324-C14
3
Connector B
1
EN60324-C13
Power Notes for HDS 19” Rack:
110V input power:
- customer must supply 2 NEMA L520R (20 amp 110V AC Receptacles) for each pair of PDU (Power Distribution Units).
Notes for 110V:
- there are only 3 RK/RKAs allowed for a pair of PDUs if using 110V. Therefore a full rack of 9200s will require 8 (4 pairs) of PDUs with 8 corresponding L520R recepticles.
220V input power: (Recommended)
- customer must supply two (2) NEMA L620R (20 amp 208V AC Recepticles) for each pair of PDU (Power Distribution Units).
Note for 220V: There are only 5 RK/RKAs allowed for a pair of PDUs if using 220V. Therefore a full rack of 9200s will require 4 (2 pairs) of PDUs with 4 corresponding NEMA L620R recepticles.
For more information refer to Hitachi Data Systems 19-inch Rack Reference Guide MK-90DF530-4
Information contained herein is considered HDS proprietary and confidential. Page 14 of 18
Use or disclosure of this information is restricted without consent of Hitachi Data Systems. Rev. CBM1-20
[Customer name] Systems Assurance Documentation Thunder 9200
1 / Thunder 9200 Model / Features / Description/Requirement/Yes/No/Comments /1a / Model Type:
¨ 9200 Deskside 10
¨ 9200 Deskside 20
¨ 9200 SE (SAN)**
¨ 9200 Rack (HDS U6 Rack)
¨ Custom Rack
(See section 1E and notes below) / Number of Interfaces:
¨ (1) Interface
¨ (2) Interfaces
¨ (3) Interfaces
¨ (4) Interfaces
Max interfaces: SCSI=2 / Fibre= 4
You CAN NOT Intermix SCSI and Fibre on same subsystem! / Type of Interfaces:
¨ SCSI-Wide
¨ SCSI-Ultra2 (LVD)
¨ Fibre (1Gbps)
¨ Fibre (2 Gbps)
Note: 1Gbps Fibre interface is standard on FC controller.
**9200SE - Can only support a maximum of 80 Disks [(1)RK+(7)RKAs] in rack due to space being taken by Brocade switches in top of rack.
**9200SE, Please fill-out Appendix A to cover the Brocade FC Switch configurations:
1b / Number of Controllers (1 / 2)
¨ Basic (1 Controller)
¨ +Optional 2nd Controller / Controller IP Information: IP Subnet Mask
IP Address Ctrl #1: Gateway
IP Address Crtr #2: Gateway
1c / Controller Cache (per controller):
¨ 512MB (512MB SIMM)
¨ 1280MB (Mixed) / Note: Dual controllers; must be same size cache.
¨ 768MB (Mixed)
¨ 1536MB (Mixed) / ¨ 1024MB (1024MB SIMM)
¨ 2048MB (1024MB SIMM)
1d / Is this a standard 9200 (64 LUN) subsystem or with the 128 LUN option?
¨ 64 LUN (Uses 05xx Microcode) or ¨ 128 LUN (Uses 355x Microcode)
Please see the "128LUN Handbook" for detail information. Document number MK-92DF578-0 available from Technical Publications http://hdsnet.hds.com/techpub/9200/mk-92df578/df5780.pdf
A custom rack enclosure that can be used to house the 9200 rack-mount units, must be (40) EIA units in height for a maximum configuration.
1e / ¨ Third Party Supplied Rack
§ Each RK = 6 EIA Units
§ Each RKA = 3.5 EIA Units
(See MK-91DF567-P or later) / RKs ______
RKAs + ______
Total EIA Units needed = ______(Max=40)
1f / 9200 Rack Mount Total Weight
¨ Base RK = < 155 lbs.
¨ For Each RKA =< 88 lbs. / Total Weight (lbs.) = ______
The maximum configuration of the 9200 disk array includes one RK unit and 9 RKA units.
The total weight of the subsystem in this configuration is 430 kg (950 lbs.)
Please find the latest HDS 19” rack “Configurator Worksheet” document posted on the 9200
Product Support webpage at: http://sanweb01.hds.com/support/storage/9200/9200.htm
3 / 9200 Raid and Disk Configuration:
3a / Number of RKAs (0-9 for Rack Mount models)? ______
3b / Total number of HDDs (3-100) including spare(s)? ______
3c / Number of "Spare" (0-5) HDDs? ______
Since RAID groups must be made up of consecutive disks, spare disks must not be placed between two disks that are in the same RAID group.
