Shrikant Sharadrao Borkar Date -

35/3/4, “Swapapurti” Bldg A1 F-7,

Abhove Dhanlaxmi sweet,

Mohannagar

Dhankawadi

Pune -411043

Mob-Resi – 91 9423037210/91 9404234207

To, HR- Manager,

Sub- Application for suitable position

Dear Sir,

Total experience thatincludes work experience from start of Production Process flow to Final Assembly along with key functional Supporting skills to drive entire manufacturing process

  • Hands on experience in Automated PCB assembly machine Lines in Videocon International limited Aurangabad.
  • In charge Hitech production Environment Automated PCB assembly with Kalyani SHARP India limited Pune ,
  • Manager -ManufacturingEngineering Activities - Support to Videocon International limited thru BG Appliances Pvt. Ltd.
  • Manager –Works Assignments to Establish SMT lines QMS responsibility ISO Management Representetive, CerifiedInternal Auditor In SRV telecom Pvt Ltd Bangalore.
  • Line Manager -Manufacturing lead who leads QE,IE,ME,TE,HR,IA for Ecostar work cell in hitech Envoirment EMS production Facility JABIL Circuit Pune.
  • Production Manager - Embbeded Electronics manufacuring process of Automation Devices and timers. Responsibilites of Production Functions along with Quality (IQC,PQC ,FQC),Maintenance (Calibration Programming jigs fixtures), and NPI of new Models releases Device Firmware and Jig Software – in General industrial control -Pune

At Present I am working with “YB Techsolution Pvt Ltd which dealing with Tech Solution form Korea, Specisists in Consulting SMT Manufacturing Process.and Tech Solutions

I am sure you will give me an opportunity to be interviewedand I shall be glad to give any further information you may wish.

Thanking you

Yours faithfully

(Shrikant Sharadrado Borkar)

Shrikant Sharadrao Borkar

35/3/4, “Swapapurti” Bldg A1 F-7,Abhove Dhanlaxmi sweet ,Mohannagar Dhankawadi Pune -411043

Mobile-9423037210/+919404234207 Email:

Seeking Responsible assignments to Production /Quality with a technology driven organisation.

Professional Synopsis

Technocrat with over 20years of experience in Production with Maintenance activities in automated manufacturing of PCB Assembly shop for Axial, Radial, and SMT (Glue/Solder Paste) Parts. And final Assembly testing of Electronic products.

Proven skills in successful erection/ commissioning of various equipments. and Departmental layout set up.

Familiar with Kaizen activity , 7 QC tools ,5S,SMED

Certified Internal auditor ,Management Representative for ISO 9001:2008

Conversant with implementing TPM activities

Stupendous communication skills, honed with the ability to liaise with all the levels of the management.

Core Competencies

Operation / maintenance:

Production Planning as per Capacity and monitoring progresses including Material flow.

Effective preventive maintenance schedules of auto- insertion machines to increase machine up time and equipment reliability.

Proactively identifying areas of obstruction/breakdowns and take steps to rectify the equipments through application of trouble shooting tools.

Executing cost saving and energy saving activities /measures to achieve reduction in Expenditures and work within the budget.

Impart continuous on job training to the subordinates to enhance their operational efficiencies.

  • Here My Own all Level Experience makes easy to train my subordinates.

EMS (Electronic Manufacturing services):

Managing activities right from the conceptualization stage to the execution; involving , scheduling progress monitoring, testing & commissioning, manpower planning ,dispatch

Ensuring execution of activities / projects within time & budgetary parameters.

Quality Control/ Assurance:

Ensure adherence to quality standards and maintaining all related documents.

Identify areas of quality failures and take steps to rectify the system.

Practicing quality standards with key emphasis on improving quality.

Organisational Experience

NOV-12- till Date with YB TechSolution Pvt Ltd

Responsibility:-

1. Understand Techsolution requrment for customer and provide with support of Korea Specialists.

2. Explore EMS Facilities avalability and co-ordinates all Activities to furnish till delivery.

3. Introduce Technological Driven Solution to Indian market.

4.Counsulting For SMT manufacturing Process from machine Selection to process guidelines and finding Opportunity for Improvement

March-10 to Oct-12 – General Industrial Control Pvt. Ltd. Pune “Manager-Production”

-Responsible for Elerctronics Timers Manufacturing Activities. IQC/PQC/FQC/Jigs mainteances/firmware control document control VSS/ NPI- Hard ware Cell incharge.

-The Noteworthy Milestones:

Knowledge Sharing Experiance to All level of Organisation from Directors to operator.

-Established system for Planning /production /control in MTO and MTS ,High Products mix.

-Active Participation in implemntation of Axcepta. “As –is “(Microsoft ERP software.)

-Implemntation of E-waste rule 2011

-Lead free bath changeover ROHs

-Software/firmware control transactional control on VSS (Visual Safe Source)

-Products jig Team Development and Spares Management.

-PCBA – costing for Electronices Manufacturing Services (EMS)

-DOE (Design of Experiment) for use of 0603 SMT parts at Wave soldering process.

Sep-08 to March-10with Jabil Circuit India Pvt Ltd. As Line Manager.

Leading the work force of 450 Operators, 8 supervisors and supportive Departmental Tech lead in shift. Where Responsible for Production Operational activities from Pcba to Box build (Final Assembly) Lead the crossfunctional members HR,TE,QE,IE,ME to achive Quality Production objective.

-Involvement in5S, Improvement Team Establishment to utilise my own Experience.

-FPY – First Pass yield improvement team Member. Contibutes “ Reduction of Workman ship releated from 6% to 1.3%

Manufacturing Support to all Plant level.

-Support to Plant Level Projects

-Support to Estabilish ESD –S2020 standard to all over Plant. It incudes conductingAwerness

Trainning, Audits, Closers of ESD audits Points.

-Support to Closer of CAR (Correcive Actions), NCR Non conformance.

-Active Participation in Cycle count Activity conducted by Inventory Manager. And team.

Since 23rd Jan 2006 to Sep-08 with SRV Telecom Pvt Ltd. ( as

Manager –Works (SMT)

Rs 55 cores Turn over company involve in Various Telecommunication products and One of major vendor of BSNL.

The Noteworthy Milestones:

-Successfully implemented Production /Quality /Maintenance system for SMT section.

-Developed Available Manpower in company to shoulder independently SMT activities including shift working.

-Contract manufacturing for PCI ADSL cards for client ‘SASKEN’ and Free boards for Client ‘AWS ELECTRONICS UK...

-Involvement in Mfg. Process Control – Soldering Machine Quality Issues

-

-Support in Manufacturing Engineering Activities and contributing my own experience with all levels in Organisation.

-

-New Targets Contract manufacturing Set-up Expansion with new CM212 Panasonic advance Placement machines. – completed in JUNE -07

Since Feb’05 to Jan 06 with BG Appliances (P) Ltd. as Manager (Maintenance & ME).

(1year)

The Noteworthy Milestones:

Maintenance -

_ Auto- insertion arranged Training to fresh engineers with systematic schedule

_ Budgeting spares requirement for auto insertion – Pwb assembly line

_ Localisation of spares parts by studying form local vendor.

_ Implementing Maintenance schedules for plant and chassis line machinery.

_ Recruitment of Engineers/electrician/ fitters and on job training.

Manufacturing Engineering-(with co-ordination with Videocon)

_ ActivityInvolve Issue BOM /process sheets/ Auto-insertion machine programs

(SEQ-AXI-RAD)/ ICT programs debugging / new model Pilot production

_ Study and give solution to day to day faced problems on production line.

_ Rectify BOM discrepancy/ Implementation of change Note/etc.

Since Dec’95 – Feb’05 with Kalyani – Sharp (I) Ltd, Pune as Assistant Manager.

(9 years 2 months)

The Growth Path:

Appointed as Production Engineer in Dec’95.

Promoted as Assistant Manager in APR-2000.

The Noteworthy Milestones:

Setting up three shift Auto-insertion process( axial – Radial –SMD ) for VCR as part of 100 % EOU

Setting up Auto-insertion process (axial – Radial –SMD) for CTV.

A core team member of SAP-R/3 PP MODULE – area – Purchasing. From user end.

Achieved Auto- insertion Quality FTR 99.96%.

Simple Computerisation of Feedback analysis to come to conclusion and immediate action.

Reduce Model change over loss with SMED ( Single Minute exchange of Die)

Machine programmes Optimisation – Encourage machine Operators

Cost reduction in spares by localising and in house development of spares

- After Machine Operating Flexibility improved. Resulted in man / machine ratio= 0.7

Jan’89 – Nov’95 with Videocon International Ltd., Aurangabad as Technical Assistant-2.

(6 years 2 months)

The Growth Path:

Appointed as Technician in Jan’89.

Promoted as Technical Assistant in MAY-90

Promoted as Technical Assistant-2 in JULY-93

The Noteworthy Milestones:

Working experience - trouble shooting of CTV chassis

Active participant in Installation jigs-fixtures / conveyors

Operation / programming / maintenance of axial machine

Group leader for Quality activity

Technical Purview

Soldering machine – TSM 2000

EPS – Table Top WSM and EMS O wave WSM machine.

TOWTOW 2005 ( Semi automatic cut and clinch machine

SMT ( Surface mounting technology):

  • SPPG1 (Solder Paste Printer)
  • HDP-3 (Glue mounting machine)
  • MSH-2 (CHIP shooter machine)
  • BM123 ( Chip shooter)
  • MPA -G1 (IC mounter )
  • REFLOW- G1 Panasonic
  • Heller – Reflow – 1707 EXL(7 ZONE)

New Introduction to PT200 and CM-212 A CM212 D M SP18P-L Panasonic machine.

THT (Thru Hole technology) Axial and Radial inserter Machines from –

  • Panasonic – Axial jumper - JVK-2 Radial RH2-RH3
  • Dynapert / Universal: W 14000,V 12000,Accusert,Sequencer UCSM_G , VCD-G
  • Eyelet Machine – Mulserter- 200

Academic Credentials

1988Diploma In Industrial electronics from College - Girananjani Polytechnic Erandol MSBTE - Mumbai

Training Internal/External Training and Certification Attended :-

May – 2008 - ISO9001-2000 Internal Auditor Training -by NQA Bangalore.

DEC- 2008 - “Transformal Leader ship/High performance Team Building – by Beyond Horizons

August-2009 - ESD Basic Awerness – by ESD management $consultancy Pvt. Ltd

Sept - 2009 - Lean Six Sigma Black belt - By Anexas Denmark

Sept – 2009 - Team Certificate for FPY Improvemt PCBA – Certificate of Exceleance – Jabil

Sept - 2009 - Participation in Out door based Development programme – Jabil (High Placement)

June - 2010 - Problems and Promises of SMT BGAs and BTC in LF and world- - By Ray Prasad

April - 2012 - One Day program for E-waste (Management and handling Rule 2011)-

(CII(Confederation ofIndian Industry )

Dec- 2012 - Introduction program to Tokogi HARDA

Date of Birth: 28th February, 1969

Personal Information -

Marital status – Married Kid -2 Studyingin Pune (STD 11th and STD, 4th)

Interests / Hobbies Listen Music / Internet/ Reading books.

Date -

Place – PUNE Signature – Shrikant Sharadrao Borkar

1/4