3d / RAID
TYPE / ¨ RAID0 (2-16D)
¨ RAID1 (1D+1P)
¨ RAID5 (2D-15D+1P) / ¨ Psudo RAID3 (4D+1P)
¨ RAID0+1 (2D+2P ~ 8D+8P)
¨ Other: ______
Number and Size of RAID Parity groups?
(20-RAID Groups Max)
3e / HDD
Drive Types: / ¨ 36GB 10K PRM
¨ 72GB 10K RPM
¨ 18GB 15K PRM / ¨ 180GB 7200 RPM
¨ Other ______
Note: It is not recommended to intermix different rpm HDDs due to performance considerations; also no mixing of drive capacity within the same RAID group. Spare must be the size of largest data drive.
4 / Open System Host Requirements:
4a / Type of Open Host System(s) / (Model xxx) / Notes & OS Patch Versions:
¨ AIX
¨ SGI IRIX
¨ HP-UX
¨ Novell Netware
¨ SUN Solaris
¨ Windows NT 4.x
¨ Windows 2000/2003
¨ Sequent Dynix/PTX
¨ Red Hat Linux
¨ Other
4b / Host Cluster Information:
¨ HP-UX (11.0)
¨ Solaris (2.6/2.7/2.8/2.9)
¨ AIX (5.1/5.2)
¨ WinNT (4.0)
¨ Windows 2000/2003
¨ Netware Cluster Server / Host Failover
¨ MC/SG
¨ VCS
¨ HACMP
¨ MCSC
¨ MCSC
¨ ??? / Path Failover
¨ Altlink
¨ VxVM-DMP/DLM
¨ HDLM 4.x
¨ HDLM 5.0x
¨ HDLM 5.1x
¨ Qlogic/Novell? / Note: Max number of cluster members is 128 per port.
4c / Path Failover Software/Version/patch level(s):
¨ VERITAS DMP Version/patch level: ______
¨ HP Alternate Link Version/patch level: ______
¨ Dynamic Link Manger (DLM) Version/patch level: ______
Note: The 9200 DFFM5 interfaces will not support Fabric login (F port) with Path Failover software at this time. DFFM6 will support the above. Keep this in mind if configuring Path Failover in combination with Fabric. FC_AL and FL_port connection is supported on all FC interfaces.
4d / Host Failover Software/Version/patch level(s):
¨ MC/SG Version/patch level: ______
¨ VCS Version/patch level: ______
¨ HACMP Version/patch level: ______
¨ MSCS Version/patch level: ______
¨ Qlogic NCS Version/patch level: ______
4e / HPÒ MC/ServiceGuard, SunÔ FirstWatch, IBMÒ HACMP?
4f / Dual Active Id Succession Required (See MK-90DF525-0 or later) ¨ Yes ¨ No
4g / Application Software/Version/patch level:
4h / Other Software running on host:
5 / Database Information:
5a / ¨ Oracle Release level: ______
¨ Sybase Release level: ______
¨ MS SQL Release level: ______
¨ Other Release level: ______
5b / Database Instances and mount point information:
6 / 9200 "copper" SCSI Configuration / Note: See VHDC Cable Info in Appendix C:
6a / ¨ Ultra-Wide / ¨ Ultra2 LVD
6b / Is a SCSI extender being used? (Paralan) / ¨ Yes / ¨ No
6c / Type/Length of SCSI cable used:
¨ Fast-Wide – 12Meter
¨ Fast-Wide – 15Meter
¨ Fast-Wide – 20Meter
¨ Other: ______ / ¨ Ultra2 LVD/FAST40 – 1Meter
¨ Ultra2 LVD/FAST 40 – 3Meter
¨ Ultra2 LVD/FAST 40 – 5Meter
¨ Ultra2 LVD/FAST 40 – 8Meter
SCSI: Ultra W/D, Ultra2 LVD**
LVD** (12 meter max bus length) W/D & Ultra (25 meter max bus length, 82.02 ft)
6d / Brand of SCSI HBA adapter(s) on the host?
7 / 9200 Fibre Channel (FC) Configuration